PREAPPLICATION MEETING FOR
Dan Le Short Plat
16937 - 125th Pl SE
PRE 23-000050
March 23, 2023
Contact Information:
Planner: Andrew Van Gordon, 425.430.7286, avangordon@rentonwa.gov
Public Works Plan Reviewer: Scott Warlick, 425.430.7216, swarlick@rentonwa.gov
Fire Prevention Reviewer: Corey Thomas, 425.276.9582, cthomas@RentonRFA.org
Building Department Reviewer: Rob Shuey, 206.550.8523, rshuey@rentonwa.gov
Please retain this packet throughout the course of your project as a reference. Consider
giving copies of it to any engineers, architects, and contractors who work on the
project. You will need to submit a copy of this packet when you apply for land use
and/or environmental permits.
Pre-screening: When you have the project application ready for submittal, call and
schedule an appointment with the project manager to have it pre-screened before
making all of the required copies.
The pre-application meeting is informal and non-binding. The comments provided on
the proposal are based on the codes and policies in effect at the time of review. The
applicant is cautioned that the development regulations are regularly amended and the
proposal will be formally reviewed under the regulations in effect at the time of project
submittal. The information contained in this summary is subject to modification and/or
concurrence by official decision-makers (e.g., Hearing Examiner, Planning Director,
Development Services Director, Development Engineering Director, Department of
Community & Economic Development Administrator, Public Works Administrator and
City Council).
M E M O R A N D U M
DATE: February 28, 2023
TO: Andrew Van Gordon, Senior Planner
FROM: Corey Thomas, Lead Plans Review Inspector
SUBJECT: Yang Short Plat
1. The fire flow requirement for a single-family home is 1,000 gpm minimum for dwellings
up to 3,600 square feet (including garage and basements). If the dwelling exceeds 3,600 square
feet, a minimum of 1,500 gpm fire flow would be required. A minimum of on e fire hydrant is
required within 300-feet of the proposed buildings and two hydrants if the fire flow goes up to
1,500 gpm. There is one existing fire hydrant appear to be adequate in this area for this
proposal. Water is provided by Soos Creek Water District. A water availability certificate is
required from the water district.
2. The fire impact fees are currently applicable at the rate of $829.77 per single family unit.
This fee is paid at building permit issuance. Credit will be given for the removal/retention of
any of the existing single-family homes.
3. Fire department apparatus access roadways are adequate as they exist.
DEPARTMENT OF COMMUNITY
& ECONOMIC DEVELOPMENT
M E M O R A N D U M
DATE: March 20, 2023
TO: Andrew Van Gordon, Associate Planner
FROM: Scott Warlick, Engineering Specialist III
SUBJECT: Utility and Transportation Comments for Dan Le Short Plat
PRE23-000050
16937 125th Ave SE
NOTE: The applicant is cautioned that information contained in this summary is preliminary and
non-binding and may be subject to modification and/or concurrence by official City decision-
makers. Review comments may also need to be revised based on site planning and other design
changes required by City staff or made by the applicant.
I have completed a preliminary review for the above-referenced proposal located at parcel(s)
1432701550. The following comments are based on the pre-application submittal made to the
City of Renton by the applicant.
Water
1. The project is within Soos Creek Water and Sewer District.
2. Obtain a water availability certificate from Soos Creek and provide it with the construction
permit submittal.
3. Review of the water plans will be conducted by Soos Creek Water and Sewer District and the
Renton Regional Fire Authority.
4. Plans approved by Soos Creek shall be routed to the City for final review prior to
construction permit issuance.
Sanitary Sewer
1. The project is within Soos Creek Water and Sewer District.
2. Obtain a sewer availability certificate from Soos Creek and provide it with the construction
permit submittal.
3. Review of the water plans will be conducted by Soos Creek Water and Sewer District and the
Renton Regional Fire Authority.
4. Plans approved by Soos Creek shall be routed to the City for final review prior to
construction permit issuance.
Surface Water
1. There is a City of Renton 12-inch concrete stormwater main to the east of the property that
runs north along 125th Pl SE.
