Loading...
HomeMy WebLinkAboutMFP23001284.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP23001284 IVR Number: 23001284 Permit Information Permit Name: Puget Sound Energy - Electric Address/Location:03/09/2023Application Date:3340403805Parcel Number: 1415 MAPLE AVE SW Permit Type:03/23/2023Issue Date:Franchise Permit Work Class:03/22/2024Expiration Date:Minor Utility Job Number: 105100741Franchise Type:Electric Description: Puget Sound Energy Electric CREW TO SPLICE INTO EXISTING CONDUIT AND CABLE IN ROW AT IP1. POTHOLE ALL EXISTING UTILITIES. RESTORATION PER CITY OF RENTON STANDARDS. Contacts Name Address PhoneTypeBilling Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031ApplicantX Vicki Henson Potelco Inc 8001 212th St S Kent, WA 98032 B: (253) 863-0484Contractor Business License Number: 5109Electrical Contractor: POTELI*344O4 Construction Contractor: POTELI*227PL Puget Sound Energy Inc 10885 NE 4th Street, PSE08-N08 Bellevue, WA 98009 B: (888) 225-5773Emergency Contact EWA 1415 MAPLE OWNER LLC 1099 18TH ST #2900 DENVER, CO 80202 Owner Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031Specialized Billing General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. DEPARTMENT OF PUBLIC WORKS Page 1 of 3 | Published: 10/27/2021 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN APPLICATION Published: 10/27/2021 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. 1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents. 2. The following items are all required for submittal of the TCP Application: ☐Electronic Copy of the TCP Application ☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall: Include map(s) showing the location of the project and work area. Be legible lettering and clear, contrasting, symbols of viewing or printing. Must indicate street names, and north arrow and scale. Types of plans required: o Work hour plan – show all mobility impacts during construction hours. o Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. o Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. o Pedestrian access/detour plan, if applicable. - Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. 3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].” Project Name: Permit #: Site Address: Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Construction Company: Contact Name: Phone/Cell: _________________________ Business Address: City/State: Zip: Description of Work: Approval By: _________________________________________________ Date:____________________ Transportation Engineering PLEASE SEE ATTACHED POTELCO, INC 6905 S 228TH ST KENT, WA 98032 105100741 1415 MAPLE AVE SW Lucas Knauss 253-313-8029 MFP23001284 Scott Warlick CED 3/23/2023 Monday - Friday 8:00AM - 3:00PM Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 3 | Published: 10/27/2021 PERMIT HOLDER AGREES TO ALL THE FOLLOWING: Must have approved Traffic Control Plan (TCP) prior to commencing the work. Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the traveled way. Comply with all traffic regulations of the City of Renton and the State of Washington. Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends and holidays) prior to starting any work. Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140 with any questions. Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes. Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. All permit conditions shall be met. NOTES: Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by a traffic control plan layout or reference to WSDOT. Approved Temporary Traffic Control Plan must be at the work site during work hours. Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 3 of 3 | Published: 10/27/2021 In the case of Temporary No Parking Zones, all the following apply in addition to previous: Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). I certify that the information on this application and within the submittal documents are accurate to the best of my knowledge and I acknowledge all the requirements on this application. Applicant’s Signature Date Applicant’s Name (Print) CORRIE RYDBERG 1415 17 17 SW 16TH ST MAPLE AVE SW111111ROAD ENDS V01 BUSINESS OWNER(S) WILL BE INFORMED OF POSSIBLE TEMPORARY DRIVEWAY CLOSURE J S IP1 SJJ SW1J02J01 V02 SW2 STOP FLAGGER STOP FLAGGER W20-7A100'ROADWORKAHEADW20-1BEPREPAREDTOSTOPW3-4350'350'ROADWORKAHEADW20-1 BEPREPAREDTOSTOPW3-4 350'350' S/W CLOSEDR9-9S/WCLOSEDR9-9PLACE SIGNS ALONG WORK AREAFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PA R K THE CREW SHALL CEASE WORK FOR A FLAGGER/SPOTTER TO ESCORT PEDESTRIANS AROUND THE WORK AREA X'X'PLACE W20-1 SIGNS ON ALL ADJACENT STREETS WITHIN FEET OF WORK AREA ROAD WORK AHEAD W20-1ROADWORKAHEADW20-1TEMPORARY TRAFFIC CONTROL PLAN N SIGN SPACING MPH 60/65 45/55 35/40 30 25 "X" 1000' 500' 350' 200' 100' CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 Project Address: Page PSE PUGETSOUNDENERGY Designer: Job # REV Ina Ustemchuk 425-398-6063 ina.ustemchuk@pse.com 1 OF 11415 Maple Ave SW, Renton, WA 0 512653597 02/13/2023 Puget Sound EnergyTraffic Control Supervisor: Ina Ustemchuk Card No. 012928 Card Exp.07/31/2025 ina.ustemchuk@pse.com (425)398-6063 Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 36" x 36" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 10' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m unless otherwise specified. All work for arterials and major roadways will be from 9 a.m. to 3 p.m. WORK PIT 28" TRAFFIC CONE LEGEND TRAFFIC FLOW SIGN LOCATION FLAGGER STOP WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY MFP23001284 14151420316MAPLE AVE SWSW 16TH STROW60'317329-165706UNKSLAG7010317357-165707 T0/1725 kVA 120/240V (C)UNK (UNK)SLAG7011ROW95'317315-165708317314-165707317324-165684112 kVA 120/208V (ABC)317340-1657022500 kVA 480V (ABC)317339-1657022500 kVA 277/480V (ABC)317338-165702317337-165684317337-165686317337-165688SW#_____317351-165711317337-16570450 kVA 120/240V (C)317338-165704VIC14317314-165673JJJJJPRIMARY CABLE & CONDUIT TABLELOCATIONCONDUITCABLEASBUILT INFORMATION - FOREMAN COMPLETEFROMTOSIZE(IN)QTY.DESIGNLENGTH(FT)BENDSPULL(LBS)PULLREV(LBS)CABLESIZEDESIGNLENGTH(FT)PHASE - ID TAGRECORDRECORD PHASE TAPPED & ACTUAL FOOTAGE INSTALLED90°45°22°11°ABCMANUFACTURERCOMPOUNDYEARNOTESCONDUITCABLEIP1SW14150'1081081/0AL JKT60'----SW1J02415'1031031/0AL