Loading...
HomeMy WebLinkAboutM_Water_Availability_Certificate_Sierra_Homes_SP_221205_v1.pdfOKing County DDES DEPARTMENT OF DEVELOPMENT AND ENVIRONMENTAL SERVICES 900 Oakesdale Avenue Southwest Renton, Wa 98055-1219 This certificate provides the Seattle King County Department of Public Health and the Department of Development and Environmental Services with information necessary to evaluate development proposals. King County Certificate of Water Availability Do not write in this box number name EEI Building Permit ❑ Preliminary Plat or PUD ❑ Short Subdivision ❑ Rezone or other Applicant's Name: Finkbeiner, Dan (Contact: Bonnie Babcock 425-961-2074 bbabcock@encompasses.net) Proposed use: 3 Lot Short Plat Location: 702 Nile Ave Ne, Renton WA, 98059 (1123059002) map and legal description if necessa 1. El a. Water will be provided by service connection only to an existing water main that is fronting the site. OR/AND ❑ b. Water service will require an improvement to the water system of: ❑ (1) feet of water main to reach the site; and/or ❑ (2) The construction of a distribution system on the site; and/or 0(3) Other (describe) 2. El a. The water system is in conformance with a County approved water comprehensive plan. OR ❑ b. The water system improvement is not in conformance with a County approved water comprehensive plan and will require a water comprehensive plan amendment. (This may cause a delay in issuance of a permit or approval). 3. ❑ a. The proposed project is within the corporate limits of the District or has been granted Boundary Review Board approval for extension of service outside the district or city or is within the County approved service area of a private water purveyor. OR ❑ b. Annexation or Boundary Review Board (BRB) approval will be necessary to provide service. 4. 0 a. Water will be available at the rate of flow and duration indicated below at no less than 30 psi measured at the nearest fire hydrants within 150 feet from all buildings/property (or as marked on the attached map): Rate of flow at Peak Demand Duration ❑ less than 500 gpm (approx. gpm) ❑ less than 1 hour ❑ 500 to 999 gpm ❑ 1 hour to 2 hours 01000 gpm or more 0 2 hours or more ❑ flow test of gpm ❑ other ❑ calculation of gpm (Note: Commercial building permits which includes multifamily structures require flow test or calculation.) OR ❑ b. Water system is not capable of providing fire flow. 5. 0 a. Water system has certificates of water right or water right claims sufficient to provide service. OR ❑ b. Water system does not currently have necessary water rights or water right claims. Comments/conditions: WAC fee $300, Fees per lot: WAC @ $150, GFC @$9000, SPU-FC $1081, 5/8" long side Service installation fee @ $5400 Total Fees Per lot= $14,631.00 FEES, one existing service to be used SUBJECT TO CHANGE WITHOUT PRIOR NOTICE. Paving plus 20% to be billed separately where applicable. I certify that the above water purveyor information is true. This certification shall be valid for 1 year from date of signature. KING COUNTY WATER DISTRICT #90 Joshua Drummond RENEWAL FEES: W/ IN 1 YEAR $50.00 Agency name Signatory name AFTER 1 YEAR $150.00 Operations Manager 11/10/2022 Title Signature Date