Loading...
HomeMy WebLinkAbout2016 City of Renton Water, Sewer and Storm Fees/(a)Waterservicefeetb)FireservicefeeaS(c)Wastewaterfee(3)1-1/2inch(a)Waterservicefee(b)Fireservicefeea,b(c)Wastewaterfee(5)3inch(a)Waterservicefee(b)Fireservicefeea,b(c(WastewaterfeeCityofRentonFeeSchedule$2,809.00$365.00$2,033.00(ii)StormWaterSystemDevelopmentCharges:(1)Newsinglefamilyresidence(includingmobile/manufacturedhomes)(2)Additiontoexistingsinglefamilyresidencegreaterthan500squarefeet(includingmobile/manufacturedhomes)Feenottoexceed$1,012.00(3)Allotheruseschargepersquarefootofnewimpervioussurface,butnotlessthan$1,012.00$1,228.00$1,350.00$0.49;$054050.594persqfootpersqfootpersqfoot50.49150.540$0594persqfootpersqfootpersqfoot$50.00$60deposit+timeandmaterialsTimeandmaterials$50.00$60deposit+timeandmaterialsTimeandmaterials$50.00$60deposit+timeandmaterialsTimeandmaterials(2)1inchTYPEOFFEES201420152016(4)2inch(a)Waterservicefee(b(Fireservicefeea,b(c)Wastewaterfee$3,090.00$402.00$2,135.00$15,450.00$2,010.00$10,675.00$24,720.00$3,216.00$17,080.00$49,440.00$6,432.00$34,160.00$77,250.00$10,050.00$53,375.00$154,500.00$20,100.00$106,750.00$247,200.00$32,160.00$170,800.00$14,045.00$1,826.00$10,165.00$22,472.00$2,921.00$16,264.00$44,944.00$5,843.00$32,528.00$70,225.00$9,129.00$50,825.00$140,450.00$18,259.00$101,650.00$224,720.00$29,214.00$162,640.00(6)4inch(a)Waterservicefee(b)FireservicefeeaS(c)Wastewaterfee(7)6inchCa)Waterservicefee(b)Fireservicefeea,b(c(Wastewaterfee(8)8inch(a)Waterservicefeefb(Fireservicefeea,b(c)Wastewaterfee3,245.00Lj$2,242.00$16,225.00$2,110.00$11,210.00$25,960.00$3,376.00$17,936.00$51,920.00$6,752.00$35,872.00$81,125.00$10,550.00556,050.00$162,250.00$21,100.00$112,100.00$259,600.00$33,760.00$179,360.00aBaseduponthesizeofthefireservice(NOTdetectorbypassmeter(Unlessaseparatefireserviceisprovided,thesystemdevelopmentcharge(s)shallbebaseduponthesizeofthemeterinstalledandaseparatefireservicefeewillnotbecharged.d.AdministrativeFeesforSDCSegregationRequest:Theapplicantshallpaythecity’sadministrativecostsforthepreparation,processingandrecordingofthepartialpaymentofthefee(s).Atthetimeofapplicationforspecialassessmentdistrict,and/orlatecomer’schargepartialpaymenttheapplicantshallpaytheadministrativefeeof$750.00foreachsegregation.Ifthesamesegregationisusedformorethanoneutility’sspecialassessmentdistrict,and/orlatecomer’scharge,thenonlyoneadministrativefeeiscollected.e.PublicWorksConstructionPermitFees:Thefollowingpublicworksconstructionpermitfees,utilitypermitfees,andmiscellaneouschargesarepayableatorpriortothetimeofconstructionpermitissuance.(i)WaterConstructionPermitFees:(1)Watermetertestsfor3/4”to2”meter(a(Watermetertestsonmeters2”orlarger(b(Openandclosefirehydrantsforfireflowtestsconductedbyothers.15