HomeMy WebLinkAboutM_Special_Inspection_Authorization_Form_190920_v11
H:\CED\Data\Forms-Templates\Self-Help Handouts\Building\Vault&WallReq_copy.doc Rev. 02/2017
THE APPLICANT SHALL SUBMIT AN ELECTRONIC COPY OF THE COMPLETE SET OF PLANS ON
A USB FLASHDRIVE ACCORDING TO RENTON FILE STANDARDS
1. A complete set of engineered plans, including site plans.
2. Where specifications supplement the construction drawings, include a separate files for
structural details, elevations and civil plans.
3. Stress/structural calculations, if applicable.
4. Geotechnical report, if applicable.
5. Special Inspection Authorization Form. (See attached.)
THE SITE PLAN SHALL CLEARLY SHOW THE FOLLOWING:
1. Scale (1β = 20βor 1β = 40β) and North Arrow.
2. Location, identification and dimensions of all buildings, property lines, streets, alleys and
easements. Indicate condition of all public right-of-ways and submit verification of right
to use easements.
3. Location of wall or vault and distance to all buildings, property lines, streets, alleys and
easements.
GENERAL NOTES MUST INCLUDE THE FOLLOWING: (PREFERABLY ON COVER SHEET)
1. The full name of the project.
2. The name, address and telephone number of owner and agent(s).
3. The area, in square feet or acres, of the project site.
4. The existing zoning of the project site.
5. The seismic design category of the project site (D).
6. Structural design criteria.
7. The IBC designation of occupancy group (U - 1).
CITY OF RENTON
DEVELOPMENT SERVICES
Building Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200 | Website: rentonwa.gov
SUBMITTAL REQUIREMENTS-VAULTS AND RETAINING WALLS
PR13007339
B19005144RECEIVED
09/24/2019 lwalker
BUILDING DIVISION
2
H:\CED\Data\Forms-Templates\Self-Help Handouts\Building\Vault&WallReq_copy.doc Rev. 02/2017
Project Name:
Address:
Responsibility under Section 109 of the International Building Code (IBC) for selection of a testing
laboratory lies with the owner or his agent (architect or structural engineer of record).
The following have been or will be contracted with to perform all SPECIAL INSPECTIONS required per
Chapter 17, IBC and the Renton Building Department.
o Structural Considerations
Testing Agency:
Telephone:
Address:City/State/Zip:
o Geotechnical Considerations Per Soils Report
Geotechnical Engineer of Record:
Testing Agency:
Telephone:
Address:City/State/Zip:
We understand that these assignments cannot be changed (transferred) once the building permit has
been issued without the approval of the Building Official.
The completed form must be returned to the City of Renton Plans Examiner prior to issuance of the
Building Permit.
Print Name
Signature of Owner/Authorized Agent Date
SPECIAL INSPECTION AUTHORIZATION FORM
CITY OF RENTON
DEVELOPMENT SERVICES
Building Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200 | Website: rentonwa.gov
Allura at Tiffany Park - Lot 87
1809 Olympia Ct. S.E.
Earth Solutions NW LLC
Earth Solutions NW LLC
1805 136th Pl NE #201
1805 136th Pl NE #201
Bellevue, WA 98005
Bellevue, WA 98005
Earth Solutions NW LLC
(425) 449-4704
(425) 449-4704
Barry Talkington, PE
09/20/19
PR13007339
B19005144RECEIVED
09/24/2019 lwalker
BUILDING DIVISION