Loading...
HomeMy WebLinkAboutlumincheklist2015final CONTACT: PHONE: EMAIL:  INSPECTOR NAMES: const/elect/maintenance / / ELECTRICAL CONTRACTORS NAME:  PROJECT NAME(s): DATE OF INSPECTION COMPLETION:  LOCATION:  NOTE: Check to insure the following is installed as outlined in section 8 & 9 of the Standard Specifications, conforms with Renton Standard details and is installed per the approved plans. Please attach any punch lists created.  Construction Inspection Check List Lighting Contractor call 425-430-7203 for inspections 1-5 Date of Inspection: Initials of Inspector If Accepted CONSTRUCTION PERMIT# COMMENTS  1. Pole Foundations     2. Base Bolts     3. Cabinet foundation and Type     Electrical Construction Inspection Check List Lighting Contractor call 425-430-7202 for inspections 6-10 Date of Inspection: Initials of Inspector If Accepted ELECTRICAL PERMIT# COMMENTS  4. Junction Box/Conduit Size, Type, Burial     5. Conductors Size, Insulation, Type     6. Electrical service panel – including address      7. Grounding and connections      8. Wire/Splices/Fuses      9. Megger Test Report     Operations Construction Inspection Check List Lighting Contractor call 425-430-7423 for inspections 11-14 Date of Inspection: Initials of Inspector If Accepted  COMMENTS  10. Fixture and associated parts     11. Poles for plumb/nut covers     12. Elevation/stationing correct     13. Poles numbered     14. Check for damage     15. Final Street Lighting Inspection for Project By Transportation Maintenance     Contractor Address: Meg Reading: Service Connection Address: Date: Service Wire Size: Number of Poles: Service Transformer Grid #: Wattage: Comments: Panel Rating: Maintenance Supervisor’s Initials: