Loading...
HomeMy WebLinkAboutRock Layer 1.27.2023.pdfEarth Solutions NWLLC 15365 NE 90th Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 | Fax (425) 449-4711 esnw.com FIELD REPORT Project No. 7334.06 Page 1 of 2 Report ID 7334.06 E 01272023 Date Fri 1/27/2023 Weather 46F Cloudy Arrival/Departure Time(s) 11:30AM – 2:00PM Travel Time (hr)1.0 Project Name Brennon Landing Location 1400 Aberdeen Ave NE, Renton ESNW Rep. & Phone Nathan Dalton | 206.355.9308 Owner Info/Contact MainVue WA, LLC | Allison Rothstein Owner’s Rep. Info/Contact Barghausen Consulting Engineers, Inc. | Tom Barghausen, P.E. General Contractor Info/Contact Van Hoof Construction, LLC Reviewed By LAC Initials/Date KDH Initials/Date Field Supervisor Project Manager Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager. As requested by the client, ESNW rep was on site to observe the installation of the 5/8-inch washed rock on Road A subgrade. While on site, the following was observed: 5/8th Washed Rock Installation: Upon arrival on site, ESNW rep observed the general contractor installing an approximately one-foot- thick lift of 5/8-inch washed rock in the subgrade of Road A. This is placed directly over top the approximately two-foot-thick layer of imported organic soil. Both layers were installed per the approved plans as part of the Road A permeable pavement system. The general contractor was using a dozer and vibratory drum roller to grade and compact the 5/8-inch washed rock into place. Please see attached pictures and map. ESNW rep will return when requested next by the client. 5/8th washed rock installation area. Report ID 7334.06 E 01272023 Page 2 of 2 Earth Solutions NW, LLC