HomeMy WebLinkAboutC22004537_Amazon Signal_RFI 011 - COR Approved_20230310GxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGx Gx Gx GxGx
Gx Gx Gx Gx Gx Gx Gx Gx Gx Gx Gx GxSSxSSx
SSx
SSx
SSx
SSx
SSx
SSx
SSx SSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSx
SSx SSxSSx SSx SSx SSx SSx SSx SSx SSx SSx SSx
SSxSSxSSxSSxSSxSSxSSx SSx SSx SSx SSx SSx SSx SSx SSx
SS
x
SSx SSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSx
SDx SDx SDx SDx SDx SDx SDx SDx SDx SDx SDx SDx SDx SDx SDx SDx SDx SDx SDx SDx SDxSDx
SDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxWx Wx Wx Wx Wx
Wx
Wx
Wx
Wx
Wx Wx Wx Wx WxWxWxWxWxWxWxWxWxWxWxWxWxWxWxWxWxWxWxWx Wx
Wx
Wx Wx Wx Wx Wx Wx Wx Wx WxUGPxUGPxUGPxUGPx
Gx Gx Gx Gx Gx Gx Gx Gx Gx Gx
WxWxWxWxWxWxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPx
UGPx UGPx UGPx UGPx UGPx UGPx UGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGP
x
UGPx UGPx UGPx UGPx UGPx
UGPx
UGPx UGPx UGPx UGPx UGPx UGPx
UGPx
UGPx
UGPxUGPx
UGPx UGPx UGPx
UGPx UGPx
UGPx
U
G
P
x
UGPx UGPx
UGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUG
P
x
UGPx UGPx UGPx UGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPx
UGPx
UGPx
UGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxFOxFOx FOx FOx FOxFOxFOxFOxFOxFOxFOxFOxFOxFOxFOxFOx
FOxFOxFOxFOxFOxFOx
FOx FOx FOx FOx FOxFOxFOxFOxFOxFOxFOxFOxFOxFOxFOxFOxFOxFOx FOx
F
O
x
FOx FOx FOx FOx FOx FOx FOxFOxFOxFOxFOxFOxFOxFOxFOx FOx FOx FOx FOx FOx FOx
FOxFOxFOxFOxFOxFOxFOx
UGTx UGTx UGTx UGTx UGTx UGT
x UGTxUGTx UGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTx UGTx UGTx UGTx UGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTx UGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTx
UGTx
UGTxUGTx UGTxUGTxUGTxUGTxUGTx UGTx
UGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTx
GxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxFOx FOx FOx FOx FOx FOx
FOx FOxSDx12+0013+0014+0015+0019+00 20+00 21+00PI: 20+00.00SW 19TH ST
LIND AVE SWIN COMPLIANCE WITH CITY OF RENTON STANDARDS
Lind Ave SW @ SW 19th St Interconnect 3.8.23.dwg19201 120th Ave NE, Suite 201
Bothell, WA 98011
425-951-4800 www.NV5.com
AN COMPANYTRO-41-4231SWA2 AMAZONLUA21-000233C22004537SWA2 AMAZON0'20'40'60'
FIBER ROUTING GENERAL NOTES
1.ALL WORK SHALL BE COMPLETED IN ACCORDANCE WITH THE WSDOT/APWA STANDARD PLANS,
STANDARD SPECIFICATIONS, LATEST AMENDMENTS TO THE STANDARD SPECIFICATIONS, CITY OF
RENTON STANDARD DETAILS, SPECIAL PROVISIONS AND THESE PLANS.
2.UTILITY LOCATION (DIAL-A-DIG) PRIOR TO CONSTRUCTION SHALL BE THE RESPONSIBILITY OF THE
CONTRACTOR. CONFLICTS SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER FOR
RESOLUTION.
3.FOR SIGNAL SYSTEMS COORDINATION WITH THE CITY OF RENTON, CONTRACTOR SHALL CONTACT
TRANSPORTATION MAINTENANCE DEPARTMENT REPRESENTATIVE ERIC CUTSHALL AT (425)
430-7423.
4.THE LOCATION OF ALL FEATURES TO BE INSTALLED BY THE CONTRACTOR ARE FOR GRAPHICAL
PRESENTATION ONLY. FINAL LOCATIONS SHALL BE VERIFIED BY THE ENGINEER IN THE FIELD PRIOR
TO INSTALLATION.
5.ALL NEW JUNCTION BOXES AND CABLE VAULTS PLACED IN THE SIDEWALKS SHALL HAVE SKID
RESISTANT LIDS AND FRAMES.
6.ALL NEW CONDUIT SHALL BE INSTALLED IN CITY OF RENTON RIGHT-OF-WAY OR EASEMENTS.
7.CONTRACTOR SHALL PROTECT EXISTING FIBER OPTIC CABLES AND CONDUITS FROM DAMAGE
DURING CONSTRUCTION.
8.NOT ALL TRAFFIC SIGNAL AND ILLUMINATION CONDUITS ARE SHOWN ON THIS SHEET. JUNCTION
BOXES NOT NOTED ON THIS SHEET MAY BE EXISTING OR PROPOSED SIGNAL OR ILLUMINATION
JUNCTION BOXES. FOR SIGNALIZATION & ILLUMINATION PLAN SEE SHEET #.
CONSTRUCTION NOTES
THERE IS AN EXISTING COPPER TELEMETRY CABLE IN CONDUIT ON THE WEST SIDE OF LIND AVE. THE
CABLE IS TO BE DISCONNECTED FROM THE SIGNAL CABINET AT SW 16TH ST AND USED AS A PULL
STRING TO FISH THE NEW FIBER CABLE IN THE EXISTING CONDUIT. THE REMNANTS OF THE
TELEMETRY CABLE IS TO BE CONNECTED IN THE CABINET TO PROVIDE CONNECTIVITY TO THE
TRAFFIC SIGNALS SOUTH OF SW 19TH ST ALONG LIND AVE.
6
LEGEND
SIGNAL POLE WITH MAST ARM AND LUMINAIRE
TYPE PPB POLE WITH PUSH BUTTON
TRAFFIC SIGNAL CONTROLLER CABINET
ELECTRICAL SERVICE CABINET
PULL BOX TYPE 2
TA-25 FIBER VAULT
CONDUIT
CONSTRUCTION NOTE
WIRE NOTE
#
#
WIRE NOTES
96 CT FO CABLESRACEWAY / CONDUIT SIZECOMMENTS#
14 2"1
15 2"1
16 EXISTING 1 12 PAIR COPPER TELEMETRY1514
7
THE TELEMETRY CABLE SHALL BE CONNECTED IN THE NEW SIGNAL CABINET VIA A NEW ACTELIS
684D ETHERNET OVER COPPER SWITCH.
7
T-423104
REPLACE FIBER OPTICS PEDESTAL AT THE SW CORNER WITH TA-25 FIBER VAULT IN LINE WITH THE
EXISTING TELEMETRY CABLE.
8
9
1514
MATCHLINE "A" (SEE SHEET 5)
REPLACE COPPER CABLE WITH FIBER
CABLE. SEE CONSTRUCTION NOTES.
INSTALL 100' OF SPARE FIBER CABLE IN TA-25 FIBER VAULT.9
8 DETECTABLE MULE TAPE1
0417 3"1
17
DIRECTIONAL DRILLING FOR 96-FIBER OPTIC CABLE AK 3/8/20233
3
3
ROUTE 95-FIBER CABLE IN NEW 3" CONDUIT TO BE BORED WITH NEW TYPE 2-MODIFIED JUNCITION
BOX AT STA 17+25
10
7
NOTE: ALL MINIMUM CLEARANCES FROM EXISTING UTILITIES WILL BE MAINTAINED.
