Loading...
HomeMy WebLinkAboutERC_Committe_Determination_DNSMDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT ENVIRONMENTAL (SEPA) DETERMINATION OF NON-SIGNIFICANCE - MITIGATED (DNS-M) Project File Numbers: PR23-000050 /LUA23-000066, ECF, SA-A Project Name: LivAway Renton Hotel Development Applicant: Jenelle Taflin / 11235 SE 6th St, Suite 150, Bellevue, WA 98004 / jtaflin@navixeng.com Project Location: 7XX Park Ave N, Renton, WA 98057 (APN 0886610010) Project Description: The applicant is requesting Administrative Site Plan Review and Environmental (SEPA) Review approval to construct a four-story 126-guest room hotel and surface parking area near the intersection of Park Ave N and N 8th St (APN 0886610010). The proposed 59,711 square foot hotel is proposed along Park Ave N near the southeast corner of the 13.18-acre parcel. The project site received Master Plan approval for a phased development on August 19, 2019 and a minor modification approval on September 14, 2021 (LUA19 -000094). The first phase included development of a premier golf entertainment complex with up to 508 surface parking stalls. The second phase included Administrative Site Plan Review and Environmental (SEPA) Review approval for the construction of an approximately 7,000 square foot multi-tenant retail building at the northeast corner of property (LUA22-000291). The subject property is bound by Logan Ave N to the west, N 8th St to the north, Park Ave N to the east, and office buildings with a parking struct ure to the south. As part of the final phase, the hotel portion of the overall project site would total approximately 72,895 square feet (1.67 acres). The parcel is located within the Commercial Mixed Use (CMU) land use designation and the Urban Center- 2 (UC-2) zoning district. In addition, the property is in the Urban Design District ‘C’ overlay district, and therefore subject to additional design elements. A total of 104 parking stalls would be provided within the hotel portion of the site and additional surface parking would be available via a shared parking easement agreement with previous phases. Primary access to the hotel building is proposed from Park Ave N. Additional access is available from Logan Ave N through the constructed Topgolf development. The site is relatively flat and the soils consist of fill overlying alluvial deposits. According to City of Renton (COR) Maps, the site contains high seismic hazards and a portion of the site is located within the Downtown Wellhead Protection Area Zone 2. No wetlands or streams are located on the property. Lead Agency: Date of Decision: City of Renton Environmental Review Committee Department of Community & Economic Development April 4, 2023 Mitigation Measures: 1.Project construction shall be required to comply with the recommendations found in the Geotechnical Engineering Services Report, prepared by GeoEngineers, Inc. on October 29, 2019, and any future addenda. 2.The applicant’s geotechnical engineer shall review the project’s construction and building permit plans to verify compliance with the geotechnical report(s). The geotechnical engineer shall submit a sealed letter or memo stating that he/she has reviewed the construction and building permit plans and in their opinion the plans and specifications meet the intent of the report(s). 3.The applicant shall be subject to the following contingency actions: a.Hazardous waste operations worker training, health/safety plan, and site control requirements, per WAC 296-843; DocuSign Envelope ID: C2A51094-5737-4E28-AD99-64DAED3CCFAE Environmental Review Committee Determination April 3, 2023 Page 2 of 2 SIGNATURES: Martin Pastucha, Administrator Public Works, Chair Date Anjela Barton, Fire Marshal Renton Regional Fire Authority Date Kelly Beymer, Administrator Parks and Recreation Date Chip Vincent, Administrator Date Community and Economic Development b.Management of potential contaminated soil and groundwater encountered during excavations, including sampling, containment, and disposal at a permitted facility; and c.Impacts of the construction project on ongoing contaminant remediation at the site, including procedures to prevent damage to site monitoring wells. The City of Renton Environmental Review Committee has determined that probable significant environmental impacts from the proposed project can be mitigated. An Environmental Impact Statement (EIS) is not required under RCW 43.21C.030(2)(c). Conditions were imposed as mitigation measures by the Environmental Review Committee under their authority of Section 4-9-070D Renton Municipal Code. These conditions are necessary to mitigate environmental impacts identified during the environmental review process. Because other agencies of jurisdiction may be involved, the lead agency will not act on this proposal for fourteen (14) days. Appeals of the environmental determination must be filed in writing on or before 5:00 p.m. on April 18, 2023. Appeals must be submitted electronically to the City Clerk at cityclerk@rentonwa.gov or delivered to City Hall 1st floor Lobby Hub Monday through Friday. The appeal fee, normally due at the time an appeal is submitted, will be collected at a future date if your appeal is submitted electronically. The appeal submitted in person may be paid