HomeMy WebLinkAboutFW Tiffany Park inspectionJoe/Matt – Please see the inspection notes below from yesterday’s site inspection for the CIP Retaining Wall. Prior to scheduling the next inspection, provide the 3rd Party inspection report of the footing forms and rebar, and address all items outlined below. As a reminder, if you plan to work on Saturday, please coordinate with Patrick DeCaro for OT Inspection. Additionally, all 3rd party inspection reports and test results should be forwarded to the City for the record. ~Thanks Ann Fowler Civil Engineer III | CED AFowler@Rentonwa.gov <mailto:AFowler@Rentonwa.gov> | Phone: (425) 430-7382 P Please consider the environment before printing this email EFFECTIVE JANUARY 1, 2018 THE COMMUNITY AND ECONOMIC DEVELOPMENT DEPARTMENT PERMIT COUNTER WILL CLOSE AT 4:00 P.M. DAILY Permit Counter 8:00 a.m. to 4:00 p.m. Financial Transactions 8:00 a.m. to 4:30 p.m. From: Justin T. Johnson Sent: Thursday, March 29, 2018 4:30 PM To: Ann Fowler <AFowler@Rentonwa.gov> Subject: Tiffany Park inspection Below is the Entry for the inspection yesterday. Tiffany Park Rebar and Form work Inspection. Contractor had not called in a subgrade inspection for footing of the wall. They did provide the compaction reports which can be found in the Project file. Contractor did not call for a formwork inspection prior to the installation of the reinforcing steel as previously discussed. (11:00 am) Arrived onsite with Partick DeCaro (City of Renton Inspector) performed a rebar inspection to confirm that the rebar installed was in accordance with the plans and specifications. There were multiple issues that were observed throughout the inspection. 1. The Horizontal reinforcing steel only has .5 inches of clearance along the west foundation face. 2. Wall is missing an number 5 rebar next to the hook bar throughout the entire wall. 3. There is too much clearance between the top rebar mat and to of foundation 4. Forms are not set to 15 feet 6 inches 5. At the south end of the foundation more reinforcing steel needs to be added. Justin Johnson Civil Engineer II | CED JTJohnson@Rentonwa.gov <mailto:JTJohnson@Rentonwa.gov> | Phone: (425) 430-7291 P Please consider the environment before printing this email EFFECTIVE JANUARY 1, 2018 THE COMMUNITY AND ECONOMIC DEVELOPMENT DEPARTMENT PERMIT COUNTER WILL CLOSE AT 4:00 P.M. DAILY Permit Counter 8:00 a.m. to 4:00 p.m. Financial Transactions 8:00 a.m. to 4:30 p.m.