HomeMy WebLinkAboutRE_ Electrical Vault in Conflict With Gas Line at Duvall and 12thGood morning Kyle,
The City’s preference is Option A as it maximizes the conduit run. Please retain this email as the acceptance of the change. No formal design change is needed but will need to be reflected
on the as-builts.
Thank you,
MICHAEL S. SIPPO, Civil Engineer III
City of Renton | CED | Development Engineering Division
1055 S Grady Way | 6th Floor | Renton, WA 98057
Virtual Permit Center <https://rentonwa.gov/cms/One.aspx?portalId=7922741&pageId=17625638> | Online Applications and Inspections <https://permitting.rentonwa.gov/#/home>
(425) 430-7298| msippo@rentonwa.gov <mailto:msippo@rentonwa.gov>
From: Kyle Cundy <kylec@cornerstonegci.com>
Sent: Friday, March 24, 2023 8:53 AM
To: Michael Sippo <MSippo@Rentonwa.gov>; Eric Cutshall <ECutshall@Rentonwa.gov>
Cc: Gerard Boulanger <gerardb@cornerstonegci.com>; Mitchell Pratt <mitchellp@cornerstonegci.com>; Ingrida Sanders <isanders@hoarch.com>; Jeremiah Tovrea <jeremiah@sareelectric.com>;
Garrett Gunsauls <Garrett@ggearthworks.com>; Joel Mccann <JMccann@Rentonwa.gov>; Katie Pond <kpond@hoarch.com>
Subject: RE: Electrical Vault in Conflict With Gas Line at Duvall and 12th
CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless you know the content is safe.
Hi Mike,
See attached for the two vault location options. There is a 3’ wide planter between the curb and sidewalk at this location and there is an existing (Reed Installed) vault that is in
line with the landing at the top of the ramp. We would prefer to use option A and install the new vault to the north of the existing vault. Please let us know if one of these location
is acceptable.
Thanks,
From: Michael Sippo <MSippo@Rentonwa.gov <mailto:MSippo@Rentonwa.gov> >
Sent: Thursday, March 23, 2023 4:05 PM
To: Eric Cutshall <ECutshall@Rentonwa.gov <mailto:ECutshall@Rentonwa.gov> >; Kyle Cundy <kylec@cornerstonegci.com <mailto:kylec@cornerstonegci.com> >
Cc: Gerard Boulanger <gerardb@cornerstonegci.com <mailto:gerardb@cornerstonegci.com> >; Mitchell Pratt <mitchellp@cornerstonegci.com <mailto:mitchellp@cornerstonegci.com> >; Ingrida
Sanders <isanders@hoarch.com <mailto:isanders@hoarch.com> >; Jeremiah Tovrea <jeremiah@sareelectric.com <mailto:jeremiah@sareelectric.com> >; Garrett Gunsauls <Garrett@ggearthworks.com
<mailto:Garrett@ggearthworks.com> >; Joel Mccann <JMccann@Rentonwa.gov <mailto:JMccann@Rentonwa.gov> >; Katie Pond <kpond@hoarch.com <mailto:kpond@hoarch.com> >
Subject: RE: Electrical Vault in Conflict With Gas Line at Duvall and 12th
Good afternoon Kyle,
Is there space available to move it into the sidewalk on Duvall, south of the ada ramp and landing (rough screenshot below)? If you think that would work please send a quick drawing
of the location for approval. Thank you,
MICHAEL S. SIPPO, Civil Engineer III
City of Renton | CED | Development Engineering Division
1055 S Grady Way | 6th Floor | Renton, WA 98057
Virtual Permit Center <https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Frentonwa.gov%2Fcms%2FOne.aspx%3FportalId%3D7922741%26pageId%3D17625638&data=05%7C01%7CMSippo%40Rentonwa.gov%7C
f2fbcf59a40b47d195af08db2c7fe2a0%7C71014141061148858e98cc96a05e1675%7C1%7C0%7C638152700789632476%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7
C%7C&sdata=%2FeORHI76boUw8OwC0t%2BfHomExifwRHQaBUPNmTidcuc%3D&reserved=0> | Online Applications and Inspections <https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fpermitting.rentonwa
.gov%2F%23%2Fhome&data=05%7C01%7CMSippo%40Rentonwa.gov%7Cf2fbcf59a40b47d195af08db2c7fe2a0%7C71014141061148858e98cc96a05e1675%7C1%7C0%7C638152700789632476%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiL
CJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=fHGlGK5pY36B8IqPaG%2FH%2BXe5camzEamb1XZp7QyZb8U%3D&reserved=0>
(425) 430-7298| msippo@rentonwa.gov <mailto:msippo@rentonwa.gov>
From: Eric Cutshall <ECutshall@Rentonwa.gov <mailto:ECutshall@Rentonwa.gov> >
Sent: Thursday, March 23, 2023 1:59 PM
To: Kyle Cundy <kylec@cornerstonegci.com <mailto:kylec@cornerstonegci.com> >; Michael Sippo <MSippo@Rentonwa.gov <mailto:MSippo@Rentonwa.gov> >
Cc: Gerard Boulanger <gerardb@cornerstonegci.com <mailto:gerardb@cornerstonegci.com> >; Mitchell Pratt <mitchellp@cornerstonegci.com <mailto:mitchellp@cornerstonegci.com> >; Ingrida
Sanders <isanders@hoarch.com <mailto:isanders@hoarch.com> >; Jeremiah Tovrea <jeremiah@sareelectric.com <mailto:jeremiah@sareelectric.com> >; Garrett Gunsauls <Garrett@ggearthworks.com
<mailto:Garrett@ggearthworks.com> >; Joel Mccann <JMccann@Rentonwa.gov <mailto:JMccann@Rentonwa.gov> >; Katie Pond <kpond@hoarch.com <mailto:kpond@hoarch.com> >
Subject: RE: Electrical Vault in Conflict With Gas Line at Duvall and 12th
Mike and I spoke about this. We are going to have you move the vault to the South. Mike should be sending you a mark up drawing soon.
From: Kyle Cundy <kylec@cornerstonegci.com <mailto:kylec@cornerstonegci.com> >
Sent: Thursday, March 23, 2023 11:22 AM
To: Eric Cutshall <ECutshall@Rentonwa.gov <mailto:ECutshall@Rentonwa.gov> >; Michael Sippo <MSippo@Rentonwa.gov <mailto:MSippo@Rentonwa.gov> >
Cc: Gerard Boulanger <gerardb@cornerstonegci.com <mailto:gerardb@cornerstonegci.com> >; Mitchell Pratt <mitchellp@cornerstonegci.com <mailto:mitchellp@cornerstonegci.com> >; Ingrida
Sanders <isanders@hoarch.com <mailto:isanders@hoarch.com> >; Jeremiah Tovrea <jeremiah@sareelectric.com <mailto:jeremiah@sareelectric.com> >; Garrett Gunsauls <Garrett@ggearthworks.com
<mailto:Garrett@ggearthworks.com> >; Joel Mccann <JMccann@Rentonwa.gov <mailto:JMccann@Rentonwa.gov> >; Katie Pond <kpond@hoarch.com <mailto:kpond@hoarch.com> >
Subject: RE: Electrical Vault in Conflict With Gas Line at Duvall and 12th
CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless you know the content is safe.
Eric/Mike,
Have you had a chance to take a look at this? Would it be best to meet onsite?
Thanks,
From: Kyle Cundy
Sent: Wednesday, March 22, 2023 11:13 AM
To: Eric Cutshall <ECutshall@Rentonwa.gov <mailto:ECutshall@Rentonwa.gov> >; Michael Sippo <MSippo@Rentonwa.gov <mailto:MSippo@Rentonwa.gov> >
Cc: Gerard Boulanger <GerardB@cornerstonegci.com <mailto:GerardB@cornerstonegci.com> >; Mitchell Pratt <mitchellp@cornerstonegci.com <mailto:mitchellp@cornerstonegci.com> >; Ingrida
Sanders <isanders@hoarch.com <mailto:isanders@hoarch.com> >; Jeremiah Tovrea <jeremiah@sareelectric.com <mailto:jeremiah@sareelectric.com> >; Garrett Gunsauls <Garrett@ggearthworks.com
<mailto:Garrett@ggearthworks.com> >; Joel Mccann <JMccann@Rentonwa.gov <mailto:JMccann@Rentonwa.gov> >; Katie Pond <kpond@hoarch.com <mailto:kpond@hoarch.com> >
Subject: RE: Electrical Vault in Conflict With Gas Line at Duvall and 12th
Importance: High
Eric/Mike,
There is no room to install the vault between the curb and the rockery due to the existing gas line, see attached photo. PSE said it could not be installed over top of their line.
Please advise where we should install this vault.
Thanks,
From: Eric Cutshall <ECutshall@Rentonwa.gov <mailto:ECutshall@Rentonwa.gov> >
Sent: Thursday, February 23, 2023 7:01 AM
To: Kyle Cundy <kylec@cornerstonegci.com <mailto:kylec@cornerstonegci.com> >; Michael Sippo <MSippo@Rentonwa.gov <mailto:MSippo@Rentonwa.gov> >
Cc: Gerard Boulanger <gerardb@cornerstonegci.com <mailto:gerardb@cornerstonegci.com> >; Mitchell Pratt <mitchellp@cornerstonegci.com <mailto:mitchellp@cornerstonegci.com> >; Ingrida
Sanders <isanders@hoarch.com <mailto:isanders@hoarch.com> >; Jeremiah Tovrea <jeremiah@sareelectric.com <mailto:jeremiah@sareelectric.com> >; Garrett Gunsauls <Garrett@ggearthworks.com
<mailto:Garrett@ggearthworks.com> >; Joel Mccann <JMccann@Rentonwa.gov <mailto:JMccann@Rentonwa.gov> >
Subject: RE: Electrical Vault in Conflict With Gas Line at Duvall and 12th
Please see attachment.
From: Kyle Cundy <kylec@cornerstonegci.com <mailto:kylec@cornerstonegci.com> >
Sent: Wednesday, February 22, 2023 12:26 PM
To: Eric Cutshall <ECutshall@Rentonwa.gov <mailto:ECutshall@Rentonwa.gov> >; Michael Sippo <MSippo@Rentonwa.gov <mailto:MSippo@Rentonwa.gov> >
Cc: Gerard Boulanger <gerardb@cornerstonegci.com <mailto:gerardb@cornerstonegci.com> >; Mitchell Pratt <mitchellp@cornerstonegci.com <mailto:mitchellp@cornerstonegci.com> >; Ingrida
Sanders <isanders@hoarch.com <mailto:isanders@hoarch.com> >; Jeremiah Tovrea <jeremiah@sareelectric.com <mailto:jeremiah@sareelectric.com> >; Garrett Gunsauls <Garrett@ggearthworks.com
<mailto:Garrett@ggearthworks.com> >; Joel Mccann <JMccann@Rentonwa.gov <mailto:JMccann@Rentonwa.gov> >
Subject: Electrical Vault in Conflict With Gas Line at Duvall and 12th
CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless you know the content is safe.
Eric/Mike,
We are getting a game plan to tackle the rest of the electrical work on the frontage and noticed that we may have a conflict with electrical vault on 12th being on top of the gas line,
see attached. There is very little room between the existing rockery and the road and the gas line appears to be centered in this space based off of locates. We have not pot holed
the gas line yet but I assume that we don’t want to put the vault on top of it. Any thoughts on what we should do here?
Thanks,
硞ס쁳܁毄༚�得�러统С⁈℉ไ爈㗆䛷യ綛�帧萣㤀薞∐촇茐₤Ⅽ醒ቀ衂䠜ठ병⁈℉ไ诔衍䗦蕯䈐胤ࡱ᥋Ꝋ邞ቀᤢ椅ℋፄ꿫⾛⛂⵰╤�⦔䱓껗굝峐굫᪵汞욊쵂℆梄쩢䅭ⷂ쭹뜭ᖘ塖뚞 긹成㺍꿰ⱨ逤ႄ戢监ꍦ熜몴�쵫잱欞濯旪䠭⻋겻篙뷯牍मད⁈℉фᏩ딯疂ą죑펔䒂ꔾ띭㛝婞똘辱Ҁ႒䑂뼬ഋ询�酄䲍ⴹὈ妁薥묡쌾䴖㲞帹䐣酶ቀ衂㐜གྷ犯掞컧�ᤍ缳糾뀛폭枳ᎊ⁈℉ไ䆚锠苓薄ꆈ☈䘬췦봳鞎좄
ሮ䉈鄈夃誐膃�碭慩훘箽䳷䰎䐬҈႒鲠闖劬腎潄ȵ䞱ᢌ邱굫裸蒖⒨䠒ࡂΑ�螊垕�⏈蛦減༰ᦠ栴戀돬곏ꦅב梧鐜孉℈돬髏圕템늬⫊髱ꏆ紸瓺䥫枢䉈Ꮤ䠒ࡂ萡Đ녲℉ႄт⁈℉ႄт⁈℉ႄт⁈℉ႄт⁈℉ႄт⁈℉ႄт⁈℉ႄт⁈℉ႄт⁈℉ႄт⁈℉ႄт⁈℉ႄт⁈℉ႄт⁈℉ႄт⁈℉ႄт⁈℉ႄт⁈℉ႄт⁈℉ႄт⁈℉ႄт⁈℉ႄт⁈℉ႄт⁈℉ႄт⁈℉ႄт⁈℉ႄт⁈℉ႄт⁈℉ႄт⁈℉ႄт⁈℉ႄт⁈℉ႄт⁈℉ႄт⁈℉ႄт⁈℉
ႄт⁈℉ႄт⁈℉ႄт⁈℉ႄт⁈℉ႄт⁈℉ႄт⁈℉ႄт⁈℉ႄт⁈℉ႄт⁈℉ႄт⁈℉ႄт⁈℉ႄт⁈℉ႄт⁈℉ႄт⁈℉ႄт⁈℉ႄ둂飃߿焉컖湓