HomeMy WebLinkAboutC_Response_Letter_Barghausen_170426
April 26, 2017
ELECTRONIC DELIVERY
VIA NEWFORMA
Ann Fowler
Development Engineering
City of Renton
Community and Economic Development
1055 South Grady Way
Renton, WA 98057
RE: Revised Early Clear and Grade Plans
Plat of Allura at Tiffany Park
City of Renton File No. LUA13-001572
BCE Job No. 16055
Dear Ann:
On behalf of MainVue WA LLC, we are resubmitting the Revised Early Clear and Grade Plans and
SWPPP for the Plat of Allura at Tiffany Park. Enclosed are the following documents and drawings for
your review:
1. One (1) electronic copy of the revised Early Clear and Grade drawings which include grading,
TESC, tree retention, retaining wall, and wetland mitigation plans prepared by Barghausen
Consulting Engineers, Inc. dated April 26, 2017
2. One (1) electronic copy of the final Construction SWPPP prepared by Barghausen Consulting
Engineers, Inc. dated April 26, 2017
3. Original plan set redlined by the City of Renton, with comment responses for the Early Clear
and Grade drawings dated April 14, 2017
Please review and contact me if you have any questions or need additional information. Thank you.
Sincerely,
Barry J. Talkington, P.E.
Project Engineer
BJT/ns/mf
16055c.019.doc
enc: As Noted
cc: Barbara Yarington, MainVue WA LLC
Thomas A. Barghausen, Barghausen Consulting Engineers, Inc.
Rob Gonia, Barghausen Consulting Engineers, Inc.
CIVIL ENGINEERING, LAND PLANNING, SURVEYING
18215 72ND AVENUE SOUTH KENT, WA 98032 (425) 251-6222 (425) 251-8782 FAX
BRANCH OFFICES TUMWATER, WA KLAMATH FALLS, OR LONG BEACH, CA ROSEVILLE, CA SAN DIEGO, CA
www.barghausen.com