Loading...
HomeMy WebLinkAboutIssued construction permitDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Constructon Permit: C17005029 IVR Number: 17005029 Permit Informaton Permit Name: street light and driveway relocaton - Lot 11 of Enclave at Bridle Ridge Address/Locaton:10/26/2017Applicaton Date:2345750110Parcel Number: 726 WAPATO PL SE Permit Type:11/17/2017Issue Date:Engineering Permit Work Class:11/17/2018Expiraton Date:Constructon Plan Reviewer: Rohini Nair 425-430-7298 Descripton: Street light and driveway relocaton Lot 11 of Enclave at Bridle Ridge. Conditon of approval Preconstructon meetng to be held prior to start of work. Contacts Name Address PhoneTypeBilling MARISSA GOSS Albacore ACH LLC 9675 SE 36th St, Suite 105 Mercer Island, WA 98040 B: (206) 588-1147ApplicantX Justn Lagers ACH Homes, LLC 9675 SE 36th St, Suite 105 Mercer Island, WA 98040 B: (253) 405-5587Contact D.R. Strong Consultng Engineers (D. R. Strong) (D R Strong) 10604 NE 38th Pl, 232 Kirkland, WA 98033 B: (425) 827-3063Engineer , Owner NIPERT SALLY LOU 14004 156TH AVE SE RENTON , WA 98059 Owner General Conditons & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton codes and ordinances. Ÿ Call (425) 430-7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575)(Puget Sound Energy at 425.457.5816) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES