Loading...
HomeMy WebLinkAboutRE Allura @ Tiffany Park - ReviewBarry – One additional comment – all the Manhole CB’s are called out as CB #.. Type 1 – Size. (ex CB #18, Type I – 48”). Could you somehow designate these as MHs so there’s no confusion? When I look at them I see a Type 1 CB where there should be a Type 2 and it got a bit confusing. Let me know if you have questions or thoughts on this. ~Thanks Ann Fowler Civil Engineer II | CED AFowler@Rentonwa.gov <mailto:AFowler@Rentonwa.gov> | Phone: (425) 430-7382 P Please consider the environment before printing this email ELECTRONIC PLAN SUBMITTAL AND REVIEW HAS BEGUN! For more information on Electronic Plan Review, please click here <http://rentonwa.gov/paperless/> From: Ann Fowler Sent: Friday, August 11, 2017 11:23 AM To: Barry Talkington <btalkington@barghausen.com> Cc: Mona Davis <MDavis@Rentonwa.gov>; 'Tom Barghausen' <tbarghausen@barghausen.com> Subject: Allura @ Tiffany Park - Review Barry - Below is a link to the 3rd set of comments for this project. I have some minor comments on the ADA ramps and Mona has some comments that she needs addressed prior to issuance of the Construction Permit. Please let me know if you have any questions regarding the comments. Please send me a PDF set of the updated plans once all revisions have been made. An intake meeting is not required for the next resubmittal. I’m working on the final fees and Bond amount now. Will be in touch with those shortly. Civil Plans - V3 <https://1drv.ms/f/s!AmrloKJLmzVvhhgKP5X7WGMZgkq7> ~Thanks Ann Fowler Civil Engineer II Department of Community and Economic Development City of Renton | 1055 South Grady Way, 6th Floor | Renton, WA 98057 Phone: 425-430-7382 | Fax: 425-430-7300 E-Mail: afowler@rentonwa.gov <mailto:afowler@rentonwa.gov> Website: www.rentonwa.gov <http://www.rentonwa.gov/> P Please consider the environment before printing this email ELECTRONIC PLAN SUBMITTAL AND REVIEW HAS BEGUN! For more information on Electronic Plan Review, please click here <http://rentonwa.gov/paperless/>