JKT25'---SW1SW24120'1061061/0AL JKT40'---SW1EM14125'CONDUIT ONLYJ02J01415'1031031/0AL JKT25'---J01V014180'11321321/0AL JKT100'---J01V024190'11331341/0AL JKT110'---J01SW24165'11531541/0AL JKT85'---4" PVC (FT) & BENDS =615.000000'12003Ø 1/0 AL JKT TOTAL (FT)=445'___POWER GENERAL NOTES - COMMERCIAL PROJECT8.EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction andrestoration per this sketch and per PSE standards. A minimum protective cover of 36" is required overPSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customerwill provide any and all shoring or they will side slope the trench to 1:1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation fromthis work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.All switching arrangements and/or outage arrangements are to be made with the Project Manager at leastthree (3) working days in advance.Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencingwork to get the underground facilities located.STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk,etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager.SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or constructionmaterials which would restrict construction and/or equipment access, before work can begin.Roads shall be paved or have a compacted , crushed rock base in place.CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet fromcombustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guardposts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water,storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them, oras required by your local municipality.All work is to be done in accordance with local municipal and county permit requirements as applicable.Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduitsand crossings from the individual unit's meter base to the designated connection point on private property.Inclement weather conditions may cause delays in construction times and dates.1.2.3.4.5.6.7.9.11.10.SITE PLANSCALE: 1" = 50'CUSTOMER DEVELOPMENT NOTES:A PRE CONSTRUCTION MEETING IS REQUIRED WITH YOUR PROJECT MANAGER PRIOR TO STARTING ANY SITEWORK.CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGETSOUND ENERGY STANDARDS & LOCAL MUNICIPALITY.**DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL**CUSTOMER IS RESPONSIBLE FOR THE FOLLOWING:CROSSING/BORING.-OPEN TRENCH OR BORING FOR CROSSINGS ARE ALLOWED PER LOCAL MUNICIPALITY PERMITREQUIREMENTS.-CROSSINGS IN RIGHT OF WAY MUST BE SCHEDULED WITH PROJECT MANAGER PRIOR TOCONSTRUCTION.-PROJECT MANAGER OR DESIGNATED REPRESENTATIVE MUST BE ON SITE DURING CONSTRUCTIONWORK IN RIGHT OF WAY.-EXCAVATION CONTRACTOR MUST BE LICENSED AND BONDED TO PERFORM WORK IN RIGHT OF WAY.VAULTS & WORK PITS.-REQUIRED TO PROVIDE 4' X 4' WORK PIT AT V01, V02, SW2 AND IP1-REQUIRED TO PROVIDE 11' X 9' WORK PIT & 19-1/2 CUBIC YARDS OF 6” CRUSHED ROCK AT J01 & J02-REQUIRED TO PROVIDE 16’ X 10’ WORK PIT & 50-1/2 CUBIC YARDS OF 6” CRUSHED ROCK AT SW1.JOB SITE READINESS.-JOB SITE NEEDS TO BE 100% READY FOR INSPECTION 5 BUSINESS DAYS PRIOR TO CONSTRUCTION DATE.-ALL WORK IN RIGHT OF WAY MUST BE COORDINATED WITH PROJECT MANAGER AND LOCAL MUNICIPALITY.