Loading...
HomeMy WebLinkAboutItem3_Lot5 Lot Closure Report - Lot : Lot 5 ================================= file- C:\Users\Eric Jorgenson\Desktop\Site\2017\17407 Limelite FSP\DWG\SP\SP17407.msj\lc_Lot 5.txt Friday, September 22, 2017, 9:54:13a.m. Starting location (North, East) = ( 169951.99, 1305212.52 ) (In the table below, the Length of Curves refers to the chord length. and the Bearing of Curves refers to the chord bearing.) Leg Segment Bearing Length Front End_Northing End_Easting --- -------- ------- ------ ----- ------------ ----------- 1 Line S88°23'09"E 101.30 No 169949.14 1305313.78 2 Line S01°32'33"W 50.00 No 169899.16 1305312.43 3 Line N88°23'09"W 101.29 No 169902.01 1305211.18 4 Line N01°31'57"E 50.00 No 169951.99 1305212.52 Ending location (North, East) = ( 169951.99, 1305212.52 ) Total Distance : 302.59 Total Traverse Stations : 5 Misclosure Direction : N87°51'38"W (from ending location to starting location) Misclosure Distance : 0.00 Error of Closure : 1:237620.8 Frontage : 0.00 Frontage/Perimeter : 0.0 percent AREA : 5064.714 sq. ft. (straight segment added to close traverse) = 0.116270 Acres ***********