Loading...
HomeMy WebLinkAboutAllura @ Tiffany Park - Erosion ControlThomas – The Construction Inspector has noted that the project is not currently meeting the minimum requirements outlined in the Surface Water Design Manual for erosion control during the Wet Season, which began October 1st. Please reference the attached Wet Season Letter sent out on 9/15/17 as well as Appendix D of the Surface Water Design Manual for additional Erosion and Sediment Control Measures to be implemented during the Wet Season. Take special note to page D-106 for Wet Season Special Provisions for any projects with exposed soils during the wet season (October 1 to April 30). You are required to ensure that the project site is meeting the minimum requirements of the Manual. Failure to meet the minimum erosion control requirements will result in a Stop Work Order being issued to the project site. Your urgent attention to this matter is appreciated. Appendix D <http://rentonwa.gov/uploadedFiles/Government/PW/UTILITIES/Surface_Water/CC_16-06243-000_2017RentonSWDM_ApxD_Clean_20161201.pdf> ~Thanks Ann Fowler Civil Engineer III Department of Community and Economic Development City of Renton | 1055 South Grady Way, 6th Floor | Renton, WA 98057 Phone: 425-430-7382 | Fax: 425-430-7300 E-Mail: afowler@rentonwa.gov <mailto:afowler@rentonwa.gov> Website: www.rentonwa.gov <http://www.rentonwa.gov/> P Please consider the environment before printing this email ELECTRONIC PLAN SUBMITTAL AND REVIEW HAS BEGUN! For more information on Electronic Plan Review, please click here <http://rentonwa.gov/paperless/>