1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
332
333
334
335
336
337
338
339
340
341
342
343
344
345
346
347
348
349
350
351
352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
369
370
371
372
373
374
375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
390
391
392
393
394
395
396
397
398
399
400
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449
450
451
452
453
454
455
456
457
458
459
460
461
462
463
464
465
466
467
468
469
470
471
472
473
474
475
476
477
478
479
480
481
482
483
484
485
486
487
488
489
490
491
492
493
494
495
496
497
498
499
500
501
502
503
504
505
506
507
508
509
510
511
512
513
514
515
516
517
518
519
520
521
522
523
524
525
526
527
528
529
530
531
532
533
534
535
536
537
538
539
540
541
542
543
544
545
546
547
548
549
550
551
552
553
554
555
556
557
558
559
560
561
562
563
564
565
566
567
568
569
570
571
572
573
574
575
576
577
578
579
580
581
582
583
584
585
586
587
588
589
590
591
592
593
594
595
596
597
598
599
600
601
602
603
604
605
606
607
608
609
610
611
612
613
614
615
616
617
618
619
620
621
622
623
624
625
626
627
628
629
630
631
632
633
634
635
636
637
638
639
640
641
642
643
644
645
646
647
648
649
650
651
652
653
654
655
656
657
658
659
660
661
662
663
664
665
666
667
668
669
670
671
672
673
674
675
676
677
678
679
680
681
682
683
684
685
686
687
688
689
690
691
692
693
694
695
696
697
698
699
700
701
702
703
704
705
706
707
708
709
710
711
712
713
714
715
716
717
718
719
720
721
722
723
724
725
726
727
728
729
730
731
732
733
734
735
736
737
738
739
740
741
742
743
744
745
746
747
748
749
750
751
752
753
754
755
756
757
758
759
760
761
762
763
764
765
766
767
768
769
770
771
772
773
774
775
776
777
778
779
780
781
782
783
784
785
786
787
788
789
790
791
792
793
794
795
796
797
798
799
800
801
802
803
804
805
806
807
808
809
810
811
812
813
814
815
816
817
818
819
820
821
822
823
824
825
826
827
828
829
830
831
832
833
834
835
836
837
838
839
840
841
842
843
844
845
846
847
848
849
850
851
852
853
854
855
856
857
858
859
860
861
862
863
864
865
866
867
868
869
870
871
872
873
874
875
876
877
878
879
880
881
882
883
884
885
886
887
888
889
890
891
892
893
894
895
896
897
898
899
900
901
902
903
904
905
906
907
908
909
910
911
912
913
914
915
916
917
918
919
920
921
922
923
924
925
926
927
928
929
930
931
932
933
934
935
936
937
938
939
940
941
942
943
944
945
946
947
948
949
950
951
952
953
954
955
956
957
958
959
960
961
962
963
964
965
966
967
968
969
970
971
972
973
974
975
976
977
978
979
980
981
982
983
984
985
986
987
988
989
990
991
992
993
994
995
996
997
998
999
1000
1001
1002
1003
1004
1005
1006
1007
1008
/ 1008
HomeMy WebLinkAboutRe-Notice_Southport_Mailer_221005DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 723059001 LUA22-000284 Current Resident 1060 Nishiwaki Ln Renton WA 98057 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information R eport, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT A101 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT A102 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigati on Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT A103 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT A104 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT A105 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT A106 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT A107 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT A109 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT A110 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT A201 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT A203 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT A204 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT A205 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT A206 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT A207 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT A208 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT A209 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT A210 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT A301 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT A302 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT A303 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT A304 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT A305 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Enviro nmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT A306 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT A307 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT A308 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT A309 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT A310 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT A401 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT A402 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT A403 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT A404 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT A405 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT A406 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT A407 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT A408 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT A409 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT A410 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT B101 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT B102 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT B103 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT B104 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT B105 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT B106 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT B107 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT B108 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT B109 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Enviro nmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT B110 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT B201 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT B202 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT B203 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT B204 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT B205 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT B207 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT B208 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT B209 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT B301 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT B302 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT B303 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT B304 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT B305 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT B306 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT B307 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT B308 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT B309 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT B401 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT B402 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT B403 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT B404 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT B406 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT B407 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Enviro nmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT B408 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT B409 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT B410 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT C101 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT C102 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT C103 