HomeMy WebLinkAboutLimelite - TIR - Bond Worksheet Review Comments - 2016-08-04Site Improvement Bond Quantity Worksheet Web date: 11/21/2005
Department of Development & Environmental Services
900 Oakesdale Avenue Southwest
Renton, Washington 98055-1219
206-296-6600 TTY 206-296-7217
Project Name: Date:
Location: Project No.:
Activity No.:
Note: All prices include labor, equipment, materials, overhead and
Clearing greater than or equal to 5,000 board feet of timber? profit. Prices are from RS Means data adjusted for the Seattle area
or from local sources if not included in the RS Means database.
_____________yes X no
If yes,
Forest Practice Permit Number:
(RCW 76.09)
Page 1 of 9
Limelite Short Plat
16204 114th AVE SE, RENTON, WA 98055
For alternate formats, call 206-296-6600.
__________________
8/1/2016
BONDQUANTITY_Permit_Final.xlsx
Unit prices updated: 02/12/02
Version: 04/22/02
Report Date: 8/1/2016
Site Improvement Bond Quantity Worksheet Web date: 11/21/2005
Unit # of
Reference #Price Unit Quantity Applications Cost
EROSION/SEDIMENT CONTROL Number
Backfill & compaction-embankment ESC-1 5.62$ CY
Check dams, 4" minus rock ESC-2 SWDM 5.4.6.3 67.51$ Each
Crushed surfacing 1 1/4" minus ESC-3 WSDOT 9-03.9(3) 85.45$ CY
Ditching ESC-4 8.08$ CY
Excavation-bulk ESC-5 1.50$ CY
Fence, silt ESC-6 SWDM 5.4.3.1 1.38$ LF 499 1 689
Fence, Temporary (NGPE)ESC-7 1.38$ LF
Hydroseeding ESC-8 SWDM 5.4.2.4 0.59$ SY 3323 1 1961
Jute Mesh ESC-9 SWDM 5.4.2.2 1.45$ SY
Mulch, by hand, straw, 3" deep ESC-10 SWDM 5.4.2.1 2.01$ SY 3323 1 6679
Mulch, by machine, straw, 2" deep ESC-11 SWDM 5.4.2.1 0.53$ SY
Piping, temporary, CPP, 6"ESC-12 10.70$ LF
Piping, temporary, CPP, 8"ESC-13 16.10$ LF
Piping, temporary, CPP, 12"ESC-14 20.70$ LF
Plastic covering, 6mm thick, sandbagged ESC-15 SWDM 5.4.2.3 2.30$ SY 5000 1 11500
Rip Rap, machine placed; slopes ESC-16 WSDOT 9-13.1(2) 39.08$ CY
Rock Construction Entrance, 50'x15'x1'ESC-17 SWDM 5.4.4.1 1,464.34$ Each 1 1 1464
Rock Construction Entrance, 100'x15'x1'ESC-18 SWDM 5.4.4.1 2,928.68$ Each
Sediment pond riser assembly ESC-19 SWDM 5.4.5.2 1,949.38$ Each
Sediment trap, 5' high berm ESC-20 SWDM 5.4.5.1 17.91$ LF
Sed. trap, 5' high, riprapped spillway berm section ESC-21 SWDM 5.4.5.1 68.54$ LF
Seeding, by hand ESC-22 SWDM 5.4.2.4 0.51$ SY
Sodding, 1" deep, level ground ESC-23 SWDM 5.4.2.5 6.03$ SY
Sodding, 1" deep, sloped ground ESC-24 SWDM 5.4.2.5 7.45$ SY
TESC Supervisor ESC-25 74.75$ HR
Water truck, dust control ESC-26 SWDM 5.4.7 97.75$ HR 10 1 978
WRITE-IN-ITEMS **** (see page 9)
50.00$ Each 10
ESC SUBTOTAL:23,270.26$
30% CONTINGENCY & MOBILIZATION:6,981.08$
ESC TOTAL:30,251.34$
COLUMN:A
Page 2 of 9
Catch Basin Protection
BONDQUANTITY_Permit_Final.xlsx
Unit prices updated: 02/12/02
Version: 04/22/02
Report Date: 8/1/2016
Site Improvement Bond Quantity Worksheet Web date: 11/21/2005
Existing Future Public Private
Right-of-Way Road Improvements Improvements
& Drainage Facilities Quant.
Unit Price Unit Quant. Cost Quant. Cost Quant. Cost Complete Cost
GENERAL ITEMS No.
Backfill & Compaction- embankment GI - 1 5.62$ CY
Backfill & Compaction- trench GI - 2 8.53$ CY
Clear/Remove Brush, by hand GI - 3 0.36$ SY
Clearing/Grubbing/Tree Removal GI - 4 8,876.16$ Acre 0.687 6,097.92
Excavation - bulk GI - 5 1.50$ CY
Excavation - Trench GI - 6 4.06$ CY
Fencing, cedar, 6' high GI - 7 18.55$ LF
Fencing, chain link, vinyl coated, 6' high GI - 8 13.44$ LF
Fencing, chain link, gate, vinyl coated, 20' GI - 9 1,271.81$ Each
Fencing, split rail, 3' high GI - 10 12.12$ LF
Fill & compact - common barrow GI - 11 22.57$ CY 554 12,503.78
Fill & compact - gravel base GI - 12 25.48$ CY
Fill & compact - screened topsoil GI - 13 37.85$ CY
Gabion, 12" deep, stone filled mesh GI - 14 54.31$ SY
Gabion, 18" deep, stone filled mesh GI - 15 74.85$ SY
Gabion, 36" deep, stone filled mesh GI - 16 132.48$ SY
Grading, fine, by hand GI - 17 2.02$ SY
Grading, fine, with grader GI - 18 0.95$ SY
Monuments, 3' long GI - 19 135.13$ Each
Sensitive Areas Sign GI - 20 2.88$ Each
Sodding, 1" deep, sloped ground GI - 21 7.46$ SY
Surveying, line & grade GI - 22 788.26$ Day
Surveying, lot location/lines GI - 23 1,556.64$ Acre
Traffic control crew ( 2 flaggers ) GI - 24 85.18$ HR
Trail, 4" chipped wood GI - 25 7.59$ SY
Trail, 4" crushed cinder GI - 26 8.33$ SY
Trail, 4" top course GI - 27 8.19$ SY
Wall, retaining, concrete GI - 28 44.16$ SF
Wall, rockery GI - 29 9.49$ SF
Page 3 of 9 SUBTOTAL 18,601.70
Quantity Completed
(Bond Reduction)*
*KCC 27A authorizes only one bond reduction.
BONDQUANTITY_Permit_Final.xlsx
Unit prices updated: 02/12/02
Version: 4/22/02
Report Date: 8/1/2016
Site Improvement Bond Quantity Worksheet Web date: 11/21/2005
Existing Future Public Private Bond Reduction*
Right-of-way Road Improvements Improvements
& Drainage Facilities Quant.
Unit Price Unit Quant. Cost Quant. Cost Quant. Cost Complete Cost
ROAD IMPROVEMENT No.
AC Grinding, 4' wide machine < 1000sy RI - 1 23.00$ SY
AC Grinding, 4' wide machine 1000-2000sy RI - 2 5.75$ SY
AC Grinding, 4' wide machine > 2000sy RI - 3 1.38$ SY
AC Removal/Disposal/Repair RI - 4 41.14$ SY
Barricade, type I RI - 5 30.03$ LF
Barricade, type III ( Permanent ) RI - 6 45.05$ LF
Curb & Gutter, rolled RI - 7 13.27$ LF
Curb & Gutter, vertical RI - 8 9.69$ LF 372 3,604.68
Curb and Gutter, demolition and disposal RI - 9 13.58$ LF
Curb, extruded asphalt RI - 10 2.44$ LF
Curb, extruded concrete RI - 11 2.56$ LF
Sawcut, asphalt, 3" depth RI - 12 1.85$ LF 770 1,424.50
Sawcut, concrete, per 1" depth RI - 13 1.69$ LF
Sealant, asphalt RI - 14 0.99$ LF
Shoulder, AC, ( see AC road unit price ) RI - 15 -$ SY
Shoulder, gravel, 4" thick RI - 16 7.53$ SY
Sidewalk, 4" thick RI - 17 30.52$ SY
Sidewalk, 4" thick, demolition and disposal RI - 18 27.73$ SY
Sidewalk, 5" thick RI - 19 34.94$ SY
Sidewalk, 5" thick, demolition and disposal RI - 20 34.65$ SY
Sign, handicap RI - 21 85.28$ Each
Striping, per stall RI - 22 5.82$ Each
Striping, thermoplastic, ( for crosswalk ) RI - 23 2.38$ SF
Striping, 4" reflectorized line RI - 24 0.25$ LF
Page 4 of 9 SUBTOTAL 5,029.18
*KCC 27A authorizes only one bond reduction.
BONDQUANTITY_Permit_Final.xlsx
Unit prices updated: 02/12/02
Version: 4/22/02
Report Date: 8/1/2016
Site Improvement Bond Quantity Worksheet Web date: 11/21/2005
Existing Future Public Private Bond Reduction*
Right-of-way Road Improvements Improvements
& Drainage Facilities Quant.
Unit Price Unit Quant. Cost Quant. Cost Quant. Cost Complete Cost
ROAD SURFACING (4" Rock = 2.5 base & 1.5" top course) For '93 KCRS ( 6.5" Rock= 5" base & 1.5" top course)
For KCRS '93, (additional 2.5" base) add: RS - 1 3.60$ SY
AC Overlay, 1.5" AC RS - 2 7.39$ SY
AC Overlay, 2" AC RS - 3 8.75$ SY
AC Road, 2", 4" rock, First 2500 SY RS - 4 17.24$ SY
AC Road, 2", 4" rock, Qty. over 2500SY RS - 5 13.36$ SY
AC Road, 3", 4" rock, First 2500 SY RS - 6 19.69$ SY 520 10,238.80 390 7,679.10
AC Road, 3", 4" rock, Qty. over 2500 SY RS - 7 15.81$ SY
AC Road, 5", First 2500 SY RS - 8 14.57$ SY
AC Road, 5", Qty. Over 2500 SY RS - 9 13.94$ SY
AC Road, 6", First 2500 SY RS - 10 16.76$ SY
AC Road, 6", Qty. Over 2500 SY RS - 11 16.12$ SY
Asphalt Treated Base, 4" thick RS - 12 9.21$ SY
Gravel Road, 4" rock, First 2500 SY RS - 13 11.41$ SY
Gravel Road, 4" rock, Qty. over 2500 SY RS - 14 7.53$ SY
PCC Road, 5", no base, over 2500 SY RS - 15 21.51$ SY
PCC Road, 6", no base, over 2500 SY RS - 16 21.87$ SY
Thickened Edge RS - 17 6.89$ LF
Page 5 of 9 SUBTOTAL 10,238.80 7,679.10
*KCC 27A authorizes only one bond reduction.
BONDQUANTITY_Permit_Final.xlsx
Unit prices updated: 02/12/02
Version: 4/22/02
Report Date: 8/1/2016
Site Improvement Bond Quantity Worksheet Web date: 11/21/2005
Existing Future Public Private Bond Reduction*
Right-of-way Road Improvements Improvements
& Drainage Facilities Quant.
Unit Price Unit Quant. Cost Quant. Cost Quant. Cost Complete Cost
DRAINAGE (CPP = Corrugated Plastic Pipe, N12 or Equivalent)For Culvert prices, Average of 4' cover was assumed. Assume perforated PVC is same price as solid pipe.
Access Road, R/D D - 1 16.74$ SY
Bollards - fixed D - 2 240.74$ Each
Bollards - removable D - 3 452.34$ Each
* (CBs include frame and lid)
CB Type I D - 4 1,257.64$ Each 7 8,803.48 7 8,803.48
CB Type IL D - 5 1,433.59$ Each
CB Type II, 48" diameter D - 6 2,033.57$ Each 3 6,100.71
for additional depth over 4' D - 7 436.52$ FT 3 1,309.56
CB Type II, 54" diameter D - 8 2,192.54$ Each 1 2,192.54
for additional depth over 4' D - 9 486.53$ FT 1 486.53
CB Type II, 60" diameter D - 10 2,351.52$ Each
for additional depth over 4' D - 11 536.54$ FT
CB Type II, 72" diameter D - 12 3,212.64$ Each
for additional depth over 4' D - 13 692.21$ FT
Through-curb Inlet Framework (Add) D - 14 366.09$ Each
Cleanout, PVC, 4" D - 15 130.55$ Each
Cleanout, PVC, 6" D - 16 174.90$ Each
Cleanout, PVC, 8" D - 17 224.19$ Each
Culvert, PVC, 4" D - 18 8.64$ LF
Culvert, PVC, 6" D - 19 12.60$ LF 40 504.00
Culvert, PVC, 8" D - 20 13.33$ LF 240 3,199.20
Culvert, PVC, 12" D - 21 21.77$ LF 895 19,484.15 34 740.18
Culvert, CMP, 8" D - 22 17.25$ LF
Culvert, CMP, 12" D - 23 26.45$ LF
Culvert, CMP, 15" D - 24 32.73$ LF
Culvert, CMP, 18" D - 25 37.74$ LF
Culvert, CMP, 24" D - 26 53.33$ LF
Culvert, CMP, 30" D - 27 71.45$ LF
Culvert, CMP, 36" D - 28 112.11$ LF
Culvert, CMP, 48" D - 29 140.83$ LF
Culvert, CMP, 60" D - 30 235.45$ LF
Culvert, CMP, 72" D - 31 302.58$ LF
Page 6 of 9 SUBTOTAL 35,697.90 15,925.93
*KCC 27A authorizes only one bond reduction.
