PROJECT SUMMARY
CALCULATION DETAILS
• LOADING = HS20 & HS25
• APPROX. LINEAR FOOTAGE = 696 If.
STORAGE SUMMARY
• STORAGE VOLUME REQUIRED = 19,663 cf.
• PIPE STORAGE VOLUME = 19,679 Cf.
• BACKFILL STORAGE VOLUME = 0 cf.
• TOTAL STORAGE PROVIDED = 19,679 cf.
PIPE DETAILS
• DIAMETER = 72 IN.
• CORRUGATION = 50
GAGE = 16
• COATING =ALT2
• WALL TYPE = Solid
• BARRELL SPACING = 36 IN.
BACKFILL DETAILS
• WIDTH AT ENDS = 12 IN.
• ABOVE PIPE = 0 IN.
• WIDTH AT SIDES = 12 IN.
• BELOW PIPE = 0 IN.
NOTES
• ALL RISER AND STUB DIMENSIONS ARE TO CENTERLINE. ALL
ELEVATIONS, DIMENSIONS, AND LOCATIONS OF RISERS AND
INLETS, SHALL BE VERIFIED BY THE ENGINEER OF RECORD
PRIOR TO RELEASING FOR FABRICATION.
• ALL FITTINGS AND REINFORCEMENT COMPLY WITH ASTM A998.
• ALL RISERS AND STUBS ARE 2%3" x Y" CORRUGATION AND 16
GAGE UNLESS OTHERWISE NOTED.
• RISERS TO BE FIELD TRIMMED TO GRADE.
• QUANTITY OF PIPE SHOWN DOES NOT PROVIDE EXTRA PIPE
FOR CONNECTING THE SYSTEM TO EXISTING PIPE OR
DRAINAGE STRUCTURES. OUR SYSTEM AS DETAILED PROVIDES
NOMINAL INLETAND/OR OUTLET PIPE STUB FOR CONNECTION
TO EXISTING DRAINAGE FACILITIES. IF ADDITIONAL PIPE IS
NEEDED IT IS THE RESPONSIBILITY OF THE CONTRACTOR.
• BAND TYPE TO BE DETERMINED UPON FINAL DESIGN.
• THE PROJECT SUMMARY IS REFLECTIVE OF THE DYODS DESIGN,
QUANTITIES ARE APPROX. AND SHOULD BE VERIFIED UPON
FINAL DESIGN AND APPROVAL. FOR EXAMPLE, TOTAL
EXCAVATION DOES NOT CONSIDER ALL VARIABLES SUCH AS
SHORING AND ONLY ACCOUNTS FOR MATERIAL WITHIN THE
ESTIMATED EXCAVATION FOOTPRINT.
• THESE DRAWINGS ARE FOR CONCEPTUAL PURPOSES AND DO
NOT REFLECT ANY LOCAL PREFERENCES OR REGULATIONS.
PLEASE CONTACT YOUR LOCAL CONTECH REP FOR
MODIFICATIONS.
TEMPORARY COVER FOR
CONSTRUCTION LOADS
HEIGHT
OF
COVER
0%, NTECH®
ENGINEERED SOLUTIONS LLC
www.ContechES.com
9025 Centre Pointe Dr., Suite 400, West Chester, OH 45069
800-338-1122 513-645-7000 513-645-7993 FAX
FINISHED
GRADE
CONSTRUCTION LOADS
FOR TEMPORARY CONSTRUCTION VEHICLE LOADS, AN EXTRAAMOUNT OF COMPACTED COVER MAY BE REQUIRED OVER
THE TOP OF THE PIPE. THE HEIGHT -OF -COVER SHALL MEET THE MINIMUM REQUIREMENTS SHOWN IN THE TABLE BELOW.
THE USE OF HEAVY CONSTRUCTION EQUIPMENT NECESSITATES GREATER PROTECTION FOR THE PIPE THAN FINISHED
GRADE COVER MINIMUMS FOR NORMAL HIGHWAY TRAFFIC.
PIPE SPAN,
AXLE LOADS (kips)
INCHES
18-50 50-75 75410 110-150
MINIMUM
COVER
(FT)
2.0
2.5
3.0
3.0
1242
48-72
3.0
3.0
3.5
4.0
78-120
3.0
3.5
4.0
4.0
126-144
3.5
4.0
4.5
4.5
"MINIMUM COVER MAY VARY, DEPENDING ON LOCAL CONDITIONS. THE CONTRACTOR MUST PROVIDE THE ADDITIONAL
COVER REQUIRED TO AVOID DAMAGE TO THE PIPE. MINIMUM COVER IS MEASURED FROM THE TOP OF THE PIPE TO
THE TOP OF THE MAINTAINED CONSTRUCTION ROADWAY SURFACE.