2. Drainage plans and a drainage report complying with the adopted 2022 Renton Surface Water
Design Manual will be required. Refer to Figure 1.1.2.A – Flow Chart of the 2022 Renton
Dan Le Short PlatError! Reference source not found. – PRE23-000050
Page 2 of 4
Surface Water Design Manual (RSWDM) to determine what type of drainage review is
required for this site. The site falls within the City’s Flow Control Duration Standard (matching
forested conditions). The site falls within the Soos Creek drainage basin.
3. The current Surface Water Standard Plans shall be used in all drainage plan submittals. The
current City of Renton Standard Details are available online in the City of Renton website
https://edocs.rentonwa.gov/Documents/Browse.aspx?id=990403&dbid=0&repo=CityofRent
on
4. If the new plus replaced pollution generating impervious surface exceeds 5,000 SF, the
applicant will be required to provide basic water quality treatment. Any proposed detention
and/or water quality vault shall be designed in accordance with the RSWDM that is current at
the time of civil construction permit application. Separate structural plans will be required to
be submitted for review and approval under a separate building permit for the detention
and/or water quality vault.
5. Appropriate on-site BMPs satisfying Core Requirement #9 will be required to help mitigate
the new runoff created by this development to the maximum extent feasible. On-site BMPs
shall be evaluated as described in Section C.1.3 of the 2022 RSWDM. A preliminary drainage
plan, including the application of on-site BMPs, shall be included with the land use application,
as applicable to the project. The final drainage plan and drainage report must be submitted
with the utility construction permit application.
6. A geotechnical soils report for the site is required per the 2022 Renton Surface Water Design
Manual Section C.1.3. Information on the water table and soil permeability (measured
infiltration rates), with recommendations of appropriate on-site BMPs per Core Requirement
#9 and Appendix C shall be included in the report. The report should also include information
concerning the soils, geology, drainage patterns and vegetation present shall be presented in
order to evaluate the drainage, erosion control and slope stability for site development of the
proposed plat. The applicant must demonstrate the development will not result in soil erosion
and sedimentation, landslide, slippage, or excess surface water runoff.
7. Erosion control measures to meet the City requirements shall be provided.
8. The development falls within the R-6 zone which has a maximum impervious surface area of
55% per lot.
9. Effective July 1, 2022, the City of Renton has adopted the 2022 RSWDM, which is based on
the 2021 King County Surface Water Design Manual. All projects vested on or after June 22,
2022 will be subject to these new stormwater requirements. Please refer to RMC 4-1-045
for information regarding project vesting.
10. The development is subject to a surface water system development charge (SDC) fees. Fees
will be charged based on the rate at the time of construction permit issuance.
• The current SDC fee for new single family homes is $2,300 per home.
• A credit will be applied for the existing homes.
• The full fee schedule can be found at: https://rentonwa.gov/city_hall/finance/budget
Transportation
1. Per City code 4-6-060 frontage improvements are required for new construction in excess of
$175,000. The proposed project fronts 125th Pl SE to the east.
a. 125th Pl SE is classified as a residential access street, with an existing right-of-way
(ROW) width of approximately 50-feet with an existing paved width of approximately
26-feet. To meet the City’s complete street standards for a residential access street,
a minimum ROW width of 53-feet is required. A dedication of 1.5-feet of ROW will be
Dan Le Short PlatError! Reference source not found. – PRE23-000050
Page 3 of 4
required. Per RMC 4-6-060 half of street improvements as taken from the ROW
centerline shall be required and include a 10-foot travel lane with a 6-foot parking
lane, a 0.5-foot curb, an 8-foot planting strip, a 5-foot sidewalk and 1-foot clear
behind sidewalk.
b. Cul-de-Sac Design: Cul-de-sacs shall have a minimum paved and landscaped radius
of 45-feet with a ROW radius of 55-feet for the turnaround. A landscaped center
island with a radius of 20-feet delineated by curbing shall be provided in the cul-de-
sac. Low impact development best management practices shall be provided in the
center island where feasible and consistent with City standard details and the
Surface Water Design Manual. The landscaping shall be maintained by the
homeowners’ association or adjacent property owners. The cul-de-sac turnaround
shall have a design approved by the Administrator and the Fire Department.
