HomeMy WebLinkAboutP_Civil Construction Plans_171101_v2Use sepa addendum mitigation measures from may 16, 2016 report.1.Project construction shall be required to comply with therecommendations found in the Geotechnical Engineering Studyprepared by Geotech Consultants, Inc. dated May 27, 2014 or anupdated report submitted at a later date.4.The applicant shall provide a paved 16-foot wide shared drivewaythrough the existing Winsper Division No. 1 Tracts H that is consistentwith the shared private driveway standards of the Renton MunicipalCode (RMC 4-6-060J). The private access roads shall meet the minimumnecessary to provide for safe and effective access for the existingresidents, proposed residents, and fire and emergency vehicles.adjust easement leaderto reflect 15'easement location. seedraft access easementthat was submitted.Markup LegendREDRequired RevisionsBLUERecommended RevisionsPURPLEAdvisory OnlyGREENItems to be Deleted
Remove the three shades of gray or zone ofinfluence from the neighbors parcels. ithas been communicated that no temporaryaccess easements will be given on APN9485750390 and APN 9485750380.
ie = 170.1, nie = 170.1, nie = 170.1, nmove gate back to original location. show gate on rory's property. i forgotto erase the callout telling you tomove it on the original set of redlines. there needs to be a 4' paved pedestrianpath on the side of the gate. show,label, and dimension this path.
127LF27lf 6"10327lf 6" s.s. @ 2.69%s.s. @ 4.76%remove