Loading...
HomeMy WebLinkAboutPermitDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Building Permit: B21005453 IVR Number: 21005453 Permit Information Permit Name: T-MOBILE GENERATOR PAD 1755 NE 48TH ST Address/Location:11/10/2021Application Date:3343301125Parcel Number: 1755 NE 48TH ST Permit Type:03/28/2023Issue Date:BLD - BUILDING Permit Work Class:03/27/2024Expiration Date:45Total Square Feet: Commercial - New Description: INSTALL CONCRETE PAD FOR DEISEL GENERATOR Contacts Name Address PhoneTypeBilling Ricquel Cardoza LDC, Inc. 1851 Central Pl S, 101 Kent, WA 98030 C: (206) 713-1626Contact RICK CARDOZA LDC ENGINEERING 20210 142nd Ave NE Woodinville, WA 98072 B: (253) 218-9017ContactX MARK BAYSINGER VELEX INC B: (703) 650-7777Contractor Construction Contractor: VELEXI*865NO Electrical Contractor: VELEXI*798QB PUBLIC STORAGE PO BOX 25025 Glendale, CA 91201 Owner General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton codes and ordinances. Ÿ Call 425.430.7202 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ (Date)(Signature) Page 1 of 2THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Building Permit: B21005453 IVR Number: 21005453 Inspections -Call (425) 430-7202 or go to: https://permitting.rentonwa.gov to schedule an inspection. -Call before work is concealed or concrete poured. -Do not pour concrete until approved. -Do not cover until approved. -Do not occupy until final inspection is complete. -Final inspection is required. Number CommentsInspectorDateDescription Erosion Control Inspection105 Footing Inspection110 Electrical Ufer Ground Inspection155 Foundation Inspection111 Underfloor Inspection156 Shearwall and GWB Nailing Inspection113 Roof Inspection115 Framing Inspection112 Insulation Inspection114 Ceiling Inspection116 Landscaping Inspection118 Critical Areas Inspection124 Other Building Inspection108 Final Inspection104 Page 2 of 2THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES