Loading...
HomeMy WebLinkAbout20053 C2.0 TESC - approvedXXXX XXXTBDTBD TBD TBD CONSTRUCTION SEQUENCE 1.CONTRACTOR TO ARRANGE AND ATTEND A PRE-CONSTRUCTION CONFERENCE WITH THE CITY OF RENTON PRIOR TO BEGINNING SITEWORK. 2.IDENTIFY AND MARK LIMITS OF CLEARING. 3.A COPY OF THE APPROVED TESC/SWPP PLAN IS TO BE KEPT ONSITE AT ALL TIMES DURING CONSTRUCTION. 4.INSTALL TEMPORARY ROCK CONSTRUCTION ENTRANCE, FILTER FABRIC FENCES, AND CATCH BASIN INSERTS AS REQUIRED. 5.A MINIMUM OF ONE SET OF APPROVED CONSTRUCTION DRAWINGS AND A COPY OF THE CITY OF RENTON DESIGN AND CONSTRUCTION STANDARDS SHALL BE MAINTAINED IN GOOD (LEGIBLE) CONDITION ONSITE AT ALL TIMES. 6.BEGIN SITE GRADING AND UTILITY INSTALLATION GRADE AND PAVE ACCESS DRIVEWAY. 7.CONSTRUCT FRONTAGE IMPROVEMENTS 8.A TRAFFIC CONTROL PLAN IS TO BE SUBMITTED BY THE CONTRACTOR TO THE CITY OF RENTON AND APPROVED BY THE CITY PRIOR TO ANY SITE RELATED ACTIVITIES (INCLUDING OFFSITE UTILITY CONNECTIONS) THAT REQUIRE ROAD CLOSURE OR DISRUPTION OF ACCESS TO NEARBY BUSINESSES THAT WILL LAST MORE THAN 15 MINUTES. 9.MAINTAIN TESC FACILITIES IN PROPER OPERATING CONDITION DURING ALL PHASES OF CONSTRUCTION. RELOCATE TESC FACILITIES AS NEEDED AS CONSTRUCTION PROGRESSES. 10.COORDINATE UTILITY CONSTRUCTION AND CONNECTIONS WITH UTILITY PROVIDERS. 11.COMPLETE ONSITE, OFFSITE AND BUILDING CONSTRUCTION AND OBTAIN CIYT/UTILITY PROVIDER APPROVAL. INSTALL LANDSCAPING IN CONFORMANCE WITH LANDSCAPE PLANS. STABILIZE ALL EXPOSED AREAS. 12.REMOVE REMAINING TESC MEASURES AS DIRECTED BY THE CITY OF RENTON INSPECTOR AFTER CITY APPROVAL. SEPTIC SYSTEM ABANDONMENT NOTES: 1.CONTRACTOR SHALL PREPARE A SEATTLE AND KING COUNTY PUBLIC HEALTH "REPORT OF WASTE WATER TANK ABANDONMENT" APPLICATION AND RETURN COMPLETED FORM TO PUBLIC HEALTH – SEATTLE & KING COUNTY, ENVIRONMENTAL HEALTH DIVISION, 14350 SE EASTGATE WAY,BELLEVUE, WA, 98007, TEL. (206) 296-4932. 2.PRIOR TO ABANDONMENT THE SEPTIC TANK AND ALL SEWAGE EFFLUENT IN DRAIN FIELD MUST BE PUMPED AND DISPOSED OF BY A WASHINGTON STATE CERTIFIED LIQUID WASTE PUMPER HAULER TO AN APPROVED DISPOSAL FACILITY. 3.THE SEPTIC TANK AND DISTRIBUTION STRUCTURES MUST BE REMOVED AND DISPOSED OF PROPERLY. 4.PRIOR TO REMOVAL OF ANY TYPE OF “DRAINFIELD,” THE SYSTEM MUST BE ALLOWED A DRYING OUT PERIOD OF SIXTY (60) DAYS OR LONGER BEFORE REMOVAL TO ENSURE THAT NO LIQUID SEWAGE EFFLUENT IS PRESENT. THIS WILL MINIMIZE THE POTENTIAL FOR DIRECT HUMAN CONTACT WITH ANY SEWAGE AND HELP PREVENT SPILLS OR LEAKAGE ON BOTH PRIVATE PROPERTY AND PUBLIC ROADWAYS. 