HomeMy WebLinkAboutLWB PH3 - Bill of Sale SignedB N RY CO R/W FORMERLY N P OVER W 1/2 OF SEC LESS
POR LY SWLY OF LN EXTND SELY & RADIALLY TO C/L
TRACK FR SUR STN 1068+00 & LY SELY OF LN BAAP ON
ABOVE LN 25 FT SELY FR SD STN TH STRAIGHT SWLY TAP
25 FT NWLY MEAS FR SELY R/W LN AT SUR STN 1074+00
TH SWLY TAP ON NWLY R/W LN & SELY OF SPUR TR STN
8+85.5 & TERM
WTR -N/A
WWP - N/A
SWP - 4005
TRO - 4005
TED - 4005
PROJECT NAME:
CONSTRUCTION PERMIT NO.
PROJECT FILE NUMBER:
ROADWAY, STREET LIGHTS AND SIGNALS
DESCRIPTION QTY UNIT TOTAL COST
Curb and Gutter 283 L.F.4,174.25$
Sidewalk 0 S.Y.-$
Asphalt Concrete Pavement 1405 S.Y.40,343.57$
Monument Case and Cover 0 EA.-$
Traffic Signs - Complete System 1 L.S.10,000.00$
Number of Luminaires and Poles 1 EA.40,000.00$
Subtotal 94,517.82$
Sales Tax 8,979.19$
Grand Total Roadway, Street Lights and Signals 103,497.01$
STORMWATER SYSTEM IMPROVEMENTS
QTY UNIT SIZE TYPE TOTAL COST
65 L.F.48"Concrete Storm Drainage Pipe 13,325.00$
2 EA.48"TYPE 1 Catch Basin 3,000.00$
Subtotal 16,325.00$
Sales Tax 1,550.88$
Grand Total Stormwater System Improvements 17,875.88$
STORMWATER FACILITIES
QTY UNIT ITEM TOTAL COST
2 EA.Wetpond 46,500.00$
2 EA.StormFilter 25,900.00$
Subtotal 72,400.00$
Sales Tax 6,878.00$
Grand Total Stormwater System Improvements 79,278.00$
Per the request of the City of Renton the following information is furnished concerning final costs for
improvements installed and turned over to the City for the referenced project.
DESCRIPTION
(City Staff Use Only)
EXHIBIT "B"
Contributary Assets
City Project Numbers:
Southport Lake Washington Blvd Improvements
C17-004398
PR14000082
Return Address:
City Clerkâs Office
City of Renton
1055 South Grady Way
Renton, WA 98057
Page 1 of 1