Additional dedication of approximately 5-feet will be required for the cul-de-sac to
meet the design requirements.
2. Undergrounding of all existing utilities is required on all frontages per RMC 4-6-090.
3. Refer to City code 4-4-080 regarding driveway regulations.
a. A minimum separation of 5 feet is required between driveway and the property line.
b. Maximum driveway slopes shall not exceed 15%. Driveways exceeding 8% shall
provide slotted drains.
c. The maximum width of single loaded garage driveway shall not exceed nine feet (9')
and double-loaded garage driveway shall not exceed sixteen feet (16').
4. Street lighting is not required from a project that consists of less than 4 residential units.
5. Paving and trench restoration within the City of Renton right of way shall comply with the
City’s Trench Restoration and Street Overlay Requirements.
6. The development is subject to transportation impact fees. Fees will be charged based on the
rate at the time of construction permit issuance.
a. The 2023 transportation impact fee is $12,208.54 per single family home.
b. The current property contains one single family home, the developer will receive a
credit for the existing homes.
General Comments
1. If frontage improvements are required, all existing and proposed utility lines (i.e. electrical,
phone, and cable services, etc.) along property frontage or within the site must be
underground as outlined in RMC 4-6-090 – UTILITY LINES - UNDERGROUND INSTALLATION.
The construction of these franchise utilities must be inspected and approved by a City of
Renton inspector.
2. Maximum exposed retaining wall height is 6-ft and shall be setback a minimum of 3-ft from
the right-of-way as outlined in RMC 4-4-040 – Fences, Hedges and Retaining Walls.
3. Adequate separation between utilities as well as other features shall be provided in
accordance with code requirements.
a. 7-ft minimum horizontal and 1-ft vertical separation between storm and other
utilities is required with the exception of water lines which require 10-ft horizontal
and 1.5-ft vertical.
b. The stormwater line should be minimum 5 feet away from any other structure or wall
or building.
Dan Le Short PlatError! Reference source not found. – PRE23-000050
Page 4 of 4
c. Trench of any utility should not be in the zone of influence of the retaining wall or of
the building.
4. All construction utility permits for utility and street improvements will require separate plan
submittals. All utility plans shall confirm to the Renton Drafting Standards. A licensed Civil
Engineer shall prepare the civil plans. Please visit the Development Engineering Forms page
for the most up-to-date plan submittal requirements:
https://rentonwa.gov/cms/one.aspx?portalId=7922741&pageId=9687014
5. A landscaping plan shall be included with the civil plan submittal. Each plan shall be on
separate sheets.
6. Fees quoted in this document reflect the fees applicable in the year 2023 only and will be
assessed based on the fee that is current at the time of the permit application or issuance, as
applicable to the permit type. Please visit www.rentonwa.gov for the current development
fee schedule.
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
M E M O R A N D U M
DATE: March 23, 2023
TO: Pre-Application File No. 23-000050
FROM: Andrew Van Gordon, Associate Planner
SUBJECT: Dan Le Short Plat – 16937 – 125th Pl SE (Parcel number
1432701550)
General: We have completed a preliminary review of the pre-application for the above-
referenced development proposal. The following comments on development and permitting
issues are based on the pre-application submittals made to the City of Renton by the applicant
and the codes in effect on the date of review. The applicant is cautioned that information
contained in this summary may be subject to modification and/or concurrence by official decision-
makers (e.g., Hearing Examiner, Community & Economic Development Administrator, Public
Works Administrator, Planning Director, and City Council). Review comments may also need to be
revised based on site planning and other design changes required by City staff or made by the
applicant. The applicant is encouraged to review all applicable sections of the Renton Municipal
Code. The Development Regulations are available online at
https://www.codepublishing.com/WA/Renton/.