ALL UTILITY CROSSINGS WILL BE POT HOLED.
BORING PIT SAME
LOCATION AS
FUTURE TA-25
BORING PIT
DEVELOPMENT ENGINEERING
Michael Sippo 03/10/2023
hdpe. 36" in depth
avg. min 24".
GxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDx SDx SDx SDx
WxWxWxWxWxWxWxWxWxWxWxWxWxWxWxWxWx
Wx Wx WxWxWxWxWxWxWx
UGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxGxGxGxGxGxGxGxGxGxGxGxGxGxGxSSx SSx SSx SSx
SSxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGPxUGPxUGPxUGPxGxUGTxUGTxUGTxWxWxWxWxWxWxWxUGPxUGPxUGPxWxWxWxWxSSxSSx
UGPx
UGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPx16+0017+0018+0019+00LIND AVE SWSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSDxSDxSDxSDxGxGxGxUGPxUGPxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxWxWxWxWxWxWxWxWxWxWxWxWxWxWxWxWxWxWxWxWxWxWxWxWxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxWx Wx Wx Wx Wx Wx Wx
Wx
SSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSx
SS
x
SSx
SDx SDx
UGTx UGTx UGTx
SDx SDx SDx SDx SDx SDx SDx
SDx
SDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDx
20+0021+0022+00LIND AVE SWIN COMPLIANCE WITH CITY OF RENTON STANDARDS
Lind Ave SW @ SW 19th St Interconnect 3.8.23.dwg19201 120th Ave NE, Suite 201
Bothell, WA 98011
425-951-4800 www.NV5.com
AN COMPANYTRO-41-4231SWA2 AMAZONLUA21-000233C22004537SWA2 AMAZON0'20'40'60'
T-423105
CONSTRUCTION NOTES
THERE IS AN EXISTING COPPER TELEMETRY CABLE IN CONDUIT ON THE WEST SIDE OF LIND AVE. THE
CABLE IS TO BE DISCONNECTED FROM THE SIGNAL CABINET AT SW 16TH ST AND USED AS A PULL
STRING TO FISH THE NEW FIBER CABLE IN THE EXISTING CONDUIT. THE REMNANTS OF THE
TELEMETRY CABLE IS TO BE CONNECTED IN THE CABINET TO PROVIDE CONNECTIVITY TO THE
TRAFFIC SIGNALS SOUTH OF SW 19TH ST ALONG LIND AVE.
1
THE TELEMETRY CABLE SHALL BE CONNECTED IN THE NEW SIGNAL CABINET VIA A NEW ACTELIS
684D ETHERNET OVER COPPER SWITCH.
2
RELOCATE FIBER OPTICS PEDESTAL AT THE SW CORNER TO BEHIND THE PROPOSED SIDEWALK.3
MATCHLINE "B" (SEE BELOW)MATCHLINE "C" (SEE SHEET 6)
MATCHLINE "B" (SEE ABOVE)MATCHLINE "A" (SEE SHEET 4)
WIRE NOTES
0596 CT FO CABLESRACEWAY / CONDUIT SIZECOMMENTS#
14 2"1
15 2"1
16 EXISTING 1 12 PAIR COPPER TELEMETRYREPLACE COPPER CABLE WITH FIBER
CABLE. SEE CONSTRUCTION NOTES.DETECTABLE MULE TAPE
1
17 3"1
17
17
DIRECTIONAL DRILLING FOR 96-FIBER OPTIC CABLE AK 3/8/20233
3
3
3
ROUTE 95-FIBER CABLE IN NEW 3" CONDUIT TO BE BORED WITH NEW TYPE 2-MODIFIED JUNCITION
BOX AT STA 17+25
4
4
4
NOTE: ALL MINIMUM CLEARANCES FROM EXISTING UTILITIES WILL BE MAINTAINED.
ALL UTILITY CROSSINGS WILL BE POT HOLED.
