HomeMy WebLinkAboutC_Bond Quantity Amount_170815Planning Division |1055 South Grady Way – 6th Floor | Renton, WA 98057 (425) 430‐7200Date:Name:Project Name: PE Registration No:CED Plan # (LUA):Firm Name:CED Permit # (U):Firm Address:Site Address:Phone No.Parcel #(s):Email Address:Project Phase: Site Restoration/Erosion Sediment Control Subtotal (a)Existing Right‐of‐Way Improvements Subtotal (b) (b)115,883.90$ Future Public Improvements Subtotal(c)2,360,138.00$ Stormwater & Drainage Facilities (Public & Private) Subtotal(d) (d)3,032,664.80$ (e)(f)Site RestorationCivil Construction PermitMaintenance Bond1,101,737.34$ Bond Reduction2Construction Permit Bond Amount 3Minimum Bond Amount is $10,000.001 Estimate Only ‐ May involve multiple and variable components, which will be established on an individual basis by Development Engineering.2 The City of Renton allows one request only for bond reduction prior to the maintenance period. Reduction of not more than 70% of the original bond amount, provided that the remaining 30% willcover all remaining items to be constructed. 3 Required Bond Amounts are subject to review and modification by Development Engineering.* Note: The word BOND as used in this document means any financial guarantee acceptable to the City of Renton.** Note: All prices include labor, equipment, materials, overhead and profit. S(e) x 150% + (f) x 100%‐$ T(P +R ‐ S)4,946,445.90$ P (a) x 150%223,622.85$ R((b + d)x 150%)4,722,823.05$ EST1((b) + (c) + (d)) x 20%149,081.90$ 115,883.90$ 3,032,664.80$ Bond Reduction: Existing Right‐of‐Way Improvements (Quantity Remaining)2‐$ Bond Reduction: Stormwater & Drainage Facilities (Quantity Remaining)2‐$ (425) 251‐6222See Belowbtalkington@barghausen.com FOR APPROVALCONSTRUCTION BOND AMOUNT */**(prior to permit issuance)MAINTENANCE BOND */**(after final acceptance of construction)4142313‐001572Barghausen Consulting Engineers, Inc. U1600636818215 72nd Avenue South S.E. 18th Street and 124th Place S.E.SITE IMPROVEMENT BOND QUANTITY WORKSHEET BOND CALCULATIONS5/12/2017Prepared by:Project InformationBarry J TalkingtonAllura at Tiffany parkPage 1 of 1Ref 8‐H Bond Quantity WorksheetSECTION III. BOND WORKSHEET (2Unit Prices Updated: 06/14/2016Version: 04/26/2017Printed 8/15/2017