-ALL TRENCH, AND LOCAL ELECTRICAL MUNICIPALITIES AKA "L&I, CITY", INSPECTIONS MUST BECOMPLETED 5 BUSINESS DAYS PRIOR TO SCHEDULED CONSTRUCTION DATE.-REQUIRED TO OPERATE AND PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS, VAULTS &TRENCH AT ALL TIMES.-REQUIRED TO HAVE EXCAVATION EQUIPMENT AND BE ON SITE THE DAY OF CONSTRUCTION TO COMPLETE BACKFILLING.- IF A SECOND INSPECTION IS REQUIRED, ADDITIONAL FEE'S WILL BE APPLIED.-PLEASE REVIEW THE CITY OR KING COUNTY TRENCHING REQUIREMENTS UNDER THE PERMIT.-IF A PRE-CON IS REQUIRED BY THE CITY, COUNTY OR W.S. DOT A PSE PROJECT MANAGER WILL SET-UP ANDSCHEDULE A MEETING WITH THE MUNICIPALITY BEFORE ANY EXCAVATION OR INSTALLATION BEGINS .JOB SITEASPLUNDH CONSTRUCTION CORP. - QA/QC T. MYERSITE SPECIFIC NOTESAT PV1: 317315-165708-EXISTING STRUCTURE TO REMAINAT IP1:-INSTALL (3) 12kV 1/0 SOL JACK PER STANDARD 6041.2000 (SPL10J)AT V01: 317340-165702-EXISTING STRUCTURE & 2500kVA 277/480V XFMR TO REMAINAT V02: 317339-165702-EXISTING STRUCTURE TO REMAIN-INSTALL (1) 2500KVA PADMOUNT TRF (MID: 6259500)-INSTALL (3) 12kV ELBOW KIT PER STD 6041.1000 (ELB10J)-INSTALL (4) 501 TO 750 KCMIL CONNECTOR LUGS (MID 7651003)-INSTALL (16) MOUNTING BOLT KITS (MID 7651008)-INSTALL GRID #317339-165702-CONNECT 6-RUNS OF CUSTOMER OWNED, INSTALLED, & MAINTAINED 600 KCMIL AL SVCAT SW2: 317338-165702-EXISTING STRUCTURE TO REMAINAT J01: 317337-165684-INSTALL (1) HH 4'8" X 7' X 5' HH W/ GROUNDS PER STD 6055.1030 (JBOX15L)-INSTALL (12) 12kV ELBOW KIT PER STD 6041.1000 (ELB10J)-NORMAL OPEN TO J02-INSTALL GRID #317337-16586AT J02: 317337-16586-INSTALL (1) HH 4'8" X 7' X 5' HH W/ GROUNDS PER STD 6055.1030 (JBOX15L)-INSTALL (6) 12kV ELBOW KIT PER STD 6041.1000 (ELB10J)-NORMAL OPEN TO SW1-INSTALL GRID #317337-16586AT SW1: 317337-165688-INSTALL (1) HH 5106 W/3' SQ AND 58"X66" HOLE W/ GROUNDS PER STD 6056.1010 (PME0915)-INSTALL (1) SWGR PDMT 15KV 2SW2FU DEAD-FRONT (MID: 9995761)-INSTALL GRID #317337-165688SPAN SPECIFIC NOTESSEE TABLES FOR SPAN INFORMATIONCABLE/WIRE REMOVAL TABLESPANACTUAL LENGTHREMARKSFROMTOCABLE TAGLENGTHCONDUITWIREIP1SW2ACG406-408-SW2V01ACG412-414-SW2V02ACG409-411VAULT & EQUIPMENT TABLESITE #GRID #VAULT SIZE &COVERTYPE & SIZEEQUIPMENT INVAULTPRIMARYBUSHINGSTRANSFORMER ID NUMBERS(COMPANY ID)AS-BUILT INFORMATIONLBDCFOREMAN: INCLUDE PHASE TAPPEDV01317340165702EXISTINGVAULTEXISTING 2500KVAXFMR--V02317339165702EXISTINGVAULTNEW 2500KVA277/480VMID: 62595003-J013173371656844'8"x7'x5'w/2-3' Sq DoorsMatid: 7663200J-Box Below Gradew/4-Pos J-Bus x3Matid: 762590012-JBOX15L 6055.1030 ABCØCAP (7630600)J02317337165864'8"x7'x5'w/2-3' Sq DoorsMatid: 7663200J-Box Below Gradew/4-Pos J-Bus x3Matid: 762590066JBOX15L 6055.1030 ABCØCAP (7630600)SW13173371656885106 W/3' Sq &58"X66" HoleMatid: 9996351SWGR PDMT 15kV2Sw 2FU Dead-frontMatid: 9995761PME0915 6056.1010 ABCØGASPHONECABLE TVPROJECT PHASEPWRNOTIF#ORDER#512653597105100741Superior_____________________JOB SITESCALE: 1:100UNDERGROUND CIRCUIT MAP 2305E074SEJOB SITE001"2"0050'100'NVicinity MapN/AARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSIONSTRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)EROSION & SEDIMENT CONTROL REQUIREMENTSNOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROLEROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.FOREMAN (CHECK BOX WHEN COMPLETED)PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.Grid, Cable, and Switch numbers INSTALLED & VERIFIED.Field Changes RED-LINED on As-built.Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.Foreman's Signature _______________________________________________Print Name ___________________________________ Date ______________Material VERIFIED and CHANGES noted on Paperwork.Total PRIMARY Cable noted on As-built.Company ID#'s RECORDED in correct location on As-built.Deviations noted on the As-built and their reason.I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met.PSENoNoNoYesYesYesNoYesDeveloper"Flagging Required""Outages Required""Locates Required"THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIESCALL 811 TWO BUSINESS DAYS BEFORE YOU DIGFor contacts below dial 1-888-CALL PSE (225-5773)CIRCUIT LOADING TABLEAS OFEXIST. PEAK LOADEST. NEW LOADTOTALCIRCUIT:A PHASE B PHASE C PHASEVIC-1405/2022108.04109.93107.9849.0049.0049.00157.04158.93156.98Installed at site:Grid Number:kVA Rating:Foreman to redline the following informationTRANSFORMER INSTALLATIONCompany ID#:Primary phase connected to:Tested Secondary VoltageMaterial ID#:V02317339-1657022500kVA6259500UTILITIESCONTACTPHONE#COUNTY1/4 SECU-MAP NO (POWER)OP MAPEmer SectGas Wk CtrPOWER WK CTRPLAT MAPJOINT FACILITIES ARRANGEMENTSDRAWN BYCHECKED BYAPPROVED BYFOREMAN #1FOREMAN #2MAPPINGINCIDENTMAOPGas OrderElect OrderSCALEPAGEENGR - POWERENGR - GASFUNCTIONPROJECT MGRPERMITREAL ESTATE/EASEMENT21REV#3DATEDESCRIPTIONBYCONTACTPHONE NODATEOH CKT MAPCIRCUIT NOUG CKT MAPL. KNAUSS253-313-802908/23/22T. PAULSEN253-318-689708/23/22E. SCHOTT714-893-240508/23/22REQUIREDRENTONBLUE ORIGIN 2MULTI 3Ø PRI L/E1415 MAPLE AVE SW, RENTON, WA 98057N/AN/AN/A105100741AS NOTED1 OF 2KINGN/AN/ACSPSKEPMNW 19-23N-05EN/AN/A2305E0742305E0762305E074SEVIC-14N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AE-Mail:Cell Phone:Project Manager Contact Information:Manager:LUCAS KNAUSS253-313-8029LUCAS.KNAUSS.COM105100741SCALE: 6" = 1 MILEOVERHEAD CIRCUIT MAP 2305E076Owner / Developer Contact InfoofficeATTN:BLUE ORIGIN LLC2128 76TH AVE SKENT, WA 98032ROLY DUNGAN206-406-5253CIRCUIT FEET ADDED: SQ. FOOTAGE:PANEL SIZE:HEAT TYPE:EST. DEMAND:LRC:% V. DROP:% FLICKER:315'37,088 SQ FT2000AELECTRIC887.84kW0A1.5%0%The Majority of thiswork is on privateproperty and mayrequire additionalapproval from theproperty ownersPOTHOLE ALL EXISTING UTILITIESRESTORATION PER CITY OF RENTON STANDARDSMFP23001284 1-4" SCH-80 CONTINUOUS PVC CONDUITPSE INSTALLED4' X 4' WORK PITCUSTOMER SUPPLIED4' X 4' WORK PITCUSTOMER SUPPLIED1-4" SCH-80 CONTINUOUS PVC CONDUITPSE INSTALLED1-4" SCH-80 CONTINUOUS PVC CONDUITPSE INSTALLED4' X 4' WORK PITCUSTOMER SUPPLIED4' X 4' WORK PITCUSTOMER SUPPLIED9' X 11' WORK PITCUSTOMER SUPPLIED1-4" SCH-80 CONTINUOUS PVC CONDUITPSE INSTALLED1-4" SCH-80 CONTINUOUS PVC CONDUITPSE INSTALLED1-4" SCH-80 CONTINUOUSPSE INSTALLED9' X 11' WORK PITCUSTOMER SUPPLIED1-4" SCH-80 CONTINUOUS PVC CONDUITPSE INSTALLED90°R=60"45°R=60"45°R=60"45'20'50'20'40'45'35'16' X 10' WORK