BONDQUANTITY_Permit_Final.xlsx
Unit prices updated: 02/12/02
Version: 4/22/02
Report Date: 8/1/2016
Site Improvement Bond Quantity Worksheet Web date: 11/21/2005
Existing Future Public Private Bond Reduction*
Right-of-way Road Improvements Improvements
DRAINAGE CONTINUED & Drainage Facilities Quant.
No. Unit Price Unit Quant. Cost Quant. Cost Quant. Cost Complete Cost
Culvert, Concrete, 8" D - 32 21.02$ LF
Culvert, Concrete, 12" D - 33 30.05$ LF
Culvert, Concrete, 15" D - 34 37.34$ LF
Culvert, Concrete, 18" D - 35 44.51$ LF
Culvert, Concrete, 24" D - 36 61.07$ LF
Culvert, Concrete, 30" D - 37 104.18$ LF
Culvert, Concrete, 36" D - 38 137.63$ LF
Culvert, Concrete, 42" D - 39 158.42$ LF
Culvert, Concrete, 48" D - 40 175.94$ LF
Culvert, CPP, 6" D - 41 10.70$ LF
Culvert, CPP, 8" D - 42 16.10$ LF
Culvert, CPP, 12" D - 43 20.70$ LF
Culvert, CPP, 15" D - 44 23.00$ LF
Culvert, CPP, 18" D - 45 27.60$ LF
Culvert, CPP, 24" D - 46 36.80$ LF
Culvert, CPP, 30" D - 47 48.30$ LF
Culvert, CPP, 36" D - 48 55.20$ LF
Ditching D - 49 8.08$ CY
Flow Dispersal Trench (1,436 base+) D - 50 25.99$ LF
French Drain (3' depth) D - 51 22.60$ LF
Geotextile, laid in trench, polypropylene D - 52 2.40$ SY
Infiltration pond testing D - 53 74.75$ HR
Mid-tank Access Riser, 48" dia, 6' deep D - 54 1,605.40$ Each 5 8027
Pond Overflow Spillway D - 55 14.01$ SY
Restrictor/Oil Separator, 12" D - 56 1,045.19$ Each
Restrictor/Oil Separator, 15" D - 57 1,095.56$ Each
Restrictor/Oil Separator, 18" D - 58 1,146.16$ Each
Riprap, placed D - 59 39.08$ CY
Tank End Reducer (36" diameter) D - 60 1,000.50$ Each 1 1000.5
Trash Rack, 12" D - 61 211.97$ Each
Trash Rack, 15" D - 62 237.27$ Each
Trash Rack, 18" D - 63 268.89$ Each
Trash Rack, 21" D - 64 306.84$ Each
Page 7 of 9 SUBTOTAL 9027.5
*KCC 27A authorizes only one bond reduction.
BONDQUANTITY_Permit_Final.xlsx
Unit prices updated: 02/12/02
Version: 4/22/02
Report Date: 8/1/2016
Site Improvement Bond Quantity Worksheet Web date: 11/21/2005
Existing Future Public Private Bond Reduction*
Right-of-way Road Improvements Improvements
& Drainage Facilities Quant.
Unit Price Unit Quant. Price Quant. Cost Quant. Cost Complete Cost
PARKING LOT SURFACING
No.
2" AC, 2" top course rock & 4" borrow PL - 1 15.84$ SY
2" AC, 1.5" top course & 2.5" base course PL - 2 17.24$ SY
4" select borrow PL - 3 4.55$ SY
1.5" top course rock & 2.5" base course PL - 4 11.41$ SY
WRITE-IN-ITEMS
(Such as detention/water quality vaults.)No.
Stormdrain HDPE - 8 inch WI - 1 40.00$ LF 280 11,200.00
Stormdrain HDPE - 12 inch WI - 3 50.00$ LF 895 44,750.00 35 1,750.00
Stormdrain HDPE - 78 inch detention pipe WI - 4 200.00$ LF 236 47,200.00
Sanitary Sewer pipe - 6 inch WI - 5 40.00$ LF 155 6,200.00
Water Pipe 1" including exc and backfill WI - 6 40.00$ LF 240 9,600.00
Water Meter WI - 7 2,000.00$ Each 5 10,000.00
Pervious Concrete Sidewalk WI - 8 50.00$ SY 230 11,500.00
ADA Curb Ramp WI - 9 800.00$ Each 1 800.00
Concrete Driveway WI - 10 35.00$ SY 165 5,775.00
WI - 11
WI - 12
SUBTOTAL 62,825.00 85,950.00
SUBTOTAL (SUM ALL PAGES):113,790.88 137,184.23
30% CONTINGENCY & MOBILIZATION:34,137.26 41,155.27
GRANDTOTAL:147,928.14 178,339.50
COLUMN: B C D E
Page 8 of 9
*KCC 27A authorizes only one bond reduction.
BONDQUANTITY_Permit_Final.xlsx
Unit prices updated: 02/12/02
Version: 4/22/02
Report Date: 8/1/2016
Site Improvement Bond Quantity Worksheet Web date: 11/21/2005
Original bond computations prepared by:
Name: Date:
PE Registration Number: Tel. #:
Firm Name:
Address: Project No:
Stabilization/Erosion Sediment Control (ESC) (A)
Existing Right-of-Way Improvements (B)
Future Public Road Improvements & Drainage Facilities (C)
Private Improvements (D)
Calculated Quantity Completed (E)
Total Right-of Way and/or Site Restoration Bond*/** (A+B)
(First $7,500 of bond* shall be cash.)
Performance Bond* Amount (A+B+C+D) = TOTAL (T) T x 0.30 OR
Minimum bond* amount is $1000.
Reduced Performance Bond* Total ***
Use larger of Tx30% or (T-E)
Maintenance/Defect Bond* Total
NAME OF PERSON PREPARING BOND* REDUCTION: Date:
* NOTE:The word "bond" as used in this document means any financial guarantee acceptable to King County.
** NOTE:KCC 27A authorizes right of way and site restoration bonds to be combined when both are required.
The restoration requirement shall include the total cost for all TESC as a minimum, not a maximum. In addition, corrective work, both on- and off-site needs to be included.
Quantities shall reflect worse case scenarios not just minimum requirements. For example, if a salmonid stream may be damaged, some estimated costs for restoration
needs to be reflected in this amount. The 30% contingency and mobilization costs are computed in this quantity.
*** NOTE:Per KCC 27A, total bond amounts remaining after reduction shall not be less than 30% of the original amount (T) or as revised by major design changes.
SURETY BOND RIDER NOTE: If a bond rider is used, minimum additional performance bond shall be (C+D)-E
REQUIRED BOND* AMOUNTS ARE SUBJECT TO REVIEW AND MODIFICATION BY DDES
-$
8/1/2016
206-596-7115
ROAD IMPROVEMENTS & DRAINAGE FACILITIES FINANCIAL GUARANTEE REQUIREMENTS
PUBLIC ROAD & DRAINAGE
MAINTENANCE/DEFECT BOND*
Peter Apostol
Coterra Engineering
321 3rd Avenue South, Suite 406, Seattle, WA 98104
PERFORMANCE BOND*
AMOUNT
35163
BOND* AMOUNT
REQUIRED AT RECORDING OR
TEMPORARY OCCUPANCY ***
326,267.6$
36,982.0$
356,519.0$
30,251.3$
(T-E)
-$
147,928.1$
106,955.7$
(B+C) x
0.25 =
30,251.3$
178,339.5$
356,519.0$
Page 9 of 9
BONDQUANTITY_Permit_Final.xlsx
Check out the DDES Web site at www.metrokc.gov/ddes
Unit prices updated: 02/12/02
Version: 4/22/02
Report Date: 8/1/2016