Loading...
HomeMy WebLinkAboutC22004537_Amazon Signal_RFI 011 - COR Approved_20230310GxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGx Gx Gx GxGx Gx Gx Gx Gx Gx Gx Gx Gx Gx Gx Gx GxSSxSSx SSx SSx SSx SSx SSx SSx SSx SSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSx SSx SSxSSx SSx SSx SSx SSx SSx SSx SSx SSx SSx SSxSSxSSxSSxSSxSSxSSx SSx SSx SSx SSx SSx SSx SSx SSx SS x SSx SSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSx SDx SDx SDx SDx SDx SDx SDx SDx SDx SDx SDx SDx SDx SDx SDx SDx SDx SDx SDx SDx SDxSDx SDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxWx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx WxWxWxWxWxWxWxWxWxWxWxWxWxWxWxWxWxWxWxWx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx WxUGPxUGPxUGPxUGPx Gx Gx Gx Gx Gx Gx Gx Gx Gx Gx WxWxWxWxWxWxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPx UGPx UGPx UGPx UGPx UGPx UGPx UGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGP x UGPx UGPx UGPx UGPx UGPx UGPx UGPx UGPx UGPx UGPx UGPx UGPx UGPx UGPx UGPxUGPx UGPx UGPx UGPx UGPx UGPx UGPx U G P x UGPx UGPx UGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUG P x UGPx UGPx UGPx UGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPx UGPx UGPx UGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxFOxFOx FOx FOx FOxFOxFOxFOxFOxFOxFOxFOxFOxFOxFOxFOx FOxFOxFOxFOxFOxFOx FOx FOx FOx FOx FOxFOxFOxFOxFOxFOxFOxFOxFOxFOxFOxFOxFOxFOx FOx F O x FOx FOx FOx FOx FOx FOx FOxFOxFOxFOxFOxFOxFOxFOxFOx FOx FOx FOx FOx FOx FOx FOxFOxFOxFOxFOxFOxFOx UGTx UGTx UGTx UGTx UGTx UGT x UGTxUGTx UGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTx UGTx UGTx UGTx UGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTx UGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTx UGTx UGTxUGTx UGTxUGTxUGTxUGTxUGTx UGTx UGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTx GxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxFOx FOx FOx FOx FOx FOx FOx FOxSDx12+0013+0014+0015+0019+00 20+00 21+00PI: 20+00.00SW 19TH ST LIND AVE SWIN COMPLIANCE WITH CITY OF RENTON STANDARDS Lind Ave SW @ SW 19th St Interconnect 3.8.23.dwg19201 120th Ave NE, Suite 201 Bothell, WA 98011 425-951-4800 www.NV5.com AN COMPANYTRO-41-4231SWA2 AMAZONLUA21-000233C22004537SWA2 AMAZON0'20'40'60' FIBER ROUTING GENERAL NOTES 1.ALL WORK SHALL BE COMPLETED IN ACCORDANCE WITH THE WSDOT/APWA STANDARD PLANS, STANDARD SPECIFICATIONS, LATEST AMENDMENTS TO THE STANDARD SPECIFICATIONS, CITY OF RENTON STANDARD DETAILS, SPECIAL PROVISIONS AND THESE PLANS. 2.UTILITY LOCATION (DIAL-A-DIG) PRIOR TO CONSTRUCTION SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. CONFLICTS SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER FOR RESOLUTION. 3.FOR SIGNAL SYSTEMS COORDINATION WITH THE CITY OF RENTON, CONTRACTOR SHALL CONTACT TRANSPORTATION MAINTENANCE DEPARTMENT REPRESENTATIVE ERIC CUTSHALL AT (425) 430-7423. 4.THE LOCATION OF ALL FEATURES TO BE INSTALLED BY THE CONTRACTOR ARE FOR GRAPHICAL PRESENTATION ONLY. FINAL LOCATIONS SHALL BE VERIFIED BY THE ENGINEER IN THE FIELD PRIOR TO INSTALLATION. 5.ALL NEW JUNCTION BOXES AND CABLE VAULTS PLACED IN THE SIDEWALKS SHALL HAVE SKID RESISTANT LIDS AND FRAMES. 6.ALL NEW CONDUIT SHALL BE INSTALLED IN CITY OF RENTON RIGHT-OF-WAY OR EASEMENTS. 7.CONTRACTOR SHALL PROTECT EXISTING FIBER OPTIC CABLES AND CONDUITS FROM DAMAGE DURING CONSTRUCTION. 