HomeMy WebLinkAboutEx20_Transportation_Concurrency_MemoDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
M E M O R A N D U M
DATE: March 27, 2023
TO: Clark Close, Principal Planner
FROM: Brianne Bannwarth, Development Engineering Director
SUBJECT: Traffic Concurrency Test
LivAway Renton Hotel Development; LUA23-000066
7XX Park Ave N (APN 0886610010)
The applicant is requesting Administrative Site Plan Review and Environmental (SEPA) Review
approval to construct a four-story 126-guest room hotel and surface parking area near the
intersection of Park Ave N and N 8th St (APN 0886610010). The proposed 59,711 square foot
hotel is proposed along Park Ave N near the southeast corner of the 13.18-acre parcel. The
project site received Master Plan approval for a phased development on August 19, 2019 and a
minor modification approval on September 14, 2021 (LUA19-000094). The first phase included
development of a premier golf entertainment complex with up to 508 surface parking stalls. The
second phase included Administrative Site Plan Review and Environmental (SEPA) Review
approval for the construction of an approximately 7,000 square foot multi-tenant retail building
at the northeast corner of property (LUA22-000291). The subject property is bound by Logan Ave
N to the west, N 8th St to the north, Park Ave N to the east, and office buildings with a parking
structure to the south. As part of the final phase, the hotel portion of the overall project site
would total approximately 72,895 square feet (1.67 acres). The parcel is located within the
Commercial Mixed Use (CMU) land use designation and the Urban Center- 2 (UC-2) zoning
district. In addition, the property is in the Urban Design District ‘C’ overlay district, and therefore
subject to additional design elements. A total of 104 parking stalls would be provided within the
hotel portion of the site and additional surface parking would be available via a shared parking
easement agreement with previous phases. Primary access to the hotel building is proposed from
Park Ave N. Additional access is available from Logan Ave N through the constructed Topgolf
development. The site is relatively flat and the soils consist of fill overlying alluvial deposits.
According to City of Renton (COR) Maps, the site contains high seismic hazards and a portion of
the site is located within the Downtown Wellhead Protection Area Zone 2. No wetlands or
streams are located on the property. Groundwater was observed by the geotechnical engineer
as shallow as four feet (4’) from the existing ground surface. Preliminary estimates of cut and fill
Transportation Concurrency Test – LivAway Renton Hotel Development
Page 2 of 3
March 27, 2023
include approximately 1,000 cubic yards to construct the proposed improvements. Enhanced
water quality treatment for the recently constructed onsite parking lot area is provided by a
Biopod Biofilter unit. Some onsite landscaping was included as part of the Topgolf development.
No significant trees are proposed to be removed and 41 additional trees would be planted as part
of the proposed final phase along with a variety of shrubs, grasses and groundcover. A short plat
application is anticipated to be submitted at a future date. The applicant has submitted a
Technical Information Report, Geotechnical Engineering Services, Traffic Impact Analysis, and
Wetland Reconnaissance with the application.
The proposed development would generate approximately 942 net new average weekday daily
trips. During the weekday AM peak hour, the project would generate approximately 56 net new
trips (31 inbound and 25 outbound). During the weekday PM peak hour, the project would
generate approximately 65 net new trips (33 inbound and 32 outbound). The proposed project
passes the City of Renton Traffic Concurrency Test per RMC 4-6-070.D as follows:
Traffic Concurrency Test Criteria Pass
Implementation of citywide Transportation Plan Yes
Within allowed growth levels Yes
Project subject to transportation mitigation or impact fees Yes
Site specific street improvements to be completed by project Yes
Traffic Concurrency Test Passes
Evaluation of Test Criteria
Implementation of citywide Transportation Plan: The City’s investment in completion of the
forecast traffic improvements is greater than 100% of the scheduled expenditure through 2023.
Within allowed growth levels: The citywide traffic concurrency trip capacity for concurrency with
the city adopted model for 2023 is 1,923 trips. The trip balance provides sufficient capacity to
accommodate approximately 65 trips from this project. A resulting 1,858 trips are remaining.
Project subject to transportation mitigation or impact fees: The project will be subject to
transportation impact fees at time of building permit issuances for the project.
Site specific street improvements to be completed by project: The project will be required to
complete frontage street improvements prior to occupancy. Any additional off-site
improvements identified through SEPA or land use approval will also be completed prior to
occupancy.
Transportation Concurrency Test – LivAway Renton Hotel Development
Page 3 of 3
March 27, 2023
Background Information on Traffic Concurrency Test for Renton
The City of Renton Traffic Concurrency requirements for proposed development projects are
covered under Renton Municipal Code (RMC) 4-6-070. The specific concurrency test requirement
is covered in RMC 4-6-070.D, which is listed for reference:
D. CONCURRENCY REVIEW PROCESS:
1. Test Required: A concurrency test shall be conducted by the Department for each
nonexempt development activity. The concurrency test shall determine consistency with
the adopted Citywide Level of Service Index and Concurrency Management System
established in the Transportation Element of the Renton Comprehensive Plan, according
to rules and procedures established by the Department. The Department shall issue an
initial concurrency test result describing the outcome of the concurrency test.
2. Written Finding Required: Prior to approval of any nonexempt development activity
permit application, a written finding of concurrency shall be made by the City as part of
the development permit approval. The finding of concurrency shall be made by the
decision maker with the authority to approve the accompanying development permits
required for a development activity. A written finding of concurrency shall apply only to
the specific land uses, densities, intensities, and development project described in the
application and development permit.
3. Failure of Test: If no reconsideration is requested, or if upon reconsideration a project
fails the concurrency test, the project application shall be denied by the decision maker
with the authority to approve the accompanying development activity permit application.
The Concurrency Management System established in the Transportation Element on page XI-65
of the Comprehensive Plan states the following:
Based upon the test of the citywide Transportation Plan, consideration of growth levels
included in the LOS-tested Transportation Plan, payment of a Transportation Mitigation
Fee, and an application of site-specific mitigation, development will have met City of
Renton concurrency requirements.