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT C104 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT C105 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT C106 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT C107 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT C108 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT C109 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT C110 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT C111 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT C201 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT C202 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT C203 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT C204 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT C205 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT C206 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT C207 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT C208 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT C209 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT C211 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Enviro nmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT C302 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT C303 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT C304 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT C305 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT C306 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT C307 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT C308 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT C309 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT C310 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT C311 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT C401 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT C402 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT C403 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT C404 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT C405 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT C406 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT C407 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT C408 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT C409 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT C410 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT C411 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT D101 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT D102 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT D103 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Enviro nmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT D104 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT D105 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT D106 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT D107 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT D108 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT D109 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT D110 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT D111 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT D112 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT D114 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT D201 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT D203 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT D204 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT D205 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT D206 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT D207 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT D209 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT D211 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT D212 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT D213 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT D214 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT D215 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT D301 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT D302 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Enviro nmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT D303 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT D304 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT D306 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT D307 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT D308 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT D309 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT D310 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT D311 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT D312 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT D313 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT D314 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT D315 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT D316 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT D401 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT D402 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT D403 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT D404 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT D405 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT D406 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT D408 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT D409 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT D410 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT D411 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT D412 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Enviro nmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT D413 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT D414 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N APT D415 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N Suite 50 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1083 Lake Washington Blvd N UNIT 30 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1085 Lake Washington Blvd N APT C101 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1085 Lake Washington Blvd N APT C102 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1085 Lake Washington Blvd N APT C103 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1085 Lake Washington Blvd N APT C104 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1085 Lake Washington Blvd N APT C105 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1085 Lake Washington Blvd N APT C106 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1085 Lake Washington Blvd N APT C107 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1085 Lake Washington Blvd N APT C108 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1085 Lake Washington Blvd N APT C109 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1085 Lake Washington Blvd N APT C110 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1085 Lake Washington Blvd N APT C111 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1085 Lake Washington Blvd N APT C201 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1085 Lake Washington Blvd N APT C202 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1085 Lake Washington Blvd N APT C203 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1085 Lake Washington Blvd N APT C204 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1085 Lake Washington Blvd N APT C205 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1085 Lake Washington Blvd N APT C206 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1085 Lake Washington Blvd N APT C207 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1085 Lake Washington Blvd N APT C208 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Enviro nmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1085 Lake Washington Blvd N APT C209 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1085 Lake Washington Blvd N APT C211 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1085 Lake Washington Blvd N APT C302 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1085 Lake Washington Blvd N APT C303 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1085 Lake Washington Blvd N APT C304 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1085 Lake Washington Blvd N APT C305 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1085 Lake Washington Blvd N APT C306 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1085 Lake Washington Blvd N APT C307 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1085 Lake Washington Blvd N APT C308 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1085 Lake Washington Blvd N APT C309 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1085 Lake Washington Blvd N APT C310 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1085 Lake Washington Blvd N APT C311 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1085 Lake Washington Blvd N APT C401 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1085 Lake Washington Blvd N APT C402 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1085 Lake Washington Blvd N APT C403 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1085 Lake Washington Blvd N APT C404 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1085 Lake Washington Blvd N APT C405 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1085 Lake Washington Blvd N APT C406 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1085 Lake Washington Blvd N APT C408 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1085 Lake Washington Blvd N APT C409 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1085 Lake Washington Blvd N APT C410 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1085 Lake Washington Blvd N APT C411 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1087 Lake Washington Blvd N APT B102 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1087 Lake Washington Blvd N APT B103 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Enviro nmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1087 Lake Washington Blvd N APT B104 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1087 Lake Washington Blvd N APT B105 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1087 Lake Washington Blvd N APT B106 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1087 Lake Washington Blvd N APT B107 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1087 Lake Washington Blvd N APT B108 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1087 Lake Washington Blvd N APT B109 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1087 Lake Washington Blvd N APT B110 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1087 Lake Washington Blvd N APT B201 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1087 Lake Washington Blvd N APT B202 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1087 Lake Washington Blvd N APT B203 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1087 Lake Washington Blvd N APT B205 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1087 Lake Washington Blvd N APT B207 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1087 Lake Washington Blvd N APT B208 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1087 Lake Washington Blvd N APT B209 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1087 Lake Washington Blvd N APT B301 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1087 Lake Washington Blvd N APT B302 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1087 Lake Washington Blvd N APT B303 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1087 Lake Washington Blvd N APT B304 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1087 Lake Washington Blvd N APT B305 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1087 Lake Washington Blvd N APT B306 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1087 Lake Washington Blvd N APT B307 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1087 Lake Washington Blvd N APT B308 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1087 Lake Washington Blvd N APT B309 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1087 Lake Washington Blvd N APT B401 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Enviro nmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1087 Lake Washington Blvd N APT B402 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1087 Lake Washington Blvd N APT B403 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1087 Lake Washington Blvd N APT B404 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1087 Lake Washington Blvd N APT B406 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1087 Lake Washington Blvd N APT B407 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1087 Lake Washington Blvd N APT B408 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1087 Lake Washington Blvd N APT B409 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1087 Lake Washington Blvd N APT B410 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1089 Lake Washington Blvd N Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1089 Lake Washington Blvd N APT A101 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1089 Lake Washington Blvd N APT A102 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1089 Lake Washington Blvd N APT A103 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1089 Lake Washington Blvd N APT A104 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1089 Lake Washington Blvd N APT A105 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1089 Lake Washington Blvd N APT A106 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1089 Lake Washington Blvd N APT A107 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1089 Lake Washington Blvd N APT A109 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1089 Lake Washington Blvd N APT A110 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1089 Lake Washington Blvd N APT A201 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1089 Lake Washington Blvd N APT A203 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1089 Lake Washington Blvd N APT A204 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1089 Lake Washington Blvd N APT A205 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1089 Lake Washington Blvd N APT A206 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1089 Lake Washington Blvd N APT A207 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Enviro nmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1089 Lake Washington Blvd N APT A208 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1089 Lake Washington Blvd N APT A209 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1089 Lake Washington Blvd N APT A210 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1089 Lake Washington Blvd N APT A301 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1089 Lake Washington Blvd N APT A302 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1089 Lake Washington Blvd N APT A303 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1089 Lake Washington Blvd N APT A304 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1089 Lake Washington Blvd N APT A306 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1089 Lake Washington Blvd N APT A307 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1089 Lake Washington Blvd N APT A308 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1089 Lake Washington Blvd N APT A309 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1089 Lake Washington Blvd N APT A310 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1089 Lake Washington Blvd N APT A401 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1089 Lake Washington Blvd N APT A402 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1089 Lake Washington Blvd N APT A403 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1089 Lake Washington Blvd N APT A404 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1089 Lake Washington Blvd N APT A405 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1089 Lake Washington Blvd N APT A406 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1089 Lake Washington Blvd N APT A407 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1089 Lake Washington Blvd N APT A408 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1089 Lake Washington Blvd N APT A409 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 Current Resident 1089 Lake Washington Blvd N APT A410 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059178 LUA22-000284 PUGET SOUND ENERGY/ELEC 1095 LK WASHINGTON BLVD N RENTON WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059216 LUA22-000284 Current Resident 1101 Lake Washington Blvd N Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Enviro nmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059216 LUA22-000284 Current Resident 1103 Lake Washington Blvd N Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059216 LUA22-000284 Current Resident 1107 Lake Washington Blvd N Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059216 LUA22-000284 Current Resident 1111 Lake Washington Blvd N Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059216 LUA22-000284 Current Resident 1111 Lake Washington Blvd N Suite 420 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1131 Lake Washington Blvd N Apt E202 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1131 Lake Washington Blvd N Apt E205 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1131 Lake Washington Blvd N Apt E206 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1131 Lake Washington Blvd N Apt E207 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1131 Lake Washington Blvd N Apt E208 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1131 Lake Washington Blvd N Apt E209 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1131 Lake Washington Blvd N Apt E211 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1131 Lake Washington Blvd N Apt E213 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1131 Lake Washington Blvd N Apt E214 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1131 Lake Washington Blvd N Apt E215 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1131 Lake Washington Blvd N Apt E216 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1131 Lake Washington Blvd N Apt E217 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1131 Lake Washington Blvd N Apt E301 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1131 Lake Washington Blvd N Apt E302 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1131 Lake Washington Blvd N Apt E304 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1131 Lake Washington Blvd N Apt E305 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1131 Lake Washington Blvd N Apt E306 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1131 Lake Washington Blvd N Apt E307 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1131 Lake Washington Blvd N Apt E308 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1131 Lake Washington Blvd N Apt E309 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Enviro nmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1131 Lake Washington Blvd N Apt E310 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1131 Lake Washington Blvd N Apt E311 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1131 Lake Washington Blvd N Apt E312 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1131 Lake Washington Blvd N Apt E313 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1131 Lake Washington Blvd N Apt E314 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1131 Lake Washington Blvd N Apt E315 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1131 Lake Washington Blvd N Apt E316 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident PROPERTY TAX DEPT 1131 Lake Washington Blvd N Apt E402 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1131 Lake Washington Blvd N Apt E403 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1131 Lake Washington Blvd N Apt E405 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1131 Lake Washington Blvd N Apt E407 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1131 Lake Washington Blvd N Apt E408 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1131 Lake Washington Blvd N Apt E409 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1131 Lake Washington Blvd N Apt E410 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1131 Lake Washington Blvd N Apt E411 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1131 Lake Washington Blvd N Apt E412 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1131 Lake Washington Blvd N Apt E413 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1131 Lake Washington Blvd N Apt E414 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1131 Lake Washington Blvd N Apt E415 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1131 Lake Washington Blvd N Apt E416 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1131 Lake Washington Blvd N Apt E417 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1131 Lake Washington Blvd N Apt E502 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1131 Lake Washington Blvd N Apt E504 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1131 Lake Washington Blvd N Apt E505 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Enviro nmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1131 Lake Washington Blvd N Apt E506 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1131 Lake Washington Blvd N Apt E507 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1131 Lake Washington Blvd N Apt E508 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1131 Lake Washington Blvd N Apt E510 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1131 Lake Washington Blvd N Apt E511 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1131 Lake Washington Blvd N Apt E512 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1131 Lake Washington Blvd N Apt E513 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1131 Lake Washington Blvd N Apt E514 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1131 Lake Washington Blvd N Apt E515 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1131 Lake Washington Blvd N Apt E516 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1131 Lake Washington Blvd N UNIT E317 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1133 Lake Washington Blvd N Apt F201 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1133 Lake Washington Blvd N Apt F202 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1133 Lake Washington Blvd N Apt F203 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1133 Lake Washington Blvd N Apt F204 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1133 Lake Washington Blvd N Apt F205 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1133 Lake Washington Blvd N Apt F206 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1133 Lake Washington Blvd N Apt F208 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1133 Lake Washington Blvd N Apt F209 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1133 Lake Washington Blvd N Apt F210 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1133 Lake Washington Blvd N Apt F211 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1133 Lake Washington Blvd N Apt F213 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1133 Lake Washington Blvd N Apt F214 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1133 Lake Washington Blvd N Apt F215 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Enviro nmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1133 Lake Washington Blvd N Apt F301 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1133 Lake Washington Blvd N Apt F302 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1133 Lake Washington Blvd N Apt F303 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1133 Lake Washington Blvd N Apt F304 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1133 Lake Washington Blvd N Apt F305 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1133 Lake Washington Blvd N Apt F306 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1133 Lake Washington Blvd N Apt F307 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1133 Lake Washington Blvd N Apt F308 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1133 Lake Washington Blvd N Apt F309 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1133 Lake Washington Blvd N Apt F311 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1133 Lake Washington Blvd N Apt F312 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1133 Lake Washington Blvd N Apt F315 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1133 Lake Washington Blvd N Apt F401 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1133 Lake Washington Blvd N Apt F402 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1133 Lake Washington Blvd N Apt F403 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1133 Lake Washington Blvd N Apt F404 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1133 Lake Washington Blvd N Apt F405 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1133 Lake Washington Blvd N Apt F406 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1133 Lake Washington Blvd N Apt F407 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1133 Lake Washington Blvd N Apt F408 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1133 Lake Washington Blvd N Apt F409 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1133 Lake Washington Blvd N Apt F410 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1133 Lake Washington Blvd N Apt F411 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1133 Lake Washington Blvd N Apt F412 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Enviro nmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1133 Lake Washington Blvd N Apt F413 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1133 Lake Washington Blvd N Apt F414 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1133 Lake Washington Blvd N Apt F415 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1133 Lake Washington Blvd N Apt F501 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1133 Lake Washington Blvd N Apt F502 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1133 Lake Washington Blvd N Apt F503 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1133 Lake Washington Blvd N Apt F504 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1133 Lake Washington Blvd N Apt F505 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1133 Lake Washington Blvd N Apt F506 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1133 Lake Washington Blvd N Apt F507 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1133 Lake Washington Blvd N Apt F508 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1133 Lake Washington Blvd N Apt F509 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1133 Lake Washington Blvd N Apt F510 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1133 Lake Washington Blvd N Apt F511 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1133 Lake Washington Blvd N Apt F513 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1133 Lake Washington Blvd N Apt F514 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1133 Lake Washington Blvd N Apt F515 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1133 Lake Washington Blvd N Suite 83 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1133 Lake Washington Blvd N UNIT 80 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1133 Lake Washington Blvd N UNIT 90 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059191 LUA22-000284 SOUTHPORT WEST LLC 1133 LK WASH BLVD N #90 RENTON WA 98055 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1135 Lake Washington Blvd N Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1135 Lake Washington Blvd N Apt G201 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1135 Lake Washington Blvd N Apt G202 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Enviro nmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1135 Lake Washington Blvd N Apt G203 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1135 Lake Washington Blvd N Apt G205 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1135 Lake Washington Blvd N Apt G206 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1135 Lake Washington Blvd N Apt G207 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1135 Lake Washington Blvd N Apt G208 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1135 Lake Washington Blvd N Apt G209 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1135 Lake Washington Blvd N Apt G210 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1135 Lake Washington Blvd N Apt G211 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1135 Lake Washington Blvd N Apt G212 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1135 Lake Washington Blvd N Apt G213 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1135 Lake Washington Blvd N Apt G214 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1135 Lake Washington Blvd N Apt G215 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1135 Lake Washington Blvd N Apt G216 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1135 Lake Washington Blvd N Apt G217 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1135 Lake Washington Blvd N Apt G301 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1135 Lake Washington Blvd N Apt G302 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1135 Lake Washington Blvd N Apt G303 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1135 Lake Washington Blvd N Apt G304 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1135 Lake Washington Blvd N Apt G305 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1135 Lake Washington Blvd N Apt G306 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1135 Lake Washington Blvd N Apt G307 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1135 Lake Washington Blvd N Apt G308 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1135 Lake Washington Blvd N Apt G309 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1135 Lake Washington Blvd N Apt G310 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Enviro nmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1135 Lake Washington Blvd N Apt G311 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1135 Lake Washington Blvd N Apt G312 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1135 Lake Washington Blvd N Apt G313 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1135 Lake Washington Blvd N Apt G314 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1135 Lake Washington Blvd N Apt G315 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1135 Lake Washington Blvd N Apt G316 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1135 Lake Washington Blvd N Apt G317 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1135 Lake Washington Blvd N Apt G402 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1135 