FIELD REPORT
Project No. 7334.06 Page 1 of 1 Report ID 7334.06 E 01252023
Date Wed 1/25/2023 Weather Mostly Cloudy 43°F
Arrival/Departure Time(s) 1:00 PM – 1:30 PM Travel Time (hr)0.75
Project Name Brennon Landing
Location 1400 Aberdeen Ave NE, Renton
ESNW Rep. & Phone Maricel Fee (425) 984-9615
Owner Info/Contact MainVue WA, LLC | Allison Rothstein
Owner’s Rep. Info/Contact Barghausen Consulting Engineers, Inc. | Tom Barghausen, P.E.
General Contractor Info/Contact
Permit No(s).
Reviewed By LAC
Initials/Date
KDH
Initials/Date Field Supervisor Project Manager
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s
observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
As requested by the client, ESNW rep was on site to observe installment of organic soil liner. While on
site, the following was observed:
Organic Soil Liner Observations:
Upon arrival, ESNW rep observed contractor begin grading organic soil liner along Road A. Contractor
plans on placing 24 inches of organic soil and then adding 12 inches of 5/8-inch washed rock above it.
Installation of road subgrade will continue tomorrow, January 26.
ESNW rep will return upon request.