TYPE 2M BOX
FOR PULL PORT
IN CURB SIDE
PLANTER
DEVELOPMENT ENGINEERING
Michael Sippo 03/10/2023
GxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGx Gx Gx Gx Gx Gx Gx Gx Gx
GxGx
GxGxGxGxGxGxGxGxGxGxGxGxGxGxGxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTx
UGTxUGPxUGP
x
UGPxUGPxUGPxUGPxUGPx UGPx
UG
P
x
Gx Gx Gx Gx Gx Gx Gx Gx Gx Gx Gx Gx Gx Gx
UGPx UGPx UGPx UGPx
UGPx UGPxUGPxUGPxUGPxUGPxUGPxUG
P
x
UGPx
UGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxWxWxWxWxWxWxWxWxWxWxWxWxWxWxWxWxWxWxWxWxWxWxWx Wx Wx Wx Wx Wx Wx Wx WxGx
GxGxGxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGTx
UGTx
UGTx UGTxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSx SSx SSx SSx SSx SSx SSx SSx SSx SSx
SSx
SDx SDx SDx SDx SDx
SDxSDxSDxSDxSDxSDxSDxSDx23+0024+0025+0025+38EP: 25+37.51
LIND AVE SWSW 16TH ST
IN COMPLIANCE WITH CITY OF RENTON STANDARDS
Lind Ave SW @ SW 19th St Interconnect 3.8.23.dwg19201 120th Ave NE, Suite 201
Bothell, WA 98011
425-951-4800 www.NV5.com
AN COMPANYTRO-41-4231SWA2 AMAZONLUA21-000233C22004537SWA2 AMAZON0'20'40'60'
T-423106
CONSTRUCTION NOTES
THERE IS AN EXISTING COPPER TELEMETRY CABLE IN CONDUIT ON THE WEST SIDE OF LIND AVE. THE
CABLE IS TO BE DISCONNECTED FROM THE SIGNAL CABINET AT SW 16TH ST AND USED AS A PULL
STRING TO FISH THE NEW FIBER CABLE IN THE EXISTING CONDUIT. THE REMNANTS OF THE
TELEMETRY CABLE IS TO BE CONNECTED IN THE CABINET TO PROVIDE CONNECTIVITY TO THE
TRAFFIC SIGNALS SOUTH OF SW 19TH ST ALONG LIND AVE.
1
THE TELEMETRY CABLE SHALL BE CONNECTED IN THE NEW SIGNAL CABINET VIA A NEW ACTELIS
684D ETHERNET OVER COPPER SWITCH.
2
RELOCATE FIBER OPTICS PEDESTAL AT THE SW CORNER TO BEHIND THE PROPOSED SIDEWALK.3
MATCHLINE "C" (SEE SHEET 5)
WIRE NOTES
EXISTING SIGNAL
CONTROL CABINET06 96 CT FO CABLESRACEWAY / CONDUIT SIZECOMMENTS#
14 2"1
15 2"1
16 EXISTING 1 12 PAIR COPPER TELEMETRY
REPLACE COPPER CABLE WITH FIBER
CABLE. SEE CONSTRUCTION NOTES.DETECTABLE MULE TAPE
1
17 3"1
17
NOTE: ALL MINIMUM CLEARANCES FROM EXISTING UTILITIES WILL BE MAINTAINED.
ALL UTILITY CROSSINGS WILL BE POT HOLED.
DIRECTIONAL DRILLING FOR 96-FIBER OPTIC CABLE AK 3/8/20233
3
3
ROUTE 95-FIBER CABLE IN NEW 3" CONDUIT TO BE BORED WITH NEW TYPE 2-MODIFIED JUNCITION
BOX AT STA 17+25
4
4
RECEIVING PIT IS
IN FRONT OF
EXISTING 25-TA
ON SW CORNER
OF SW 16TH ST &
LIND AVE
DEVELOPMENT ENGINEERING
Michael Sippo 03/10/2023