PITCUSTOMER SUPPLIEDPVC CONDUIT1-4" SCH-80 CONTINUOUS PVC CONDUITPSE INSTALLEDJJ5'5'40'20'25'45'15'15'JJPSE INST. 1-RUN 1/0 UG JKT CABLE(AØXXXXXX)(BØXXXXXX)(CØXXXXXX)PSE INST. 1-RUN 750MCM CABLE(AØXXXXXX)(BØXXXXXX)(CØXXXXXX)PSE INST. 1-RUN 1/0 UG JKT CABLE(AØXXXXXX)(BØXXXXXX)(CØXXXXXX)PSE INST. 1-RUN 750MCM CABLE(AØXXXXXX)(BØXXXXXX)(CØXXXXXX)PSE INST. 1-RUN 1/0 UG JKT CABLE(AØXXXXXX)(BØXXXXXX)(CØXXXXXX)PSE INST. 1-RUN 1/0 UG JKT CABLE(AØXXXXXX)(BØXXXXXX)(CØXXXXXX)PSE INST. 1-RUN 1/0 UG JKT CABLE(AØXXXXXX)(BØXXXXXX)(CØXXXXXX)PSE INST. 1-RUN 1/0 UG JKT CABLE(AØXXXXXX)(BØXXXXXX)(CØXXXXXX)N.O.N.O.105100741CommunicationsPrimary PowerCables or ConduitExcavated Dirt PileROADSIDEFinal Grade24" Min12" MinSeparation36"MinCover48"MaxBackfill(No rocks over 10" diameter)Separation12" MinGas4" Sand Bedding32" Typical(Power, Gas, andCommunications)JOINT TRENCH DETAILPrimary-Mainline Gas & Communications (NTS)Separation12" Min6" or 12" Min Sand Shading after Compaction- A 6" layer of sand is allowed when excavated native material contains rocks no larger than 8" in diameter.Trench and backfill requirements for primary electric line extension trenches (No PSE gas)- A 12" layer of sand is required when excavated native material contains rocks up to 10" in diameter.FLOW DIRECTIONLAY 8" BOTTOM SKIRT ON TOP OF NATIVE SOIL,SECURE WITH PEA GRAVEL BAGS.6'3'8"TECHNIQUES FOR EROSION AND SEDIMENT CONTROLSILT FENCE DETAILNot to Scale0150.3200Cables should enter the vault so that all ofthe cables will lay in the same direction.TOP VIEWJ- BOX CABLE ENTRY DETAILNot to scaleASPLUNDH CONSTRUCTION CORP. - QA/QC T. MYERTHIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIESCALL 811 TWO BUSINESS DAYS BEFORE YOU DIGFor contacts below dial 1-888-CALL PSE (225-5773)NEW CONDUIT DIAGRAMNOT TO SCALENEW CABLE DIAGRAMNOT TO SCALEPARTIAL PLAN DETAILSCALE: 1" = 20'CLEAR WORKING SPACE FOR J-BOXNOT TO SCALEFIELD SIDE (PREFERRED)ROAD SIDE (PREFERRED)6' MIN3'MIN3'MIN3' MIN2"Excavation - 19-1/2 cubic yardsSIDE VIEW5'-4"Crushed6"RockTOP VIEW9'11'7'-0"4'-0"1'4'-8"4,750 lbs2,490 lbsVAULT & EXCAVATION DETAIL @ J01 & J02Not to scale6055.1030NOT TO SCALECROSS SECTION - MAPLE AVE SWLOOKING NORTHE60' ROWCLWUTILITIESCONTACTPHONE#COUNTY1/4 SECU-MAP NO (POWER)OP MAPEmer SectGas Wk CtrPOWER WK CTRPLAT MAPJOINT FACILITIES ARRANGEMENTSDRAWN BYCHECKED BYAPPROVED BYFOREMAN #1FOREMAN #2MAPPINGINCIDENTMAOPGas OrderElect OrderSCALEPAGEENGR - POWERENGR - GASFUNCTIONPROJECT MGRPERMITREAL ESTATE/EASEMENT21REV#3DATEDESCRIPTIONBYCONTACTPHONE NODATEOH CKT MAPCIRCUIT NOUG CKT MAPL. KNAUSS253-313-802908/23/22T. PAULSEN253-234-643508/23/22E. SCHOTT714-893-240508/23/22REQUIREDRENTONBLUE ORIGIN 2MULTI 3Ø PRI L/E1415 MAPLE AVE SW, RENTON, WA 98057N/AN/AN/A105100741AS NOTED2 OF 2KINGN/AN/ACSPSKEPMNW 19-23N-05EN/AN/A2305E0742305E0762305E074SEVIC-14N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AExcavation - 50-1/2 cubic yardsSIDE VIEWRockCrushed6"8'-6"2"16'TOP VIEWVAULT & EXCAVATION DETAIL@ SW1Not to scale6056.10108"7'-6"10'5-10" MIN6'-4" MAX11'-4" MIN11'-10" MAX8'-2"6'-5" PME 9 & 126'-8"PME 10 & 1158" PME 9 & 1255" PME 10 & 11Re-orientation of cover66"11'2"3'X3' DIAMOND PLATEMFP23001284