Loading...
HomeMy WebLinkAboutNOA_Project Acceptance_20230321DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION AND PROPOSED DETERMINATION OF NON-SIGNIFICANCE (DNS) A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: March 23, 2023 PROJECT NAME/NUMBER: PR23-000059 Burnett Ave S and Williams Ave S Storm System Improvement / LUA23-000085, ECF, SME PROJECT LOCATION: Burnett Ave S to Williams Ave S, and S 2nd Street to the Cedar River. S Tobin St from Burnett Ave s to Williams Ave S APPLICANT/PROJECT CONTACT PERSON: Troy Solly, City of Renton / 1055 S Grady Way, Renton WA 98057 / tsolly@rentonwa.gov LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/i4bVnYP PROJECT DESCRIPTION: The City of Renton is requesting Environmental (SEPA) Review and a Shoreline Exemption for the replacement of existing undersized storm water conveyance pipes and the installation of two modular wetland water quality facilities within the existing public right-of-way on Burnett Ave S and Williams Ave S between 2nd St S and the Cedar River and S Tobin St between Burnett Ave S and Williams Ave S. The proposed, larger storm water pipes would help to minimize flooding within the project area. The proposed project would include removal and in-kind restoration of asphalt surfacing, concrete sidewalks, grass and other surface features as necessary for the installation of the storm water improvements. A portion of the project site would be located within 200 feet o f the Cedar River, a Shoreline of the State. The project site would be located within the Shoreline High Intensity Designation of Cedar River, Reach B. The project site is mapped within a seismic hazard area and wellhead protection area, zone 1. DATE OF APPLICATION: March 21, 2023 NOTICE OF COMPLETE APPLICATION: March 23, 2023 OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give no tice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS. PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review, Shoreline Exemption OTHER PERMITS WHICH MAY BE REQUIRED: None at this time REQUESTED STUDIES: Geotechnical Report, Wetland Assesment CONSISTENCY OVERVIEW: Zoning/Land Use: The subject site is designated Commercial Mixed Use (CMU) on the City of Renton Comprehensive Land Use Map and Center Downtown (CD) on the City’s Zoning Map. Environmental Documents that Evaluate the Proposed Project: Environmental (SEPA) Checklist NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR23-000059 Burnett Ave S and Williams Ave S Storm System Improvement / LUA23-000085, ECF, SME Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  Development Regulations Used For Project Mitigation: The project will be subject to the City’s SEPA ordinance, RMC 4-3-090 and other applicable codes and regulations as appropriate. Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting. Comments on the above application must be submitted in writing by 5:00 PM on April 6, 2023. Please submit comments online at https://cutt.ly/SQvBak4 . Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. For more information about this proposal, contact the Project Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Jill Ding, Senior Planner; Tel: (425) 430-6598; Email: jding@rentonwa.gov