on the first floor in our Finance Department. Appeals to the Hearing Examiner are governed by RMC 4-8-110 and additional information regarding the appeal process may be obtained from the City Clerk’s Office, cityclerk@rentonwa.gov. DocuSign Envelope ID: C2A51094-5737-4E28-AD99-64DAED3CCFAE 4/3/2023 | 3:09 PM PDT 4/3/2023 | 5:25 PM PDT4/3/2023 | 5:22 PM PDT DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF ENVIRONMENTAL DETERMINATION ISSUANCE OF A DETERMINATION OF NON-SIGNIFICANCE - MITIGATED (DNS-M) POSTED TO NOTIFY INTERESTED PERSONS OF AN ENVIRONMENTAL ACTION DNS-M: The City of Renton Environmental Review Committee (ERC) has determined that the proposed action has probable significant impacts that can be mitigated through mitigation measures. This DNS-M is issued after using the optional DNS process in WAC 197-11-355. There is no further comment period. DATE OF NOTICE OF ENVIRONMENTAL DETERMINATION: April 3, 2023 PROJECT NAME/NUMBER: PR23-000050 LivAway Renton Hotel Development / LUA23-000066, ECF, SA-A PROJECT LOCATION: 7XX Park Ave N, Renton, WA 98057 (APN 0886610010) APPLICANT/PROJECT CONTACT PERSON: Jenelle Taflin / 11235 SE 6th St, Suite 150 Bellevue, WA 98004 / jtaflin@navixeng.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/V8JOhsr PROJECT DESCRIPTION: The applicant is requesting Administrative Site Plan Review and Environmental (SEPA) Review approval to construct a four-story 126-guest room hotel and surface parking area near the intersection of Park Ave N and N 8th St (APN 0886610010). The proposed 59,711 square foot hotel is proposed along Park Ave N near the southeast corner of the 13.18-acre parcel. The project site received Master Plan approval for a phased development on August 19, 2019 and a minor modification approval on September 14, 2021 (LUA19-000094). The first phase included development of a premier golf entertainment complex with up to 508 surface parking stalls. The second phase included Administrative Site Plan Review and Environmental (SEPA) Review appr oval for the construction of an approximately 7,000 square foot multi-tenant retail building at the northeast corner of property (LUA22-000291). The subject property is bound by Logan Ave N to the west, N 8th St to the north, Park Ave N to the east, and of fice buildings with a parking structure to the south. As part of the final phase, the hotel portion of the overall project site would total approximately 72,895 square feet (1.67 acres). The parcel is located within the Commercial Mixed Use (CMU) land use designation and the Urban Center- 2 (UC-2) zoning district. In addition, the property is in the Urban Design District ‘C’ overlay district, and therefore subject to additional design elements. A total of 104 parking stalls would be provided within the hotel portion of the site and additional surface parking would be available via a shared parking easement agreement with previous phases. Primary access to the hotel building is proposed from Park Ave N. Additional access is available from Logan Ave N through the constructed Topgolf development. The site is relatively flat and the soils consist of fill overlying alluvial deposits. According to City of Renton (COR) Maps, the site contains high seismic hazards and a portion of the site is located within the Downtown Wellhead Protection Area Zone 2. No wetlands or streams are located on the property. NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR23-000050 LivAway Renton Hotel Development / LUA23-000066, ECF, SA-A Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  Groundwater was observed by the geotechnical engineer as shallow as four feet (4’) from the existing ground surface. Preliminary estimates of cut and fill include approximately 1,000 cubic yards to construct the proposed improvements. Enhanced water quality treatment for the recently constructed onsite parking lot area is provided by a Biopod Biofilter unit. Some onsite landscaping was included as part of the Topgolf development. No significant trees are proposed to be removed and 41 additional trees would be planted as part of the proposed final phase along with a variety of shrubs, grasses and groundcover. A short plat application is anticipated to be submitted at a fu ture date. The applicant has submitted a Technical Information Report, Geotechnical Engineering Services, Traffic Impact Analysis, and Wetland Reconnaissance with the application. Appeals of the environmental determination must be filed in writing on or before 5:00 p.m. on April 17, 2023. Due to the ongoing state of emergency enacted by Governor’s Proclamation 20-28.14 (and as amended), the City Clerk’s Office is working remotely. For that reason, appeals must be submitted electronically to the City Clerk at cityclerk@rentonwa.gov or delivered to City Hall 1st floor Lobby Hub Monday through Friday. The appeal fee, normally due at the time an appeal is submitted, will be collected at a future date if your appeal is submitted electronically. Appeal s to the Hearing Examiner are governed by RMC 4-8-110 and additional information regarding the appeal process may be obtained from the City Clerk’s Office, cityclerk@rentonwa.gov. PUBLIC HEARING: If the Environmental Determination is appealed, a public hearing will be set and all parties notified.