Construction Inspection Check List
Lighting Contractor call 425-430-7203 for inspections 1-5
Date of
Inspection:
Initials of
Inspector
If Accepted
CONSTRUCTION PERMIT#
COMMENTS
1. Pole Foundations
2. Base Bolts
3. Cabinet foundation and Type
Electrical Construction Inspection Check List
Lighting Contractor call 425-430-7202 for inspections 6-10
Date of
Inspection:
Initials of
Inspector
If Accepted
ELECTRICAL PERMIT#
COMMENTS
4. Junction Box/Conduit Size, Type, Burial
5. Conductors Size, Insulation, Type
6. Electrical service panel – including address
7. Grounding and connections
8. Wire/Splices/Fuses
9. Megger Test Report
Operations Construction Inspection Check List
Lighting Contractor call 425-430-7423 for inspections 11-14
Date of
Inspection:
Initials of
Inspector
If Accepted
COMMENTS
10. Fixture and associated parts
11. Poles for plumb/nut covers
12. Elevation/stationing correct
13. Poles numbered
14. Check for damage
15. Final Street Lighting Inspection for Project
By Transportation Maintenance
Contractor Address: Meg Reading:
Service Connection Address: Date:
Service Wire Size: Number of Poles:
Service Transformer Grid #: Wattage:
Comments: Panel Rating: