Loading...
HomeMy WebLinkAboutC_Response_Letter_Barghausen_170426 April 26, 2017 ELECTRONIC DELIVERY VIA NEWFORMA Ann Fowler Development Engineering City of Renton Community and Economic Development 1055 South Grady Way Renton, WA 98057 RE: Revised Early Clear and Grade Plans Plat of Allura at Tiffany Park City of Renton File No. LUA13-001572 BCE Job No. 16055 Dear Ann: On behalf of MainVue WA LLC, we are resubmitting the Revised Early Clear and Grade Plans and SWPPP for the Plat of Allura at Tiffany Park. Enclosed are the following documents and drawings for your review: 1. One (1) electronic copy of the revised Early Clear and Grade drawings which include grading, TESC, tree retention, retaining wall, and wetland mitigation plans prepared by Barghausen Consulting Engineers, Inc. dated April 26, 2017 2. One (1) electronic copy of the final Construction SWPPP prepared by Barghausen Consulting Engineers, Inc. dated April 26, 2017 3. Original plan set redlined by the City of Renton, with comment responses for the Early Clear and Grade drawings dated April 14, 2017 Please review and contact me if you have any questions or need additional information. Thank you. Sincerely, Barry J. Talkington, P.E. Project Engineer BJT/ns/mf 16055c.019.doc enc: As Noted cc: Barbara Yarington, MainVue WA LLC Thomas A. Barghausen, Barghausen Consulting Engineers, Inc. Rob Gonia, Barghausen Consulting Engineers, Inc. CIVIL ENGINEERING, LAND PLANNING, SURVEYING 18215 72ND AVENUE SOUTH KENT, WA 98032 (425) 251-6222 (425) 251-8782 FAX BRANCH OFFICES  TUMWATER, WA  KLAMATH FALLS, OR  LONG BEACH, CA  ROSEVILLE, CA  SAN DIEGO, CA www.barghausen.com