CONSTRUCTION LOADING DIAGRAM
SCALE: N.T.S.
ASSEMBLY
SCALE: 1" = 20'
DYO 14312 600 SW 10th
Detention for parking expansion
Renton, WA
DETENTION SYSTEM
A
ACCESS CASTING TO BE
PROVIDED AND INSTALLED
BY CONTRACTOR.
7� N
T a a
o
ao a
� O
d
GASKET MATERIAL EO MP RISER
SUFFICIENT TO PREVENT CL --
SLAB FROM BEARING ON LU
RISER TO BE PROVIDED BY a -
CONTRACTOR. OB 11" TYP. < rn
#4 DIAGONAL TRIM
BAR (TYR 4 PLACES),
SEE NOTE 7.
OPENING IN
PROTECTION _
SLAB FOR
CASTING
SCOPE
PIPE
THIS SPECIFICATION COVERS THE MANUFACTURE AND INSTALLATION OF
THE PIPE SHALL BE MANUFACTURED IN ACCORDANCE TO THE APPLICABLE
THE DESIGNED DETENTION SYSTEM DETAILED IN THE PROJECT PLANS.
REQUIREMENTS LISTED BELOW:
MATERIAL
ALUMINIZED TYPE 2: AASHTO M-36 0RASTM A-760
THE MATERIAL SHALL CONFORM TO THE APPLICABLE REQUIREMENTS
LISTED BELOW:
GALVANIZED: AASHTO M-36 OR ASTM A-760
ALUMINIZED TYPE 2 STEEL COILS SHALL CONFORM TO THE
POLYMER COATED: AASHTO M-245 OR ASTM A-762
APPLICABLE REQUIREMENTS OF AASHTO M-274 OR ASTM A-92.
ALUMINUM: AASHTO M-196 OR ASTM B-745
THE GALVANIZED STEEL COILS SHALL CONFORM TO THE APPLICABLE
REQUIREMENTS OF AASHTO M-218 OR ASTM A-929.
HANDLING AND ASSEMBLY
SHALL BE IN ACCORDANCE WITH NCSP'S (NATIONAL CORRUGATED STEEL
THE POLYMER COATED STEEL COILS SHALL CONFORM TO THE
PIPE ASSOCIATION) FORALUMINIZED TYPE 2, GALVANIZED OR POLYMER
APPLICABLE REQUIREMENTS OF AASHTO M-246 OR ASTM A-742.
COATED STEEL. SHALL BE IN ACCORDANCE WITH THE MANUFACTURER'S
RECOMMENDATIONS FOR ALUMINUM PIPE.
THE ALUMINUM COILS SHALL CONFORM TO THE APPLICABLE
REQUIREMENTS OF AASHTO M-197 OR ASTM B-744.
INSTALLATION
SHALL BE IN ACCORDANCE WITH AASHTO STANDARD SPECIFICATIONS FOR
CONSTRUCTION LOADS
HIGHWAY BRIDGES, SECTION 26, DIVISION II DIVISION II OR ASTM A-798 (FOR
CONSTRUCTION LOADS MAY BE HIGHER THAN FINAL LOADS. FOLLOW THE
ALUMINIZED TYPE 2, GALVANIZED OR POLYMER COATED STEEL) OR ASTM
MANUFACTURER'S OR NCSPA GUIDELINES.
B-788 (FOR ALUMINUM PIPE) AND IN CONFORMANCE WITH THE PROJECT
PLANS AND SPECIFICATIONS. IF THERE ARE ANY INCONSISTENCIES OR
CONFLICTS THE CONTRACTOR SHOULD DISCUSS AND RESOLVE WITH THE
SITE ENGINEER.
NOTE:
THESE DRAWINGS ARE FOR CONCEPTUAL
IT IS ALWAYS THE RESPONSIBILITY OF THE CONTRACTOR TO FOLLOW OSHA
PURPOSES AND DO NOT REFLECTANY LOCAL
GUIDELINES FOR SAFE PRACTICES.
PREFERENCES OR REGULATIONS. PLEASE
CONTACT YOUR LOCAL CONTECH REP FOR
MODIFICATIONS.
SECTION VIEW
REINFORCING TABLE
CMP
"BEARING
A
m B
REINFORCING
PRESSURE
RISER
(PSF)
24"
a 4'
26"
#5 @ 12" OCEW
2,410
4,X4,
#5 @ 12" OCEW
1,780
30"
0 4'-6"
32
#5 @ 12" OCEW
2,120
4'-6" X 4'-6"
#5 @ 12" OCEW
1,530
36"
0 5' 5'
38
#5 @ 10" OCEW
1,890
X 5'
#5 @ 10- OCEW
1,350
42
0 V-6" 5'-6"
44"
#5 @ 10" OCEW
1,720
X 6-6"
#5 @ 9" OCEW
1,210
48"
06. 6'
50"
#5 9 OCEW
1 600
X 6'
#5 @ 8" OCEW
1,100
"ASSUMED SOIL BEARING CAPACITY
OA A
/�OOL aB
A F�
#4 DIAGONAL TRIM
BAR (TYR 4 PLACES),
SEE NOTE 7.
2"COVER
(TYR)
tiGo'e
Q
INTERRUPTED BAR
REPLACEMENT, SEE
NOTE 6.
OPENING I
PROTECTIO
SLAB FOI
CASTINI
STANDARD STANDARD
REINFORCING, REINFORCING,
y mB INTERRUPTED BAR
SEE TABLE SEE TABLE
REPLACEMENT,
SEE NOTE 6.
ROUND OPTION PLAN VIEW
SQUARE OPTION PLAN VIEW
NOTES:
1. DESIGN IN ACCORDANCE WITH AASHTO, 17th EDITION.
7. TRIM OPENING WITH DIAGONAL #4 BARS, EXTEND
BARS A MINIMUM OF 12" BEYOND OPENING, BEND
2. DESIGN LOAD HS25.
BARS AS REQUIRED TO MAINTAIN BAR COVER.
3. EARTH COVER = V MAX.
8. PROTECTION SLAB AND ALL MATERIALS TO BE
PROVIDED AND INSTALLED BY CONTRACTOR.
4. CONCRETE STRENGTH = 3,500 psi
9. DETAIL DESIGN BY DELTA ENGINEERING, BINGHAMTON, NY.
5. REINFORCING STEEL =ASTM A615, GRADE 60.
6. PROVIDE ADDITIONAL REINFORCING AROUND
MANHOLE CAP DETAIL
OPENINGS EQUAL TO THE BARS INTERRUPTED,
HALF EACH SIDE. ADDITIONAL BARS TO BE IN
SCALE: N.T"S.
THE SAME PLANE.
erpinearana cony n«� ® n PROJECT No.: BED. No.: DATE:
E9 a S.Mi�;LLC(� t.°) Na•,arl .vi/ w�l%uT_ CwIJ DY014312 600 SW 10th 9015 14312 3/a/2022
i ���bap reo�°c C RI NTECH
aw h Fa.I «.Ira mpnorwnnen raaasald �► �` r� DESIGNED: DRAWN:
�`°'I"m"�m"'r"°°"`°` ENGINEERED SOLUTIONS LLC CMP DETENTION SYSTEMS Detention for parking expansion DYO DYO
e+«eawy alecreime any )repo
www.ContechES.com Renton, WA CHECKED: APPROVED:
waepmvias between he wpDlied im°rmallo"pp«, wnid, CONTECH DYO DYO
9025 Centre Pointe Dr. Suite 400 West Chester OH 45069
��kmyn�e1w"Neagd DYODS DETENTION SYSTEM
.c�pre q°ilaNliyr°r aaaieaa«�mia.mq.mmmware« 800-338-1122 513-645-7000 513-645-7993 FAX DRAWING SHEET NO.: D3
I... mm,mall°°aped"awdrem. DATE REVISION DESCRIPTION BY
1 CCP SUBMITTAL #1
lal
NO. REVISION
J
U_
W 0
Q
10 INITIAL FILL ENVELOPE - -
MINIMUM WIDTH DEPENDS ON SITE CONDITIONS AND ENGINEERING JUDGEMENT
DETENTION SYSTEMS - CMP DETENTION I CMP DRAINAGE
Material Location Description
Material Designation
Designation
Rigid or Flexible Pavement
(if applicable)
Road Base (if applicable)
Geotextile Layer
Non -Woven Geotextile
CONTECH C-40 or
Engineer Decision for consideration to prevent soil
C-45
migration into varying soil types
Backfll
Well graded granular material
AASHTO M 145-A-1,
Placed in 8" +/- loose lifts and compacted to 90%
which may contain small
A-2, A-3
Standard Proctor Per AASHTO T 99
amounts of silt or clay.