8.NOT ALL TRAFFIC SIGNAL AND ILLUMINATION CONDUITS ARE SHOWN ON THIS SHEET. JUNCTION BOXES NOT NOTED ON THIS SHEET MAY BE EXISTING OR PROPOSED SIGNAL OR ILLUMINATION JUNCTION BOXES. FOR SIGNALIZATION & ILLUMINATION PLAN SEE SHEET #. CONSTRUCTION NOTES THERE IS AN EXISTING COPPER TELEMETRY CABLE IN CONDUIT ON THE WEST SIDE OF LIND AVE. THE CABLE IS TO BE DISCONNECTED FROM THE SIGNAL CABINET AT SW 16TH ST AND USED AS A PULL STRING TO FISH THE NEW FIBER CABLE IN THE EXISTING CONDUIT. THE REMNANTS OF THE TELEMETRY CABLE IS TO BE CONNECTED IN THE CABINET TO PROVIDE CONNECTIVITY TO THE TRAFFIC SIGNALS SOUTH OF SW 19TH ST ALONG LIND AVE. 6 LEGEND SIGNAL POLE WITH MAST ARM AND LUMINAIRE TYPE PPB POLE WITH PUSH BUTTON TRAFFIC SIGNAL CONTROLLER CABINET ELECTRICAL SERVICE CABINET PULL BOX TYPE 2 TA-25 FIBER VAULT CONDUIT CONSTRUCTION NOTE WIRE NOTE # # WIRE NOTES 96 CT FO CABLESRACEWAY / CONDUIT SIZECOMMENTS# 14 2"1 15 2"1 16 EXISTING 1 12 PAIR COPPER TELEMETRY1514 7 THE TELEMETRY CABLE SHALL BE CONNECTED IN THE NEW SIGNAL CABINET VIA A NEW ACTELIS 684D ETHERNET OVER COPPER SWITCH. 7 T-423104 REPLACE FIBER OPTICS PEDESTAL AT THE SW CORNER WITH TA-25 FIBER VAULT IN LINE WITH THE EXISTING TELEMETRY CABLE. 8 9 1514 MATCHLINE "A" (SEE SHEET 5) REPLACE COPPER CABLE WITH FIBER CABLE. SEE CONSTRUCTION NOTES. INSTALL 100' OF SPARE FIBER CABLE IN TA-25 FIBER VAULT.9 8 DETECTABLE MULE TAPE1 0417 3"1 17 DIRECTIONAL DRILLING FOR 96-FIBER OPTIC CABLE AK 3/8/20233 3 3 ROUTE 95-FIBER CABLE IN NEW 3" CONDUIT TO BE BORED WITH NEW TYPE 2-MODIFIED JUNCITION BOX AT STA 17+25 10 7 NOTE: ALL MINIMUM CLEARANCES FROM EXISTING UTILITIES WILL BE MAINTAINED. ALL UTILITY CROSSINGS WILL BE POT HOLED. BORING PIT SAME LOCATION AS FUTURE TA-25 BORING PIT DEVELOPMENT ENGINEERING Michael Sippo 03/10/2023 hdpe. 36" in depth avg. min 24". GxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDx SDx SDx SDx WxWxWxWxWxWxWxWxWxWxWxWxWxWxWxWxWx Wx Wx WxWxWxWxWxWxWx UGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxGxGxGxGxGxGxGxGxGxGxGxGxGxGxSSx SSx SSx SSx SSxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGPxUGPxUGPxUGPxGxUGTxUGTxUGTxWxWxWxWxWxWxWxUGPxUGPxUGPxWxWxWxWxSSxSSx UGPx UGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPx16+0017+0018+0019+00LIND AVE SWSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSDxSDxSDxSDxGxGxGxUGPxUGPxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxWxWxWxWxWxWxWxWxWxWxWxWxWxWxWxWxWxWxWxWxWxWxWxWxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxWx Wx Wx Wx Wx Wx Wx Wx SSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSx SS x SSx SDx SDx UGTx UGTx UGTx SDx SDx SDx SDx SDx SDx SDx SDx SDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDx 20+0021+0022+00LIND AVE SWIN COMPLIANCE WITH CITY OF RENTON STANDARDS Lind Ave SW @ SW 19th St Interconnect 3.8.23.dwg19201 120th Ave NE, Suite 201 Bothell, WA 98011 425-951-4800 www.NV5.com AN COMPANYTRO-41-4231SWA2 AMAZONLUA21-000233C22004537SWA2 AMAZON0'20'40'60' T-423105 CONSTRUCTION NOTES THERE IS AN EXISTING COPPER TELEMETRY CABLE IN CONDUIT ON THE WEST SIDE OF LIND AVE. THE CABLE IS TO BE DISCONNECTED FROM THE SIGNAL CABINET AT SW 16TH ST AND USED AS A PULL STRING TO FISH THE NEW FIBER CABLE IN THE EXISTING CONDUIT. THE REMNANTS OF THE TELEMETRY CABLE IS TO BE CONNECTED IN THE CABINET TO PROVIDE CONNECTIVITY TO THE TRAFFIC SIGNALS SOUTH OF SW 19TH ST ALONG LIND AVE. 1 THE TELEMETRY CABLE SHALL BE CONNECTED IN THE NEW SIGNAL CABINET VIA A NEW ACTELIS 684D ETHERNET OVER COPPER SWITCH. 