Lake Washington Blvd N Apt G403 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1135 Lake Washington Blvd N Apt G404 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1135 Lake Washington Blvd N Apt G405 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1135 Lake Washington Blvd N Apt G406 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1135 Lake Washington Blvd N Apt G408 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1135 Lake Washington Blvd N Apt G409 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1135 Lake Washington Blvd N Apt G410 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1135 Lake Washington Blvd N Apt G411 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1135 Lake Washington Blvd N Apt G412 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1135 Lake Washington Blvd N Apt G413 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1135 Lake Washington Blvd N Apt G414 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1135 Lake Washington Blvd N Apt G501 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1135 Lake Washington Blvd N Apt G503 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1135 Lake Washington Blvd N Apt G504 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1135 Lake Washington Blvd N Apt G505 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1135 Lake Washington Blvd N Apt G506 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Enviro nmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1135 Lake Washington Blvd N Apt G507 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1135 Lake Washington Blvd N Apt G508 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1135 Lake Washington Blvd N Apt G510 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1135 Lake Washington Blvd N Apt G511 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1135 Lake Washington Blvd N Apt G512 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1135 Lake Washington Blvd N Apt G513 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1135 Lake Washington Blvd N Apt G514 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1135 Lake Washington Blvd N Apt G515 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 Current Resident 1135 Lake Washington Blvd N Apt G517 Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 3344500775 LUA22-000284 Current Resident 1201 Lake Washington Blvd N Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 3344500775 LUA22-000284 Current Resident 1201 Lake Washington Blvd N UNIT A Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 3344500775 LUA22-000284 Current Resident 1201 Lake Washington Blvd N UNIT B Renton WA 98056 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 3344500006 LUA22-000284 M2 RENTON LLC 1503 LBJ FRWY # 300 DALLAS TX 75234 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059076 LUA22-000284 KW BRISTOL AT SOUTHPORT LLC 151 S EL CAMINO DRIVE BEVERLY HILLS CA 90212 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 886600010 LUA22-000284 CPT THE LANDING LLC 2415 E CAMELBACK RD #100 PHOENIX AZ 85016 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059055 LUA22-000284 JS LAND 2 LLC 6748 WING POINT RD NE BAINBRIDGE ISLAND WA 98110 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 886600010 LUA22-000284 Current Resident 720 N 10th St Renton WA 98057 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 886600010 LUA22-000284 Current Resident 720 N 10th St Suite A Renton WA 98057 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 886600010 LUA22-000284 Current Resident 720 N 10th St Suite B Renton WA 98057 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 723059001 LUA22-000284 Current Resident 737 Logan Ave N Renton WA 98057 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 886600010 LUA22-000284 Current Resident 800 N 10th Pl Renton WA 98057 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 886600010 LUA22-000284 Current Resident 800 N 10th Pl Suite A Renton WA 98057 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 886600010 LUA22-000284 Current Resident 800 N 10th Pl Suite E Renton WA 98057 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 886600010 LUA22-000284 Current Resident 822 N 10th Pl Suite C Renton WA 98057 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Enviro nmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 886600010 LUA22-000284 Current Resident 827 N 10th Pl Suite D Renton WA 98057 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 886600010 LUA22-000284 Current Resident 827 N 10th Pl Suite F Renton WA 98057 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 886600010 LUA22-000284 Current Resident 828 N 10th Pl Renton WA 98057 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 886600010 LUA22-000284 Current Resident 830 N 10th St Renton WA 98057 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 886600010 LUA22-000284 Current Resident 830 N 10th St Suite A Renton WA 98057 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 886600010 LUA22-000284 Current Resident 830 N 10th St Suite M Renton WA 98057 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 886600010 LUA22-000284 Current Resident 830 N 10th St Suite N Renton WA 98057 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 886600010 LUA22-000284 Current Resident 830 N 10th St Suite P Renton WA 98057 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 886600010 LUA22-000284 Current Resident 830 N 10th St Suite Q Renton WA 98057 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 886600010 LUA22-000284 Current Resident 840 N 10th Pl Suite A Renton WA 98057 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 886600010 LUA22-000284 Current Resident 900 N 10th Pl Renton WA 98057 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 886600010 LUA22-000284 Current Resident 910 N 10th Pl Renton WA 98057 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 886600010 LUA22-000284 Current Resident 910 N 10th Pl Suite A Renton WA 98057 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 886600010 LUA22-000284 Current Resident 910 N 10th Pl Suite B Renton WA 98057 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 886600010 LUA22-000284 Current Resident 910 N 10th Pl Suite C Renton WA 98057 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 886600010 LUA22-000284 Current Resident 911 N 10th Pl Renton WA 98057 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 886600010 LUA22-000284 Current Resident 911 N 10th Pl Suite B Renton WA 98057 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 886600010 LUA22-000284 Current Resident 911 N 10th Pl Suite C Renton WA 98057 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 886600010 LUA22-000284 Current Resident 916 N 10th Pl Renton WA 98057 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 886600010 LUA22-000284 Current Resident 920 N 10th St Suite A Renton WA 98057 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 886600010 LUA22-000284 Current Resident 920 N 10th St Suite R Renton WA 98057 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 886600060 LUA22-000284 BOEING COMPANY THE PO BOX 3707 M/C 20-59 SEATTLE WA 98124 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 523059003 LUA22-000284 BNSF PO BOX 961089 FORT WORTH TX 76161 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine-level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is 823059057 LUA22-000284 PUGET SOUND ENERGY/ELEC PO BOX 97034 BELLEVUE WA 98009 RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan with the application. DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Enviro nmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written com ments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov