Loading...
HomeMy WebLinkAboutPermit Revision Drainage Memo Combined (2019-02-22) February 22, 2019 City of Renton-Utility Systems Division 1055 South Grady Way Renton, WA 98057 RE Southport Office Permit Revision to Stormwater Plan Dear Rohini Nair: I am writing to inform you of the changes to the stormwater plan resulting from the permit revision to the Southport Office project to add a small amount of bus parking along the onsite private roadway Southport Bristol Avenue. The revision is an owner-driven change to promote alternative transportation options within the development. The permit revision proposes to add a 100-foot long section of bus parking just north of office tower 3. The revision also proposes to extend the current planned parking section east of office tower 3 from 60 feet long to 160 feet long. The change increases impervious area by 1,874 square feet. The effect on stormwater design is explained in the next paragraph. Flow Control: As previously stated, there is less than 2,000 square feet of change in overall impervious surface. Further, the project is exempt from flow control requirements through direct discharge to Lake Washington so the effect on flow control is not a concern. Water Quality: The water quality system for the area being revised consists of a water quality vault that treats the runoff from road, parking, sidewalks, and landscape areas. The vault is designed under the assumption of 100% pollution-generating impervious area for the area it treats. The overall area routed to the water quality vault is not changing under this revision, so the small increase in impervious pollution-generating area does not affect the design of the water quality system. The water quality vault has the capacity to treat the stormwater runoff from 4.33 acres of pollution-generating impervious surface and the project still proposes to route only 3.51 acres of site area to the water quality vault. The water quality plan, water quality areas, and supporting calculations from the TIR are attached for your review. We can provide a copy of the complete TIR for your review if desired, however the city should have this document on file. I hope you will consider the small magnitude of this design change and find this memorandum to be adequate explanation and evidence that this revision will have no negative effects on the current drainage design. Sincerely, COUGHLIN PORTER LUNDEEN, INC. Bart Balko, PE Project Manager LEGEND g. Call befo D or 1-80 UNDER SER Description Impervious Area Pervious Area Quantity 4,515 SF 5,688 SF CURRENT PERMITTED PROPOSED CONDITIONS PI V A B C D E F G HGARAGE ENTRY FF=32.00 FF=33.50 17 1817.8 J K L M N P Q R S T FF=33.50 40' REVISED PROPOSED CONDITIONS LEGEND g. Call befo D or 1-80 UNDER SER Description Impervious Area Pervious Area Quantity 6,389 SF 3,680 SF 40' PI V A B C D E F G HGARAGE ENTRY FF=32.00 FF=33.50 J K L M N P Q R S T FF=33.50 Scale: 1"=100' FIGURE 5A PROPOSED WATER QUALITY LEGEND Description Area Routed to Ex Wetvault Area Routed to Ex Filterra Quantity 3.51 Acres 2.55 Acres g. 8-1- D or 1-800-424-5 UNDERGROU SERVICE (U BOEING PROPERTY BRISTOL PROPERTY BRISTOL PROPERTY PUGET SOUND ENERGY PROPERTY THE HOTEL AT SOUTHPORT EXISTING WATER QUALITY VAULT TO TREAT 3.51 ACRES EXISTING STORMFILTER TO TREAT 2.55 ACRES 2001 SOUTHPORT MASTER PLAN2001 MASTER PLAN WATER QUALITY EXISTING WETVAULT CALCULATIONSFROM 2001 SOUTHPORT MASTER PLAN EXISTING WETVAULT CALCULATIONS FROM 2001 SOUTHPORT MASTER PLAN Southport Wetvault Sizing Calculations Following the procedure outlined in 6.4.1.1 of the King County Stormwater Design Manual: Step 1: Identify required wetpool volume factor 𝑒=3 (𝑟𝑖𝑛𝑎𝑒 𝑎𝑎𝑟𝑖𝑎) Step 2: Determine rainfall (R) for the mean annual storm 𝑅𝑟𝑖𝑛𝑒 𝐹𝑖𝑒𝑢𝑟𝑒 6.4.1.𝐴, 𝑅=0.47"= 0.039′ Step 3: Calculate runoff from the mean annual storm 𝑅𝑜=𝑅(0.9𝐴𝑖+0.25𝐴𝑡𝑑+0.10𝐴𝑡𝑑+0.01𝐴𝑜) 𝐴𝑖=190,000 𝑅𝐹 𝐴𝑡𝑑=0.00 𝑅𝐹 𝐴𝑡𝑑=0.00 𝑅𝐹 𝐴𝑜=0.00 𝑅𝐹 𝑅𝑜=( 0.039 𝐹𝑅)(0.9)(190,000 𝑅𝐹) 𝑅𝑜=6,669 𝐶𝐹 Step 4: Calculate required wetpool volume 𝑅𝑏=𝑒𝑅𝑜 𝑅𝑏=(3)(6,669 𝐶𝐹) 𝑅𝑏=20,007 𝐶𝐹 With inside dimensions of 178.5’ x 25’, and a live storage depth of 4.8’, the provided volume of the existing vault is approximately 21,420 CF, so, 21,420 𝐶𝐹>20,007 𝐶𝐹 𝑅𝑜𝑜𝑜𝑡𝑖𝑑𝑑𝑑>𝑅𝑜𝑑𝑜𝑡𝑖𝑜𝑑𝑑 Therefore, the existing vault is adequate for reuse as a wetvault to provide basic water quality treatment. Additionally, the existing wetvault must meet the requirements of City of Renton Amendment to KCSWDM Section 6.4.2. PROJECT Southport Hotel DESIGNED BY BGG DATE 04/01/2015 PROJECT NUMBER C140507-01 CLIENT MG2 CHECKED BY BSB SHEET OF Wetvault sized for 4.33 Acres UPDATED USING EXISTING VAULT SIZE FOR THE 2015 STORMWATER PLAN