Bedding Stone
Well graded granular bedding
AASHTO M43 -
Engineer to determine if bedding is required. Pipe
material w/maximum particle
3,357,4,467, 5, 56, 57
may be placed on the trench bottom of a relatively
size of 3"
loose, native suitable well graded & granular
material. For Arch pipes it is recommended to be
shaped to a relatively flat bottom or fine -grade the
foundation to a slight v-shape. Unsuitable
material should be over -excavated and re -placed
with a 4%6" layer of well graded & granular stone
per the material designation. See AASHTO
26.3.8.1126.5.3 Bedding info.
Geotextile Layer
Non -Woven Geotextile
CONTECH C-40 or
Engineer Decision for consideration to prevent soil
C-45
migration into varying soil types
Note: Backfill using controlled low -strength material (CLSM, "flash fill" or Towable fi/17 when the spacing between the pipes will
not allow for placement and adequate compaction of the backfill.
PRIOR TO PLACING THE BEDDING, THE FOUNDATION MUST BE CONSTRUCTED TO A UNIFORM AND STABLE
GRADE. IN THE EVENT THAT UNSUITABLE FOUNDATION MATERIALS ARE ENCOUNTERED DURING
EXCAVATION, THEY SHALL BE REMOVED AND BROUGHT BACK TO THE GRADE WITH A FILL MATERIALAS
APPROVED BY THE ENGINEER.
HAUNCH ZONE MATERIAL SHALL BE PLACED AND UNIFORMALLY COMPACTED WITHOUT
SOFT SPOTS.
BACKFILL
WHEN PLACING THE FIRST LIFTS OF BACKFILL IT IS IMPORTANT TO
MAKE SURE THAT THE BACKFILL IS PROPERLY COMPACTED UNDER AND
AROUND THE PIPE HAUNCHES. BACKFILL SHALL BE PLACED SUCH THAT THERE IS NO MORE THAN ATWO
LIFT (16") DIFFERENTIAL BETWEEN ANY OF THE PIPES AT ANYTIME DURING THE BACKFILL PROCESS. THE
BACKFILL SHALL BE ADVANCED ALONG THE LENGTH OF THE DETENTION SYSTEM AT THE SAME RATE TO
AVOID DIFFERENTIAL LOADING ON THE PIPE.
OTHER ALTERNATE BACKFILL MATERIAL MAY BE ALLOWED DEPENDING ON SITE SPECIFIC CONDITIONS, AS
APPROVED BY SITE ENGINEER.
0% NTECH"
ENGINEERED SOLUTIONS LLC
www'ContechES.com
9025 Centre Pointe Dr., Suite 400, West Chester, OH 45069
800-338-1122 513-645-7000 513-645-7993 FAX
2'-6"
IL
IL
m1
L
FRONT
NOTE:
MANWAY DETAIL APPLICABLE FOR CMP
SYSTEMS WITH DIAMETERS 48"AND
PLAN LARGER. MANWAYS MAYBE REQUIRED
ON SMALLER SYSTEMS DEPENDING ON
TYPICAL MANWAY DETAIL ACTUAL SITE SPECIFIC CONDITIONS.
SCALE: N.T S.
RISER (TYR)
SEE DETAIL
ELEVATION END
NOTE:
TYPICAL RISER DETAIL LADDERS ARE OPTIONAL AND ARE NOT
REQUIRED FOR ALL SYSTEMS.
SCALE: N.T.S.
20 MIL HOPE MEMBRANE
LINER OVER TOP OF PIPE
(IF REQUIRED)
TYPICAL SECTION VIEW
LINER OVER ROWS
SCALE: N.T.S.
NOTE: IF SALTING AGENTS FOR SNOW AND ICE REMOVAL ARE USED ON OR NEAR
THE PROJECT, AN HDPE MEMBRANE LINER IS RECOMMENDED WITH THE SYSTEM.
THE IMPERMEABLE LINER IS INTENDED TO HELP PROTECT THE SYSTEM FROM THE
POTENTIAL ADVERSE EFFECTS THAT MAY RESULT FROM A CHANGE IN THE
SURROUNDING ENVIRONMENT OVER A PERIOD OF TIME. PLEASE REFER TO THE
CORRUGATED METAL PIPE DETENTION DESIGN GUIDE FOR ADDITIONAL
INFORMATION.
DY014312 600 SW 10th
Detention for parking expansion
Renton, WA
DETENTION SYSTEM
TS OF
UIRED
KFILL
CMP DETENTION SYSTEM INSPECTION AND
CMP DETENTION INSTALLATION GUIDE IN -SITU TRENCH WALL MAINTENANCE
WHEN PLOWABLE FILL IS USED, YOU MUST PREVENT PIPE FLOATATION.
PROPER INSTALLATION OF A FLEXIBLE UNDERGROUND DETENTION SYSTEM IF EXCAVATION IS REQUIRED, THE TRENCH WALL NEEDS TO BE CAPABLE OF TYPICALLY, SMALL LIFTS ARE PLACED BETWEEN THE PIPES AND THEN UNDERGROUND STORMWATER DETENTION AND INFILTRATION SYSTEMS MUST
WILL ENSURE LONG-TERM PERFORMANCE. THE CONFIGURATION OF THESE SUPPORTING THE LOAD THAT THE PIPE SHEDS AS THE SYSTEM IS LOADED. IF ALLOWED TO SET-UP PRIOR TO THE PLACEMENT OF THE NEXT LIFT. THE BE INSPECTED AND MAINTAINED AT REGULAR INTERVALS FOR PURPOSES OF
SYSTEMS OFTEN REQUIRES SPECIAL CONSTRUCTION PRACTICES THAT SOILS ARE NOT CAPABLE OF SUPPORTING THESE LOADS, THE PIPE CAN DEFLECT. ALLOWABLE THICKNESS OF THE CLSM LIFT IS A FUNCTION OF A PROPER PERFORMANCE AND LONGEVITY.
PERFORM A SIMPLE SOIL PRESSURE CHECK USING THE APPLIED LOADS TO BALANCE BETWEEN THE UPLIFT FORCE OF THE CLSM, THE OPPOSING
DIFFER FROM CONVENTIONAL FLEXIBLE PIPE CONSTRUCTION. CONTECH WEIGHT OF THE PIPE, AND THE EFFECT OF OTHER RESTRAINING INSPECTION
ENGINEERED SOLUTIONS STRONGLY SUGGESTS SCHEDULING A DETERMINE THE LIMITS OF EXCAVATION BEYOND THE SPRING LINE OF THE MEASURES. THE PIPE CAN CARRY LIMITED FLUID PRESSURE WITHOUT
PRE -CONSTRUCTION MEETING WITH YOUR LOCAL SALES ENGINEER TO OUTER MOST PIPES. PIPE DISTORTION OR DISPLACEMENT, WHICH ALSO AFFECTS THE CLSM INSPECTION IS THE KEY TO EFFECTIVE MAINTENANCE OF CMP DETENTION
LIFT THICKNESS. YOUR LOCAL CONTECH SALES ENGINEER CAN HELP SYSTEMS AND IS EASILY PERFORMED. CONTECH RECOMMENDS ONGOING,
DETERMINE IF ADDITIONAL MEASURES, NOT COVERED IN THIS GUIDE, ARE IN MOST CASES THE REQUIREMENTS FOR A SAFE WORK ENVIRONMENT AND APPROPRIATE FOR YOUR SITE. PROPER BACKFILL PLACEMENTAND COMPACTION TAKE CARE OF THIS CONCERN. DETERMINE THE PROPER LIFT THICKNESS. ANNUAL INSPECTIONS. SITES WITH HIGH TRASH LOAD OR SMALL OUTLET
CONTROL ORIFICES MAY NEED MORE FREQUENT INSPECTIONS. THE RATE AT
BACKFILL-WELL GRADED WHICH THE SYSTEM COLLECTS POLLUTANTS WILL DEPEND MORE ON SITE
FOUNDATION VELOAp 4"GRANULAR AND SMALLER SPECIFIC ACTIVITIES RATHER THAN THE SIZE OR CONFIGURATION OF THE
STAGE POURSAS REQUIREDTO
CONTROL FLOATATION AND PIPE SYSTEM.
