Loading...
HomeMy WebLinkAboutF_ShopDrawings_CT Sales R3 Allura at Tiffany Park_180316VISSER ENGINEERING.This submittal has been reviewed for compliance with the concepts presented in the Visser Engineering design drawings. The contractor is responsible for all dimensions and for installing all materials in accordance with the requirements of the design drawings..This submittal is APPROVED.Mike VisserVisser Engineering2-12-2018VISSER ENGINEERING ADDEDNUM.There are no lap splice bars in the footing..This submittal is APPROVED.Mike VisserVisser Engineering2-28-2018