2 RELOCATE FIBER OPTICS PEDESTAL AT THE SW CORNER TO BEHIND THE PROPOSED SIDEWALK.3 MATCHLINE "B" (SEE BELOW)MATCHLINE "C" (SEE SHEET 6) MATCHLINE "B" (SEE ABOVE)MATCHLINE "A" (SEE SHEET 4) WIRE NOTES 0596 CT FO CABLESRACEWAY / CONDUIT SIZECOMMENTS# 14 2"1 15 2"1 16 EXISTING 1 12 PAIR COPPER TELEMETRYREPLACE COPPER CABLE WITH FIBER CABLE. SEE CONSTRUCTION NOTES.DETECTABLE MULE TAPE 1 17 3"1 17 17 DIRECTIONAL DRILLING FOR 96-FIBER OPTIC CABLE AK 3/8/20233 3 3 3 ROUTE 95-FIBER CABLE IN NEW 3" CONDUIT TO BE BORED WITH NEW TYPE 2-MODIFIED JUNCITION BOX AT STA 17+25 4 4 4 NOTE: ALL MINIMUM CLEARANCES FROM EXISTING UTILITIES WILL BE MAINTAINED. ALL UTILITY CROSSINGS WILL BE POT HOLED. TYPE 2M BOX FOR PULL PORT IN CURB SIDE PLANTER DEVELOPMENT ENGINEERING Michael Sippo 03/10/2023 GxGxGxGxGxGxGxGxGxGxGxGxGxGxGxGx Gx Gx Gx Gx Gx Gx Gx Gx GxGx GxGxGxGxGxGxGxGxGxGxGxGxGxGxGxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTx UGTxUGPxUGP x UGPxUGPxUGPxUGPxUGPx UGPx UG P x Gx Gx Gx Gx Gx Gx Gx Gx Gx Gx Gx Gx Gx Gx UGPx UGPx UGPx UGPx UGPx UGPxUGPxUGPxUGPxUGPxUGPxUG P x UGPx UGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxWxWxWxWxWxWxWxWxWxWxWxWxWxWxWxWxWxWxWxWxWxWxWx Wx Wx Wx Wx Wx Wx Wx WxGx GxGxGxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGPxUGTx UGTx UGTx UGTxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSxSSx SSx SSx SSx SSx SSx SSx SSx SSx SSx SSx SDx SDx SDx SDx SDx SDxSDxSDxSDxSDxSDxSDxSDx23+0024+0025+0025+38EP: 25+37.51 LIND AVE SWSW 16TH ST IN COMPLIANCE WITH CITY OF RENTON STANDARDS Lind Ave SW @ SW 19th St Interconnect 3.8.23.dwg19201 120th Ave NE, Suite 201 Bothell, WA 98011 425-951-4800 www.NV5.com AN COMPANYTRO-41-4231SWA2 AMAZONLUA21-000233C22004537SWA2 AMAZON0'20'40'60' T-423106 CONSTRUCTION NOTES THERE IS AN EXISTING COPPER TELEMETRY CABLE IN CONDUIT ON THE WEST SIDE OF LIND AVE. THE CABLE IS TO BE DISCONNECTED FROM THE SIGNAL CABINET AT SW 16TH ST AND USED AS A PULL STRING TO FISH THE NEW FIBER CABLE IN THE EXISTING CONDUIT. THE REMNANTS OF THE TELEMETRY CABLE IS TO BE CONNECTED IN THE CABINET TO PROVIDE CONNECTIVITY TO THE TRAFFIC SIGNALS SOUTH OF SW 19TH ST ALONG LIND AVE. 1 THE TELEMETRY CABLE SHALL BE CONNECTED IN THE NEW SIGNAL CABINET VIA A NEW ACTELIS 684D ETHERNET OVER COPPER SWITCH. 2 RELOCATE FIBER OPTICS PEDESTAL AT THE SW CORNER TO BEHIND THE PROPOSED SIDEWALK.3 MATCHLINE "C" (SEE SHEET 5) WIRE NOTES EXISTING SIGNAL CONTROL CABINET06 96 CT FO CABLESRACEWAY / CONDUIT SIZECOMMENTS# 14 2"1 15 2"1 16 EXISTING 1 12 PAIR COPPER TELEMETRY REPLACE COPPER CABLE WITH FIBER CABLE. SEE CONSTRUCTION NOTES.DETECTABLE MULE TAPE 1 17 3"1 17 NOTE: ALL MINIMUM CLEARANCES FROM EXISTING UTILITIES WILL BE MAINTAINED. ALL UTILITY CROSSINGS WILL BE POT HOLED. DIRECTIONAL DRILLING FOR 96-FIBER OPTIC CABLE AK 3/8/20233 3 3 ROUTE 95-FIBER CABLE IN NEW 3" CONDUIT TO BE BORED WITH NEW TYPE 2-MODIFIED JUNCITION BOX AT STA 17+25 4 4 RECEIVING PIT IS IN FRONT OF EXISTING 25-TA ON SW CORNER OF SW 16TH ST & LIND AVE DEVELOPMENT ENGINEERING Michael Sippo 03/10/2023