Loading...
HomeMy WebLinkAboutMFP21003951.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Major Franchise Permit: MFP21003951 IVR Number: 21003951 Permit Information Permit Name: SPU Franchise Permits Address/Location:08/13/2021Application Date:7231500210Parcel Number: 339 CEDAR AVE S Permit Type:04/06/2023Issue Date:Franchise Permit Work Class:04/05/2024Expiration Date:Major Utility Job Number: CP ImprovementsFranchise Type:Water / Sewer Description: SPU to open cut and install 50' of 2" grey conduit across Cedar ave S at Beacon Way S at min 36" depth to repair an existing cathodic protection cable. Restoration per City of Renton standards. PRE CONSTRUCTION MEETING REQUIRED APPROVED WITH COMMENTS OR REDLINES Contacts Name Address PhoneTypeBilling Paj Hwang Seattle Public Utilities C: (206) 379-6275Applicant Ronnie Geddes JR Seattle Public Utilities 2700 Airport Way S SEATTLE, WA 98134 B: (206) 386-4045 C: (206) 930-8193 Applicant Wylie Harper SEATTLE PUBLIC UTILITIES Contact Kevin Black SEATTLE PUBLIC UTILITIES Contact SEATTLE PUBLIC UTILITIES - Billing 700 5th Ave, Suite 4900 Seattle, WA 98104 ContactX Chris Cooper MESA 4445 E 74th Ave E 74th Ave Tulsa, OK 74145 C: (231) 414-7749Contractor Business License Number: 55831Construction Contractor: MESAPPI886PD CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Page 1 of 1 | Published: 1/2/2019 Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200 Email: franchisepermits@rentonwa.gov Website: rentonwa.gov FRANCHISE PERMIT APPLICATION Published: 1/2/2019 TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Site Specific Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $630.00. Inspection fee for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour. Franchise Agency: Franchise Job Number: Phone: Contact Name: Email: Job Site Address: Project Name: Description of Work: Please check all that apply: ☐New Construction ☐Repair/Relocate ☐Underground ☐Overhead ☐Sidewalk ☐Street ☐Open Trench ☐ Bore # of feet: Contractor Name: Phone: State Contractors License #: City of Renton Business License #: “I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ” Signature Date INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $125/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date. Plan Review/Development Engineering Date Approved as submitted Pre-Construction Meeting required Site Construction Inspector Date Approved with comments or redlines Camera inspection of utilities required Development Engineering Manager Date Seattle Public Utilities Paj Hwang paj.hwang@seattle.gov 2021 CP Improvements ProjectCedar Ave S and Beacon Way S 206-379-6275 Open Cut and install 50 lineal feel for 2" grey conduit across Cedar Ave S at Beacon Way S. at min. 36" depth to repair an existing cathodic protection cable . Trench excavation and asphalt and concrete sidewalk restoration will be per City of Renton requirements. x x x x x 50 To be Provided after Project Bid 8/13/21 MFP21003951 This permit is for Major construction work in the ROW and will be billed at an additional $60/HR for inspections. After hours and weekend work will be billed at $125/HR RESTORATION PER CITY OF RENTON STANDARDS POTHOLE ALL EXISTING UTILITIES Mesa 231-414-7749 MESAPPI886PD 55831 Scott Warlick 4/6/2023 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. DEPARTMENT OF PUBLIC WORKS Page 1 of 3 | Published: 10/27/2021 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN APPLICATION Published: 10/27/2021 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. 1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents. 2. The following items are all required for submittal of the TCP Application: ☐ Electronic Copy of the TCP Application ☐ Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall:  Include map(s) showing the location of the project and work area.  Be legible lettering and clear, contrasting, symbols of viewing or printing.  Must indicate street names, and north arrow and scale.  Types of plans required: o Work hour plan – show all mobility impacts during construction hours. o Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. o Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. o Pedestrian access/detour plan, if applicable. - Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. 3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].” Project Name: Permit #: Site Address: Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Construction Company: Contact Name: Phone/Cell: _________________________ Business Address: City/State: Zip: Description of Work: Approval By: _________________________________________________ Date:____________________ Transportation Engineering City of Seattle - Cathodic Protection Program 2021 MFP21003951 339 Cedar Ave S 5.15.23 6.23.23 7:00AM 5:00PM MESA Chris Cooper - Sr Project Manager 231.414.7749 206 Eleanor Ct NW - Unit 350 South Prairie/WA 98385 Open Trench to install new Header Cable on SPU existing cathodic protection system Monday - Friday 8:00am 3:30pm Scott Warlick CED 4/6/2023 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 3 | Published: 10/27/2021 PERMIT HOLDER AGREES TO ALL THE FOLLOWING:  Must have approved Traffic Control Plan (TCP) prior to commencing the work.  Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians.  WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the traveled way.  