FIELD REPORT
Project No. 7334.06 Page 1 of 2 Report ID 7334.06 E 01262023
Date Thu 1/26/2023 Weather 46F Cloudy
Arrival/Departure Time(s) 12:30PM – 3:00PM Travel Time (hr).5
Project Name Brennon Landing
Location 1400 Aberdeen Ave NE, Renton
ESNW Rep. & Phone Nathan Dalton | 206.355.9308
Owner Info/Contact MainVue WA, LLC | Allison Rothstein
Owner’s Rep. Info/Contact Barghausen Consulting Engineers, Inc. | Tom Barghausen, P.E.
General Contractor Info/Contact Van Hoof Construction, LLC
Reviewed By LAC
Initials/Date
KDH
Initials/Date Field Supervisor Project Manager
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for
obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible
for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations,
is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
As requested by the client, ESNW rep was on site to observe the installation of the imported organic soil.
While on site, the following was observed:
Imported Organic Soil Installation:
Upon arrival on site, ESNW rep observed the general contractor installing an approximately two-foot-
thick lift of imported organic soil. The general contractor used a dozer and vibratory drum roller to grade
and compact the imported organic soil to the specified two-foot thickness. This layer is to serve as a
treatment layer underneath the roadway infiltration system (permeable asphalt). Please see attached
pictures and map.
ESNW rep will return when requested next by the client.
2 foot lift of black
imported organic soil
Report ID 7334.06 E 01262023 Page 2 of 2
Earth Solutions NW, LLC