Project Proposal: The applicant proposes to subdivide 16937 – 125th Pl SE (APN 1432701550) into
two (2) residential lots for the benefit of detached dwellings. The property has street frontage
along 125th Pl SE and is located within the Residential – 6 (R-6) zone. The site area is approximately
13,463 square feet (0.30 acre). Access would be from 125th Pl SE with each individual lot having
its own driveway.
Current Use: The project area is currently developed with a detached dwelling. The existing
dwelling is proposed to be retained on Lot 1. There are no critical areas located on the property
per COR Maps.
Zoning/Land Use: The subject property is located within the Residential-6 (R-6) zoning
classification. The Residential Medium Density Land Use designation is intended to implement the
R-6 zone. The R-6 zone is established for single family dwellings. Development in the R-6 zone is
intended to be single family residential at moderate density.
Detached dwellings are permitted within the R-6 zone.
Density: The area of public rights-of-way, legally recorded private access easements and critical
areas (i.e., very high landslide hazard areas, protected slopes (except evaluate on a case-by-case
basis those protected slopes created by previous development, wetlands, Class 1 to 4 streams
and lakes or floodways) would be deducted from the gross site area to determine the “net” site
area prior to calculating density. In order to calculate the proposed density of the project, any
area of public road, private driveway/easement, and/or critical area dedication must be known.
Dan Le Short Plat
Page 2 of 7
March 23, 2023
All fractions which result from net density calculations shall be truncated at two (2) numbers past
the decimal (e.g., 4.5678 becomes 4.56). Calculations for minimum or maximum density that
result in a fraction that is 0.50 or greater shall be rounded up to the nearest whole number. Those
density calculations resulting in a fraction that is less than 0.50 shall be rounded down to the
nearest whole number. The R-6 zone has a minimum density of three (3) dwelling units per acre
with a maximum of six (6) dwelling units per acre. Based on the approximate gross land area of
0.3091 acre, the two (2) lot proposal arrives at a gross density of approximately 6.47 du/ac (2 lots
/ 0.3091 gross acres = 6.47 du/ac).
The gross density would result in 6.47 du/ac; however, the applicant would be required to
demonstrate compliance with the net density requirements of the zone at the time of formal
application. A density worksheet deducting street improvements identified in the preapplication
meeting and this memo would be required with the land use application.
Development Standards: The project would be subject to RMC 4-2-110A, Development Standards
for Residential Zoning Designations effective at the time of complete application (noted as “R-6
standards” herein).
Minimum Lot Size, Width and Depth – The minimum lot size permitted in the R-6 zone is 7,000
square feet for parcels being subdivided. For short plats of parcels smaller than one (1) acre, one
(1) parcel may be allowed to be smaller than the required minimum lot size. If all other parcels
meet the required minimum lot size standard of the zone, one parcel may be allowed to be 6,250
square feet in size in the R-6 zone Minimum lot width is 60 feet (60’); minimum lot depth is 90
feet (90’). In order to ensure compliance with Tier 1 requirements for Tree Preservation Priority,
pursuant to RMC 4-4-130H2a, lot size and lot dimensions of the zone may be decreased by a
maximum of 10 percent (10%), provided the applicant can demonstrate to the Administrator’s
satisfaction that the reduction is necessary to ensure the preservation of all significant trees, as
defined in RMC 4-11-200, required for retention within dedicated tract(s), pursuant to RMC 4-4-
130H1a, Minimum Tree Retention Requirements.
It does not appear that Lot 2 is meeting the minimum depth requirement for the R-6 zone. Lot
depth is measured from the midpoint of the front lot line to the midpoint of the rear lot line. As
proposed Lot 2 would have a depth of approximately 65 feet (65’). Please see the attached site
plan with Planning’s measurements. Submitted plans would need to show compliance with the
required lot size and dimensional standard with the land use application.
Building Standards – The R-6 standards allow a maximum building coverage of 40 percent (40%)
of the lot area. The maximum impervious coverage in the R-6 zone is 55 percent (55%). The
maximum wall plate height is restricted to 24 feet (24’), and the buildings shall be not more than
two (2) stories. Roofs with a pitch equal to or greater than 4:12 may project an additional six (6)
vertical feet from the maximum wall plate height; common rooftop features, such as chimneys,
may project an additional four vertical feet (4’) from the roof surface. Non-exempt vertical
projections (e.g., decks, railings, etc.) shall not extend above the maximum wall plate height
unless the projection is stepped back one-and-a-half horizontal feet (1.5’) from each façade for
each one vertical foot (1’) above the maximum wall plate height. The maximum wall plate height
for detached accessory structures is 12 feet (12’) and the total floor area must be less than that
of the primary structure. Accessory structures are also included in building lot coverage
calculations.
Dan Le Short Plat
Page 3 of 7
March 23, 2023
New development would need to comply with the maximum building coverage, impervious
surface requirements, and building height regulations of the zone at the time of building permit
review. Existing development proposed for retention would also be required to comply with
building and coverage limitations and would be reviewed for compliance at the time of land use
application.
Setbacks – Setbacks are the minimum required distance between the building footprint and the
property line. The required setbacks for the R-6 zone are: Front yard: 25 feet (25’) Rear yard: 25
feet (25’); Side yards: combined 15 feet (15’) with not less than 5 feet (5’) on either side; and
secondary front yards: 25 feet (25’). Within subdivisions, the minimum front yard and secondary
front yard setback may be reduced to no less than twenty feet (20') provided the applicant can
demonstrate to the Administrator’s satisfaction that the setback reduction is necessary to
preserve and maintain a landmark tree within a tree protection tract, as each term is defined in
RMC 4-11-200, Definitions T. An arborist report, pursuant to RMC 4-8-120D1, shall be prepared
and provided to the City for review and concurrence, demonstrating that the setback reduction
and project proposal serve to preserve the critical root zone of the tree within a tree protection
tract.
Compliance with required setbacks for new development would be verified at the time of
building permit application. Existing development proposed for retention would be reviewed for
compliance at the time of land use application.
Residential Design and Open Space Standards
Future single-family building permits would be subject to the RMC 4-2-115, Residential Design
and Open Space Standards. Requirements related to garages, entries, modulation,
windows/doors, scale, bulk, and character, roof forms, eaves, architectural detailing, and
materials/color should be reviewed in their entity prior to submitting permit applications.
Compliance with lot configuration requirements would be verified at the time of land use
application. Compliance with building design requirements would be verified at the time of
building permit review.
Access/Parking: Access to all lots is proposed from 125th Pl SE via individual driveways. The
existing residence would maintain its existing access. Each lot is required to accommodate off
street parking for a minimum of two (2) vehicles. The maximum width of single loaded garage
driveways shall not exceed nine feet (9’) and double loaded garage driveways shall not exceed 16
feet. Maximum driveway slopes shall not exceed 15 percent; provided, that driveways exceeding
eight percent (8%) shall provide slotted drains at the lower end with positive drainage discharge
to restrict runoff from entering the garage/residence or crossing any public sidewalk. Driveways
shall not be closer than five feet (5’) to any property line except as allowed per RMC 4-4-080I9,
Joint Use Driveways.
Compliance with access requirements would be verified at the time of land use application.
Compliance with driveway requirements would be verified at the time of building permit review.
Landscaping: With the exception of critical areas, all portions of the development area not
covered by structures, required parking, access, circulation or service areas, must be landscaped
with native, drought-resistant vegetative cover. The minimum on-site landscape width required
along street frontages is 10 feet and shall contain trees, shrubs, and landscaping. Street trees in
the ROW planter will also be required. Landscaping may include hardscape such as decorative
Dan Le Short Plat
Page 4 of 7
March 23, 2023
paving, rock outcroppings, fountains, plant containers, etc. Minimum planting strip widths
between the curb and sidewalk are established according to the street development standards of
RMC 4-6-060, Street Standards. Street trees and, at a minimum, groundcover are to be located in
this area when present. Street trees shall be planted in the center of the planting strip between
the curb and the sidewalk at the following intervals; provided, that, where right-of-way is
constrained, irregular intervals and slight increases or decreases may be permitted or required.
