Loading...
HomeMy WebLinkAboutP_RPES ADA Improvements_CCP Application_230306DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Project Name: Project Address/Location : Parcel f(s): Description of Project: Applicant lnformation Name: 'Alisha Smothers cio Renton School District Address: ,7812 South 124th Street City: Seattle State: WA ZiP:98'178 Phone: ,(425) 531-2577 Email: alisha.smothers@rentonschools.us Engineer lnformation Firm: Jacobson Consulting Engineers Address 255 S King Street, Suite 800 City: Seattle State: WA Zip: 98 Contact: Alan Jacobson Phone: (206) 426-2600 Email: alan@acobsonengineers.com CITY OFenton 1055 South Grady Way, 6th Floor I Renton, WA 98057 | 425-430-7200 Website: rentonwa.gov Renton Park Elementary School - ADA lmprovements 16828 128th Ave SE, Renton, WA 98058 282305-9084 Replacing and modifying the existing ADA parking stalls and portion of existing sidewalk from ADA parking stalls to the school entrance as required to meet accessibility code requirements. Related Permit(s): LUA#: B#: PRE#: Type of Construction: Istrort Plat (9 or fewer lots] !subaivision (10+ Lots) [ Commercial / Multi-Family lTenant lmprovement EAddition to Existing - Approximate Value of Addition: S IClear and Grade & TESC Only Property Owner I nformation Name: Alisha Smothers c/o Renton School District Address: 7812 South 124th Street City: Phone: Email: Seattle State: WA Zip: 98178 (425) 531-2577 alisha.smothers@rentonschools.us Earthwork and Clearing Earthwork Volumes (cubic yards) Cut: 65 Fill: 20 Total: Total Site Area (SF): 338,896 Area of Site Acres: 0.10 SF: Disturbance (lf more than 1 acre, NPDES Permit Required) Public lmprovements Utilities lmprovements (check alr that appty): rl water E wastewater n stormwater lf not a City of Renton Utility, list provider jurisdiction and service (i.e. Soos Creek Water & Sewer District): Streets lmprovements (check all thatapply): f] Curb/Gutter n sidewalk n Planter Strip n Street Lights n Street Trees E noadway lf any right-of-way is not owned by the City of Renton, list the jurisdiction (i.e. King County, WSDOT): 04 85 CIVIL CONSTRUCTION PERMIT APPLICATION 4,453 Page 2 of 5 I Published: UIO/2022 DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT entonCITY OF 1055 South Grady Way, 5th Floor I Renton, WA 98057 | 425-430-7200 Website: rentonwa.gov Published: 1/10/2022 t. Fill out Civil Construction Permit Application form and Project Cost Estimate. 2. Schedule an lntake Meeting with the assigned City Development Engineer. 3. The following items are all required at the First tntake meeting: A Electronic Copy of the Civil Construction permit Application A Electronic Copy of the lntake Checklist V Electronic Copy of All Plans, Complete TlR, and all supporting reports and studies A Electronic Copy of the Bond Quantity Worksheet (.xlsx format) n N/AOraft Electronic copy of easement and/or right-of-way dedication documents (note: not applicable to plats; documents will be recorded at project close-out) 4. Upon completion of a successful and complete intake, the City has accepted the submitted materials for review and the first review cycle has begun. The City reviewers will evaluate your plans for compliance with development standards, applicable codes and regulations, and satisfaction of Land Use Decision conditions as applicable to the civil construction permit. Note: The Applicant has the option to schedule an informal pre-screen meeting prior to preparing the required number of copies for the formal intake meeting. Applicants should coordinate with the assigned City Development Engineer to determine if a pre-screen meeting is appropriate for their project. One complete copy of the application package (including all items noted above) is required for informal review by the City Development Engineer. Please allow approximately 45 minutes for the application screening. Specific Code Section(s) related to this document RMC Ch 4-6 Street and Utility Standards RMC Ch 4-8 Permits - General and Appeals Additional Design Resources and City Standards Citv of Renton Surface Wa Desisn Manual {RSWDM) City of Renton Standard Details City of Renton Forms CIVIL CONSTRUCTION PERMIT APPLICATION Page 1 of 5 | Published: L/70/2022 CIVIL CONSTRUCTION PERMIT APPLICATION Co rur'o ) Project Costs for Permit Fee Calculation As outlined in City Ordinance No. 4345, 5O% of the plan review and inspection fees are to be paid at Permit Submittal. The balance is due at Permit lssuance. Significant changes or additional review cycles (beyond 3 cycles) during the review process may result in adjustments to the final review fees. It is required that you provide an itemized estimated cost of construction for proposed improvements to water (if the project has City of Renton water service), wastewater (if the project has City of Renton wastewater service), stormwater including erosion control, and transportation facilities, both on-site and off-site. Enter estimated costs in items (D): (A) (B) (c) Water Wastewater Stormwater s s 0.00 0.00 , $z,zaa9+ , $ rsz,roz.