Comply with all traffic regulations of the City of Renton and the State of Washington.  Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices.  Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.  Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends and holidays) prior to starting any work.  Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140 with any questions.  Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes.  Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees.  The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim.  In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same.  Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel.  All permit conditions shall be met. NOTES:  Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.  Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by a traffic control plan layout or reference to WSDOT.  Approved Temporary Traffic Control Plan must be at the work site during work hours.  Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone.  Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours.  Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 3 of 3 | Published: 10/27/2021  In the case of Temporary No Parking Zones, all the following apply in addition to previous:  Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage.  Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time.  The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site.  Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). I certify that the information on this application and within the submittal documents are accurate to the best of my knowledge and I acknowledge all the requirements on this application. Applicant’s Signature Date Applicant’s Name (Print) 4.3.23 Chris Cooper ESWNTCP Designs TCS # 012319 Phone: 206-584-1831 Lola Higby Trafficplandesigns@gmail.com Date: 12/22/2022 *Signs, devices and spacing shall conform to the MUTCD *Coordinate/facilitate driveway/load zone access *Maintain 11' vehicle lane widths *Priority access shall be provided to emergency vehicles *Notify metro of bus route/stop impacts *NOT TO SCALE *Sign spacing may be reduced to fit road conditions Traffic Control Plan P# Jobsite Address: CEDAR AVE S & BEACON WAY S RENTON WA Contact: CHRIS COOPER Email: CHRIS.COOPER@MESAPRODUCTS.COM Phone: 231-414-7749 Work Hours: 8A-5P M-F Type of Work: CATHODIC PROTECTION INSTAL ON SPU WATER Legend Work Area DETOUR detour (R) DETOUR detour (L) DETOUR SIGN SPACINGPosted Speed limit 45/50 35/40 25/30 500' +/- 350' +/- 200' +/- Sign Spacing CEDAR AVE SBEACON WAY S S 4TH STMILL AVE S MI L L AVE S RENTON AVE S S 7TH ST DETOURDETOUR DETOURDETOURDETOUR DETOUR DETOURDETOURDETOURSPEED LIMIT 25 DE TOU R DETOURwww.invarion.com Work hours to be from 8:00am - 3:30pm. The road cannot be shut down overnight. Provide steel sheets to cover the hole and open up the road way at the end of work day. ESWNTCP Designs TCS # 012319 Phone: 206-584-1831 Lola Higby Trafficplandesigns@gmail.com Date: 12/22/2022 *Signs, devices and spacing shall conform to the MUTCD *Coordinate/facilitate driveway/load zone access *Maintain 11' vehicle lane widths *Priority access shall be provided to emergency vehicles *Notify metro of bus route/stop impacts *NOT TO SCALE *Sign spacing may be reduced to fit road conditions Traffic Control Plan P# Jobsite Address: CEDAR AVE S & BEACON WAY S RENTON WA Contact: CHRIS COOPER Email: CHRIS.COOPER@MESAPRODUCTS.COM Phone: 231-414-7749 Work Hours: 8A-5P M-F Type of Work: CATHODIC PROTECTION INSTAL ON SPU WATER Legend Work Area Barrier DETOUR M4-10L DETOUR -LEFTROAD CLOSED AHEAD road closed ahead DETOURAHEAD W20-2 A B C D 200'200'200'X X350'350'350' 500'500'500'500' 800'800'800'800' 1500'1500'1500'1500' DISTANCE BETWEEN SIGNS WORK AREA25/30 35/40 45/60 60/65 55/70FREEWAYS EXPRESSWAYS RURAL HWYS RURAL URBAN(HIGH MPH) URBAN(LOW MPH) SPEED ROAD TYPE SUGGESTED ADVANCE WARNING SIGN PLACEMENT CHANNELIZING DEVICES SPACING (FEET) MPH TAPER TANGENT 50/70 35/45 25/30 40 4020 30 60 80 MINIMUM TAPER LENGTH (L) IN FEET LANE WIDTH (FEET) POSTED SPEED (MPH) 25 30 35 40 45 50 55 60 65 70 10 11 12 105 115 125 180 165 150 205 225 245 320 295 265 450 495 540 500 550 600 550 605 660 660 720 780 840 --- -- BUFFER DATA 25 30 35 40 45 50 55 60 65 70 LONGITUDINAL BUFFER SPACE = B SPEED (MPH) LENGTH (FEET)155 200 250 305 360 425 495 570 645 730 ROADCLOSEDROADCLOSEDROADCLOSEDROADCLOSEDDETOURDETOURDETOURDETOURROAD CLOSED AHEAD ROAD CLOSED AHEAD ROAD CLOSED AHEAD ROAD CLOSED AHEAD ROAD CLOSED AHEAD ROAD CLOSED AHEADDETOUR AHEAD DETOUR AHEADDETOUR AHEAD DETOUR AHEAD DETOUR AHEAD DETOUR AHEAD CEDAR AVE S BEACON W AY S S 4TH ST MILL AVE S CEDAR AVE S 12'12'24' X 100' www.invarion.com 2 - type 3 barricades required for each side Work hours to be from 8:00am - 3:30pm. The road cannot be shut down overnight. Provide steel sheets to cover the hole and open up the road way at the end of work day. 90% DESIGN DEVELOPMENT G-001 MFP21003951 This permit is for Major construction work in the ROW and will be billed at an additional $60/HR for inspections. After hours and weekend work will be billed at $125/HR 90% DESIGN DEVELOPMENT G-002 MFP21003951 90% DESIGN DEVELOPMENT G-003 MFP21003951 90% DESIGN DEVELOPMENT CU103 MFP21003951 RESTORATION PER CITY OF RENTON STANDARDS POTHOLE ALL EXISTING UTILITIES