CONSTRUCTA FOUNDATION THAT CAN SUPPORT THE DESIGN LOADING EMBANKMENT DISTORTION/DISPLACEMENT
APPLIED BY THE PIPE AND ADJACENT BACKFILL WEIGHT AS WELLAS MAINTAIN \ CLSM
F/I/ INSPECTIONS SHOULD BE PERFORMED MORE OFTEN IN EQUIPMENT
ITS INTEGRITY DURING CONSTRUCTION. \ / - \v EMBANKMENT WASHDOWN AREAS, IN CLIMATES WHERE SANDING AND/OR SALTING
GEOTEXTILE SEPARATION
�' (ABOVE AND BELOW / e •om
` j/� OPERATIONS TAKE PLACE, AND IN OTHER VARIOUS INSTANCES IN WHICH ONE
IF SOFT OR UNSUITABLE SOILSARE ENCOUNTERED, REMOVETHEPOOR �\//j//\\//j / / // BEDDING) WITH UNLAYER. V \ \\/\SOILS DOWN TO A SUITABLE DEPTH AND THEN BUILD UP TO THE GRADED BEDDING LAYER. �/ "'•` /j\/j�, WOULD EXPECT HIGHER ACCUMULATIONS OF SEDIMENT OR ABRASIVE/
APPROPRIATE ELEVATION WITH A COMPETENT BACKFILL MATERIAL. THE BEIANINLARAND cruoeD �i CORROSIVE CONDITIONS. A RECORD OF EACH INSPECTION IS TO BE
STRUCTURAL FILL MATERIAL GRADATION SHOULD NOTALLOW THE GRANULARAND SMALLER `//\/ // �i, /\/���\�//j\i�i\/�//\/\\\��/j; MAINTAINED FOR THE LIFE OF THE SYSTEM
MIGRATION OF FINES, WHICH CAN CAUSE SETTLEMENT OF THE DETENTION \��/ WEIGHTED PIPE WITH MOBILE
SYSTEM OR PAVEMENT ABOVE. IF THE STRUCTURAL FILL MATERIAL IS NOT CONCRETE BARRIERS
COMPATIBLE WITH THE UNDERLYING SOILS AN ENGINEERING FABRIC SHOULD BACKFILL PLACEMENT (OR OTHER REMOVABLE WEIGHTS) MAINTENANCE
BE USED AS A SEPARATOR. IN SOME CASES, USING A STIFF REINFORCING
GEOGRID REDUCES OVER EXCAVATION AND REPLACEMENT FILL QUANTITIES. CMP DETENTION SYSTEMS SHOULD BE CLEANED WHEN AN INSPECTION
BACKFILL MATERIAL SHALL BE WORKED INTO THE PIPE HAUNCHES BY MEANS OF REVEALS ACCUMULATED SEDIMENT OR TRASH IS CLOGGING THE DISCHARGE
GEOGRID USED TO REDUCE COVER SHOVEL -SLICING, RODDING, AIR TAMPER, VIBRATORY ROD, OR OTHER EFFECTIVE
THE AMOUNT OF UNDERCUT GEOGRID WASNT USED METHoos. CONSTRUCTION LOADING ORIFICE.
MAXIMUM UNBALANCE LIMITED ACCUMULATED SEDI MENT AND TRASH CAN TYPICALLY BE EVACUATED
�j\\ \j \ `EMBANKMENT T02LIFTS (APPROx. 16") TYPICALLY, THE MINIMUM COVER SPECIFIED FORAPROJECT ASSUMES H-20
/i\�/ THROUGH THE MANHOLE OVER THE OUTLET ORIFICE. IF MAINTENANCE IS NOT
LIVE LOAD. BECAUSE CONSTRUCTION LOADS OFTEN EXCEED DESIGN LIVE PERFORMED, S RECOMMENDED, SEDIMENTAND TRASH MAYACCUMULATE IN
\EMBANKMENT
PIPE L PIPED \ \j\� LOADS, INCREASED TEMPORARY MINIMUM COVER REQUIREMENTS ARE FRONT OF THE OUTLET ORIFICE. MANHOLE COVERS SHOULD BE SECURELY
NECESSARY. SINCE CONSTRUCTION EQUIPMENT VARIES FROM JOB TO JOB, SEATED FOLLOWING CLEANING ACTIVITIES. CONTECH SUGGESTS THATALL
SYSTEMS BE DESIGNED WITH AN ACCESS/INSPECTION MANHOLE SITUATED AT
IT IS BEST TO ADDRESS EQUIPMENT SPECIFIC MINIMUM COVER
\ \ /\ OR NEAR THE INLET AND THE OUTLET ORIFICE. SHOULD IT BE NECESSARY TO
GEOGRID UNDERCUT AND REPLACE y\ \ \/\\ \ \\ \\ \ \\ \/\ REQUIREMENTS WITH YOUR LOCAL CONTECH SALES ENGINEER DURING GET INSIDE THE SYSTEM TO PERFORM MAINTENANCE ACTIVITIES, ALL
BEDDING UNSUITABLE SOILS 8- LOOSE LIFTS BEDDING YOUR PRE -CONSTRUCTION MEETING. APPROPRIATE PRECAUTIONS REGARDING CONFINED SPACE ENTRYAND OSHA
GRADE THE FOUNDATION SUBGRADE TOA UNIFORM OR SLIGHTLY SLOPING
GRADE. IF THE SUBGRADE IS CLAY OR RELATIVELY NON-POROUSAND THE
CONSTRUCTION SEQUENCE WILL LAST FORAN EXTENDED PERIOD OF TIME,
IT IS BEST TO SLOPE THE GRADE TO ONE END OF THE SYSTEM. THIS WILL
IF AASHTO T99 PROCEDURES ARE DETERMINED INFEASIBLE BY THE
ALLOW EXCESS WATER TO DRAIN QUICKLY, PREVENTING SATURATION OF THE
GEOTECHNICAL ENGINEER OF RECORD, COMPACTION IS CONSIDERED
SUBGRADE.