Additionally, trees shall be planted in locations that meet required spacing distances from
facilities located in the right-of-way including, but not limited to, underground utilities,
streetlights, utility poles, traffic signs, fire hydrants, and driveways; such spacing standards are
identified in the City’s Approved Tree List. Generally, the following spacing is required: i. Small-
sized maturing trees: thirty feet (30') on center; ii. Medium-sized maturing trees: forty feet (40')
on center; and iii. Large-sized maturing trees: fifty feet (50') on center.
A conceptual landscape plan shall be provided with the land use application as prepared by a
licensed Landscape Architect, a certified nurseryman or other certified professional. Please be
aware that frontage improvements will be required.
Storm drainage facilities are required to comply with the minimum 15-foot perimeter
landscaping strip on the outside of the fence unless otherwise determined through the site plan
review or subdivision review process. Please refer to landscape regulations RMC 4-4-070 for
further general and specific landscape requirements.
Significant Tree Retention: A review of COR Maps appears to show that there are mature trees
on the site. When significant trees (greater than 6-inch caliper or 8-caliper inches for alders and
cottonwoods) are proposed to be removed, a tree inventory and a tree retention plan along with
an arborist report, tree retention plan and tree retention worksheet shall be provided with the
formal land use application as defined in RMC 4-8-120. The tree retention plan must show
preservation of at least 30% of significant trees. Please refer to RMC 4-4-130, Tree Retention and
Land Clearing Regulations for further general and specific tree retention and land clearing
requirements.
In addition to retaining a minimum of 30% of existing significant trees, each new lot would be
required to provide a minimum tree density of 30 tree credits per net acre. Tree credits encourage
retention of existing significant trees with larger trees being worth more tree credits.
TREE SIZE TREE CREDITS
New small species tree 0.25
New medium species tree 1
New large species tree 2
Preserved tree 6 – 9 caliper inches 4
Preserved tree 10 – 12 caliper inches 5
Preserved tree 12 – 15 caliper inches 6
Dan Le Short Plat
Page 5 of 7
March 23, 2023
TREE SIZE TREE CREDITS
Preserved tree 16 – 18 caliper inches 7
Preserved tree 19 – 21 caliper inches 8
Preserved tree 22 – 24 caliper inches 9
Preserved tree 25 – 28 caliper inches 10
Preserved tree 29 – 32 caliper inches 11
Preserved tree 33 – 36 caliper inches 12
Preserved tree 37 caliper inches and
greater
13
Protected trees within a subdivision shall be retained in the order of priority listed in RMC 4-4-
130H2. Protection of trees or groves by placement within a dedicated tract (Tier 1) is the highest
priority.
Significant trees shall be retained in the following priority order:
Priority One: Landmark trees; significant trees that form a continuous canopy; significant trees on
slopes greater than twenty percent (20%); significant trees adjacent to critical areas and their
associated buffers; significant trees over sixty feet (60') in height or greater than eighteen inches
(18") caliper; and trees that shelter interior trees or trees on abutting properties from strong
winds, which could otherwise allow such sheltered trees to be blown down if removed.
Priority Two: Healthy tree groupings whose associated undergrowth can be preserved; other
significant native evergreen or deciduous trees; and other significant non-native trees.
Priority Three: Alders and cottonwoods shall be retained when all other trees have been
evaluated for retention and are not able to be retained unless the alders and/ or cottonwoods are
used as part of an approved enhancement project within a critical area or its buffer.
The Administrator may require independent review of any land use application that involves tree
removal and land clearing at the City's discretion.
The Administrator may authorize the planting of replacement trees on the site if it can be
demonstrated to the Administrator's satisfaction that replacement requirements in RMC 4-4-
130H1e can be met.
Tree retention standards shall be applied to the developable area, as defined in RMC 4-11-040,
Definitions D, of a property. A formal tree retention plan and tree retention worksheet prepared
by an arborist or landscape architect would be reviewed at the time of the land use application.
