Loading...
HomeMy WebLinkAbout9_CM_BW_constr_mitigation_descrip_230316_v1Construction Mitigation Description Burnett Ave S and Williams Ave S Storm System Improvement Project A. Proposed Construction Dates: Construction is anticipated to take place between Summer and fall of 2023. B. Hours and Days of Operation: Typical Schedule will be a consecutive 8-hour period between 7:00 am to 6:00 pm, exclusive of lunch, Monday through Friday. Because of the type of work and locations, there may be times where work may be done at night or on weekends to minimize impacts. C. Proposed hauling/transportation routes: Any hauling and transportation routes required for this project will be provided by the construction company that is selected for the project. D. Measures to be implemented to minimize dust, traffic and transportation impacts, erosion, mud, noise, and other noxious characteristics: a. The contractor will be required to perform consistent street sweeping to minimize dust and mud. b. Trucks transporting excavated or fill material will be covered or have adequate freeboard to prevent dust and particulates from being blown out of the truck. c. Erosion Control measures could include use of silt fencing, catch basin inlet protection, stabilized construction entrance, and other measures as specified in the SWPP. E. Any special hours proposed for construction or hauling (i.e., weekends, late nights): At this time there are no special hours proposed for construction or hauling. F. Preliminary traffic control plan: The contractor will provide a Traffic Control Plan to by reviewed and approved by the City Transportation Department prior to the beginning of construction. The Traffic Control Plan will adhere to City standards and ensure that flaggers and appropriate signage is implemented. Access to residential properties will be maintained throughout the project. If access is not permitted due to construction activities property owners will be notified.