ADEQUATE WHEN NO FURTHER YIELDING OF THE MATERIAL IS OBSERVED
UNDER THE COMPACTOR, OR UNDER FOOT, AND THE GEOTECHNICAL
ENGINEER OF RECORD (OR REPRESENTATIVE THEREOF) IS SATISFIED WITH
THE LEVEL OF COMPACTION.
GEOMEMBRANE BARRIER
A SITE'S RESISTIVITY MAY CHANGE OVER TIME WHEN VARIOUS TYPES OF
FOR LARGE SYSTEMS, CONVEYOR SYSTEMS, BACKHOES WITH LONG
SALTING AGENTS ARE USED, SUCH AS ROAD SALTS FOR DEICING AGENTS. IF
REACHES OR DRAGLINES WITH STONE BUCKETS MAY BE USED TO PLACE
BACKFILL. ONCE MINIMUM COVER FOR CONSTRUCTION LOADING ACROSS
SALTING AGENTS ARE USED ON OR NEAR THE PROJECT SITE, A
THE ENTIRE WIDTH OF THE SYSTEM IS REACHED, ADVANCE THE EQUIPMENT
GEOMEMBRANE BARRIER IS RECOMMENDED WITH THE SYSTEM. THE
TO THE END OF THE RECENTLY PLACED FILL, AND BEGIN THE SEQUENCE
GEOMEMBRANE LINER IS INTENDED TO HELP PROTECT THE SYSTEM FROM
AGAIN UNTIL THE SYSTEM IS COMPLETELY BACKFILLED. THIS TYPE OF
THE POTENTIAL ADVERSE EFFECTS THAT MAY RESULT FROM THE USE OF
CONSTRUCTION SEQUENCE PROVIDES ROOM FOR STOCKPILED BACKFILL
DIRECTLY BEHIND THE BACKHOE, AS WELLAS THE MOVEMENT OF
SUCH AGENTS INCLUDING PREMATURE CORROSION AND REDUCED ACTUAL
CONSTRUCTION TRAFFIC. MATERIAL STOCKPILES ON TOP OF THE
SERVICE LIFE.
BACKFILLED DETENTION SYSTEM SHOULD BE LIMITED TO 8- TO 10-FEET HIGH
AND MUST PROVIDE BALANCED LOADING ACROSS ALL BARRELS. TO
THE PROJECTS ENGINEER OF RECORD IS TO EVALUATE WHETHER SALTING
DETERMINE THE PROPER COVER OVER THE PIPES TO ALLOW THE
AGENTS WILL BE USED ON OR NEAR THE PROJECT SITE, AND USE HIS/HER
MOVEMENT OF CONSTRUCTION EQUIPMENT SEE TABLE 1, OR CONTACT YOUR
BEST JUDGEMENT TO DETERMINE IFANYADDITIONAL PROTECTIVE
LOCAL CONTECH SALES ENGINEER.
MEASURES ARE REQUIRED. BELOW IS ATYPICAL DETAIL SHOWING THE
PLACEMENT OF A GEOMEMBRANE BARRIER FOR PROJECTS WHERE SALTING
AGENTS ARE USED ON OR NEAR THE PROJECT SITE.
TYPICAL BACKFILL SEQUENCE
/ - - - -
uNv[ Eq oa•w or mEE ,e roa,oanNo
EMBANKMENT
/ M � � / /\
°kFRL
- - - -
/
a
Q
/
3
grn° a �s° •atl ld«memo anoa", «� mi, arawn«, a pro�ea
cJ q.roma pm M«Yq.r, ar•maaram c°mrea«by
Con„ En9lneuea Sdullon LLC (•Canrecq'). N"nMrt e
ra"i,g, noranypadhareo(, may be used repmtluced a
a Wh,a,gisa°v maa°ar»;modlm «lo,.,dga"waaamd
coare°b. raiwmmwmpiv is aoaa alma poor, o+m regain
wco repo a+«aawr areglalm.aar llaglllyor mapogwbnnr mr
aIhp�tlmw�p boa°ea°daavalneawmm°n..... m°rep
Irma rl..:e�w_, Naa>I9 a
U ^coapb qo, aAwliylor eaip,v beaea«miasin9. inmmwere«
C NTECH®
ENGINEERED SOLUTIONS LLC
www.ContechES.com
9025 Centre Pointe Dr., Suite 400, West Chester, OH 45069
REVISION DESCRIPTION BY 800-338-1122 513-645-7000 513-645-7993 FAX
/10/2 SURVEYED:
04/01 /21
DESIGNED:
AD/CH/NW
DRAWN: AD/CH/NW
CHECKED: CM
BY I DATE I APPR I APPROVED:
SCALE:
AS SHOWN
ONE INCH
AT FULL SCALE
IF NOT ONE INCH
SCALE ACCORDINGLY
ADDITIONAL CONSIDERATIONS
BECAUSE MOST SYSTEMS ARE CONSTRUCTED BELOW -GRADE, RAINFALL
CAN RAPIDLY FILL THE EXCAVATION; POTENTIALLY CAUSING FLOATATION
AND MOVEMENT OF THE PREVIOUSLY PLACED PIPES. TO HELP MITIGATE
POTENTIAL PROBLEMS, IT IS BEST TO START THE INSTALLATION AT THE
DOWNSTREAM END WITH THE OUTLETALREADY CONSTRUCTED TO ALLOW
A ROUTE FOR THE WATER TO ESCAPE. TEMPORARY DIVERSION MEASURES
MAY BE REQUIRED FOR HIGH FLOWS DUE TO THE RESTRICTED NATURE OF
THE OUTLET PIPE.
CATCH BASIN
INLET
WATER �� _WATER PAVED PARKING LOT
WATER ELEVATION IN
DETENTION SYSTEM
FINISHED FUNCTIONING SYSTEM
OUTLET CONTROL
CMP DETENTION SYSTEMS
CONTECH
DYODS
DRAWING
VERTICAL: NAVD 1988
HORIZONTAL: NAD 1983/1991
DATU M
REGULATIONS SHOULD BE FOLLOWED.
ANNUAL INSPECTIONS ARE BEST PRACTICE FORALL UNDERGROUND SYSTEMS
DURING THIS INSPECTION, IF EVIDENCE OF SALTING/DE-ICING AGENTS IS
OBSERVED WITHIN THE SYSTEM, IT IS BEST PRACTICE FOR THE SYSTEM TO BE
RINSED, INCLUDING ABOVE THE SPRING LINE SOON AFTER THE SPRING THAW
AS PART OF THE MAINTENANCE PROGRAM FOR THE SYSTEM.
MAINTAINING AN UNDERGROUND DETENTION OR INFILTRATION SYSTEM IS
EASIEST WHEN THERE IS NO FLOW ENTERING THE SYSTEM. FOR THIS
REASON, IT IS A GOOD IDEA TO SCHEDULE THE CLEANOUT DURING DRY
WEATHER.
THE FOREGOING INSPECTION AND MAINTENANCE EFFORTS HELP ENSURE
UNDERGROUND PIPE SYSTEMS USED FOR STORMWATER STORAGE CONTINUE
TO FUNCTION AS INTENDED BY IDENTIFYING RECOMMENDED REGULAR
INSPECTION AND MAINTENANCE PRACTICES. INSPECTION AND MAINTENANCE
RELATED TO THE STRUCTURAL INTEGRITY OF THE PIPE OR THE SOUNDNESS
OF PIPE JOINT CONNECTIONS IS BEYOND THE SCOPE OF THIS GUIDE.
DY014312 600 SW 10th
Detention for parking expansion
Renton, WA
DETENTION SYSTEM
CITY OF
RENTON
Planning/Building/Public Works Dept.
PROJECT No.:
SEQ. No.:
DATE:
.5
14312
3/8/2022
DESIGNED:
DRAWN:
DYO
DYO
CHECKED:
APPROVED:
DYO
DVO
SHEET NO.:
D4
01 /04/2023
IN COMPLIANCEWITH CITY OF RENTON STANDARDS
DEVELOPMENT ENGINEERING 0
JChavez 01 /31 /2023
600 SW 10TH PARKING LOT
STORM DRAIN & STORMWATER
MANAGEMENT DETAILS
DATE:
08/30/2022
FIELDBOOK:
PAGE:
C-507
SHEET: ---- OF: 22