Fences/Walls: If the applicant intends to install any fences or retaining walls as part of this project,
the location must be designated on the landscape plan and grading plan with top of wall and
bottom of wall elevations. A fence and/or wall detail should also be included on the plan. A
retaining wall that is 4 feet or taller, as measured by the vertical distance from the bottom of the
Dan Le Short Plat
Page 6 of 7
March 23, 2023
footing to the finish grade at the top of the wall requires a building permit. The maximum height
of any fence or retaining wall is 72-inches subject to further height limitations in setbacks and
clear vision areas noted in RMC 4-4-040D. A fence shall not be constructed on top of a retaining
wall unless the total combined height of the retaining wall and the fence does not exceed the
allowed height of a standalone fence. For more information about fences and retaining walls refer
to RMC 4-4-040.
Critical Areas: According to COR Maps, there are no critical areas or their buffers on the property
or within an applicable distance. It is the applicant’s responsibility to determine if designated
critical areas or their buffers are located on the property.
Environmental Review: Short Plats are generally exempt from State Environmental Policy Act
(SEPA) review. However, the project may be subject to Environmental Review, in accordance with
RMC 4-9-070 H.3., if it is determined that designated critical areas or their buffers are located on
the property.
Permit Requirements: The proposal would require administrative short plat approval. The
application would be reviewed within an estimated time frame of six to eight weeks. The 2023
fees would total $6,384.00 ($6,080.00 Preliminary Short Plat + $304.00 Technology Fee (5%) =
$6,080.00). Each modification request is $290.00. A 5% technology fee added to the total cost of
the reviews would also be assessed at the time of land use application. All fees are subject to
change. Detailed information regarding the land use permit application submittal requirements
can be found on the Short Plat Submittal Requirements checklist. Other informational applications
and handouts can be found on the City’s Digital Records Library. The City requires electronic plan
submittal for all applications. Please refer to the City’s Electronic File Standards. A Final Short
Plat application, and its associated fee, will be required following construction of the subdivision’s
infrastructure.
Public Information Sign: Public Information Signs are required for all Type II Land Use Permits as
classified by RMC 4-8-080, Permit Classification. Public Information Signs are intended to inform
the public of potential land development, specific permits/actions being considered by the City,
and to facilitate timely and effective public participation in the review process. The applicant must
follow the specifications provided in the public information sign handout. The applicant is solely
responsible for the construction, installation, maintenance, removal, and any costs associated
with the sign.
Fees: In addition to the applicable building and construction fees, impact fees would be required.
The fee in effect at the time of residential building permit issuance will apply. For informational
purposes, the 2023 impact fees are as follows:
• A Transportation Impact Fee assessed at $12,208.54 per each new detached dwelling unit.
• A Parks Impact Fee assessed at $3,276.44 per each new detached dwelling unit subdivision.
• A Fire Impact Fee assessed at $829.77 per each new detached dwelling unit.
• A Renton School District Impact Fee assessed at $2,911.00 (plus a 5% processing charge)
per each new detached dwelling unit.
A handout listing Renton’s development-related fees is available on the City of Renton website
for your review.
Dan Le Short Plat
Page 7 of 7
March 23, 2023
Next Steps: When the formal land use application materials are complete, the applicant shall have
the application materials pre-screened prior to submitting the complete application package.
Please contact Andrew Van Gordon, Associate Planner at avangordon@rentonwa.gov or (425)
430-7286 for an appointment.
Expiration: Upon approval, the Short Plat is valid for five years with a possible one-year extension
(RMC 4-7-070M). It is the responsibility of the owner to monitor the expiration date.
125TH
PLACE
SE
TO REMAIN
SHEETS
OF
SHEET
NO.DATEBYREVISION DESCRIPTIONCHECKED BY:DRAWN BY:DESIGNED BY:JOB NO.PROJ. MNGR:ISSUE DATEDAN LE SHORT PLAT1 125TH PLSERENTON :A 5PARCEL N8M%ERS 121551
H%H%H%H%1
LOT LA<O8TNORTH
*RAPHIC SCALE
12
1 INCH 2 )THDB DEVELOPMENTS INC22 MARINE 9IE: 'R S'ES MOINES :A 1