+a This application does not constitute a permit to work. Work shall not commence until a civil construction permit is issued and the ore-construction meeting has been held. I certify that the information on this application is accurate to the best of my knowledge and I will be responsible for any additional fees resulting from a different valuation. ,1/,iha "fl+s & /a/zsDate ':J Print Name Signature Accepted By:Civil Construction Permit #Date (E) Total of lmprovements 339,353.52thru Page 3 of 5 | Published: 7hO/2O22 CIVI L CONSTRUCTION P ERM IT APPLICATION (Coru i'l) lntake Checklist Use the following checklist as a guide to prepare the permit submittal package. The applicant should contact the assigned City Development Engineer if there are any questions regarding submittal requirements. Marking an item as "Not Applicable" or "N/A" , without acceptable justification, may result in the submittal being rejected at lntake. Miscellaneous Submittal ltems, as applicable Included N/A AllChec ports red Unless Waived Staff Bond Quantity Worksheet (.xlsx format) Draft Copy of Easements Draft Copy of Right-of-Way Dedication Street Lighting Calculations triln nm Plans Organize the plans such that they are separated into type of improvement and drawing order. Each improvement type should include all plans, profiles, notes, sections, details, schedules, diagrams, etc. for that facility. All plans shall be designed in accordance with the City of Renton "Construction Plan Drafting Standards" as required per RMC 4-8-LZO. The required order of drawings is as follows: lncluded N/A AllPlans red Unless Waived c Staff Cover Sheet Sheet lndex (lf not on the Cover Sheet) Existing Conditions/Topography Pla n Horizontal Control Plan Site Plan Temporary Erosion and Sediment Control Plan Grading Plan (may be combined with Temporary Erosion and Sediment Control Plan or Storm Drainage Plan) Conceptual Structural/Retaining Wall and/or Detention Vault Plans Associated with Civil lmprovements Composite Utility Plan Road/Paving/storm Drainage Plan and Profiles (Large projects May Require separate Street lmprovement and Storm Drainage Plans) wastewater and water utility Plan and Profiles{Large Projects May Require separate Wastewater and Water Plans) Plumbing Plan [Commercial/lndustrial] - For informational purposes only City Standard Details (Organized by Private vs. Public) Street Lighting Plan and Details Traffic Signals Plan and Details Signing and Channelization Plan and Details Landscaping Plan and Details Tree Retention/Land Clearing (Tree lnventory) Plan Wetland or Stream Mitigation Plan Miscellaneous Plans (Structural, Architectural, etc Technical lnformation Report The Technical lnformation Report (TlR) shall be a complete report in accordance with the current Surface Water Design Manual adopted by the City. Each section of the report shall be clearly identified and all supporting documents clearly indexed within the report. ftililnil n gn a EnE8UtraE trEraEtr n trnilililtr Page 4 of 5 Published: 7/tO/2022 CIVIL CONSfRUCTION PERMIT APPLICATION (Eiln oF Dcctrtr,lrrur) lncluded TIR shall lnclude the Fol Items as detailed in the Surface Water Manual Section 1: Project Overview . Figure 1- TIR Worksheet . Figure 2 - Site Location . Figure 3 - Drainage Basins, Sub-basins and Site Characteristics o Show acreage and boundaries of sub-basins o ldentify all site characteristics o Show existing discharge points to and from the site o Show routes of existing, construction, and future flows at all discharge points and downstream hydraulic structures o Topographic map as a base for the figure comparable to USGS or better. Show (and cite) the length of travel from the farthest upstream end of the proposed storm system in the development to any proposed flow control facility. r Figure 4 - Soils (Show the soils within the following areas): o The project site o The area draining to the site o The drainage system downstream ofthe site for the distance ofthe downstream analysis Section 2: Conditions and Requirements Summary Section 3: Off-Site Analysis o Task 1: Study Area Definition and Maps r Task 2: Resource Reviewo Task 3: Field lnspection r Task 4: Drainage System Description and Problem Descriptions o Task 5: Mitigation of Existing or Potential Problems Section 4: Flow Control, Low lmpact Development (LlD|, and Water Quality Facility Analysis and Design o Existing Site Hydrology (Part A) - Topographical map with listed site information o Developed Site Hydrology (Part B) - Data/narrative for developed site conditions r Performance Standards (Part C) - Summarize flow control and On-Site BMPs r Flow Control System (Part D) - lllustrative sketch and documentation r Water Quality System (Part E) - lllustrative sketch and documentation Section 5: Conveyance System Analysis and Design Section 6: Special Reports and Studies (Geotechnical Reports, Wetlands Reports, Floodplains Analysis, etc.) Section 7: Other Permits {special Use, WSDOT, DOE Permit with WAR fl, etc.) Section 8: CSWPPP Analysis and Design o ESC Plan Analysis and Design (Part A) o SWPPS Plan Design (Part B) a Section 9: Bond Quantities, Facility Summaries and Declaration of Covenant . City of Renton Bond Quantity Workheet r Flow Control and Water Quality Facility Summary Sheet and Sketch o Declaration of Covenant for Privately Maintained Flow Control and Water Quality Facilities r Declaration of Covenant for Privately Maintained Flow Control BMPs Section 10: Operations and Maintenance Manual Nlotc: This handout shall not be used as a substitutc for code s and rcgulations. Thc Applicant is rcsponsiblc for compliancc with all codcs ancl rcgulations. rvhcthcr or not dcscribcd in this documcnt. Community & Economic Development (425\ 430-1 200 | r,wr;w. rcniillt';a.i:rir naaVVn m a truunag ag aV mVnuVVaag @ga m VVnuun Page 5 of 5 ' Published 7/!o/2022