Loading...
HomeMy WebLinkAboutC6.5_ FRONTAGE DRIVEWAY AND RAMP DETAILS Rev.6 (2)PARCEL B-1 OF LOT 71932 First AveSuite 201Seattle, WA 98101p. 206.725.1211f. 206.973.5344www.lpdengineering.comengineering pllcIN COMPLIANCE WITH CITY OF RENTON STANDARDS1932 First AveSuite 201Seattle, WA 98101p. 206.725.1211f. 206.973.5344www.lpdengineering.comengineering pllcTED-40-4192 LUA:21-000167PR:20-000097C:21-004289R-41924010 LAKE WASHINGTON BLVD NESUITE 320KIRKLAND, WA 98033425.828.8948HOARCH.COMPROJECT INFORMATIONCONSULTANT STAMPARCHITECT STAMPSCHOOL DISTRICT LOGOPROJECT NUMBER:SHEET NAMESHEET NUMBER1HZ(OHPHQWDU\1R.1075 Duvall Avenue NERenton, WA 98059R(17O16CHOO/',67R,C71O.11.4.2020SCHEMATIC DESIGN1.21.202150% DESIGN DEVELOPMENT3.26.2021100% DESIGN DEVELOPMENT8.27.2021PERMIT SUBMITTAL11.12.202175% CONTRACT DOCUMENTS12.3.202190% CONTRACT DOCUMENTS12.20.2021PERMIT RESUBMITTAL1.20.2022BP-06.11.24.2022BID SET2.17.2022ADDENDUM NO.32.24.2022ADDENDUM NO.43.4.2022CONFORMED SET5.26.2022PERMIT RESUBMITTALCO1)ORM('6(73.4.20222014PR114502.21.2023RFI-40202.15.2023RFI-401C.)RO17A*('R,9(:A<A1'RAM3'(7A,/6Know what's below.Call before you dig.Dial 811%/O:83'(7A,/'(A1')