5.THE GEO-TEXTILE FABRIC AND DISTRIBUTION PIPING OR SYNTHETIC MEDIA MUST BE REMOVED, DRIED AND DISPOSED OF AT A PERMITTED SANITARY LANDFILL AS MUNICIPAL SOLID WASTE. THIS MATERIAL MUST NOT BE MIXED WITH THE SOIL IF THE SOIL IS TO BE REUSED OR SPREAD. 6.THE DISTRIBUTION MEDIA, IF ROCK, MUST BE HAULED OFF SITE FOR BURIAL OR STOCKPILING IN A REMOTE LOCATION TO MINIMIZE HUMAN EXPOSURE TO POTENTIAL PATHOGENS AND ALLOW FOR PATHOGEN DIE-OFF. 7.BACKFILL WITH CLEAN GRAVEL OR FILL SOIL. N SILT FENCE ASPHALT/CONCRETE TO BE REMOVED CONSTRUCTION ACCESS LIMITS OF CLEARING AND GRADING INLET PROTECTION LEGEND STOCKPILE AREA SAWCUT/LIMITS OF GRIND EXISTING SURVEYED TREES TO REMAIN EXISTING TREE TO BE REMOVED TREE PROTECTION FENCING CONSTRUCTION NOTES UTILIZE EXISTING DRIVEWAY DURING INITIAL PHASE OF MOBILIZATION AND SITE PREPARATION AND DEMOLITION. EXISTING DRIVEWAY TO BE REMOVED. STABILIZED CONSTRUCTION ENTRANCE PER DETAIL ON SHEET C2.1 SAWCUT FULL DEPTH FILTER FABRIC (SILT) FENCE PER DETAIL ON SHEET C2.1 STORM INLET PROTECTION PER DETAIL ON SHEET C2.1 PLASTIC COVERED STOCKPILE PER DETAIL ON SHEET C2.1 REMOVE EXISTING STRUCTURES REMOVE EXISTING FENCES, WALLS, RR TIES, AND TANK REMOVE ON-SITE PAVING SEPTIC TANK AND DRAINFIELD. SEE REMOVAL NOTES NOT USED 6' HIGH CHAIN LINK TREE PROTECTION FENCING 1 2 3 4 5 6 7 8 9 10 11 12 3 12 4 X 10 10 7 7 8 8 9 9 77 TO REMAIN EARTHWORK QUANTITIES CUT = 50 CY FILL = 50 CY NET = 0 CY FILL 7 IN COMPLIANCE WITH CITY OF RENTON STANDARDS SW 1/4 OF THE SE 1/4, SEC. 14, T 23N, R 05E, W.M. ph 206.890.8291 4715 142nd Pl. SW #B, Edmonds, WA 98026 3/23/2023RGG N A F U R SE FORP I ANO EL T S GE SI N ERE D EEATDSNTA WFO . SAHI IN REENOTR46937 AS SHOWN ROPPE SFR ROPPE SFR07-22-2020TED-40-4141A NEW HOUSE DESIGN DAF 6/22 DAF B REVISED SDMH IN ROW DAF 12/22 DAF C REVISED FRONTAGE PER CITY AGREEMENT WITH VICKI ROPPE DAF 03/23 DAF C2.0 3 9 TESC PLAN 5 5 6 9 8 TOPOGRAPHY, BOUNDARY, AND UTILITIES STATEMENT: FURR ENGINEERING SERVICES PLLC. DOES NOT WARRANT THE TOPOGRAPHY, BOUNDARY, AND/OR EXISTING UTILITIES SHOWN ON THESE PLANS. IT IS THE CONTRACTORS' RESPONSIBILITY TO HAVE ALL EXISTING IMPROVEMENTS FIELD VERIFIED PRIOR TO CONSTRUCTION. ANY SUBSURFACE EXPLORATION OF EXISTING UNDERGROUND UTILITIES (POWER, WATER, SEWER, TELECOM, ETC.) SHALL BE PERFORMED BY THE CONTRACTOR. DISCREPANCIES BETWEEN WHAT IS SHOWN ON THE PLANS AND LOCATED BY THE CONTRACTOR SHALL BE BROUGHT TO THE ATTENTION OF FURR ENGINEERING SERVICES PLLC.. PRIOR TO CONSTRUCTION ACTIVITIES. Know what's below. before you dig.Call R 5 R-414103 12 TYP DRIPLINES SHOWN ARE APPROXIMATE FROM KING COUNTY I-MAP AERIAL PHOTO PR18000599C2000331612 DEVELOPMENT ENGINEERING NJanders 03/23/2023