Loading...
HomeMy WebLinkAboutLWB PH3 - Bill of Sale SignedB N RY CO R/W FORMERLY N P OVER W 1/2 OF SEC LESS POR LY SWLY OF LN EXTND SELY & RADIALLY TO C/L TRACK FR SUR STN 1068+00 & LY SELY OF LN BAAP ON ABOVE LN 25 FT SELY FR SD STN TH STRAIGHT SWLY TAP 25 FT NWLY MEAS FR SELY R/W LN AT SUR STN 1074+00 TH SWLY TAP ON NWLY R/W LN & SELY OF SPUR TR STN 8+85.5 & TERM WTR -N/A WWP - N/A SWP - 4005 TRO - 4005 TED - 4005 PROJECT NAME: CONSTRUCTION PERMIT NO. PROJECT FILE NUMBER: ROADWAY, STREET LIGHTS AND SIGNALS DESCRIPTION QTY UNIT TOTAL COST Curb and Gutter 283 L.F.4,174.25$ Sidewalk 0 S.Y.-$ Asphalt Concrete Pavement 1405 S.Y.40,343.57$ Monument Case and Cover 0 EA.-$ Traffic Signs - Complete System 1 L.S.10,000.00$ Number of Luminaires and Poles 1 EA.40,000.00$ Subtotal 94,517.82$ Sales Tax 8,979.19$ Grand Total Roadway, Street Lights and Signals 103,497.01$ STORMWATER SYSTEM IMPROVEMENTS QTY UNIT SIZE TYPE TOTAL COST 65 L.F.48"Concrete Storm Drainage Pipe 13,325.00$ 2 EA.48"TYPE 1 Catch Basin 3,000.00$ Subtotal 16,325.00$ Sales Tax 1,550.88$ Grand Total Stormwater System Improvements 17,875.88$ STORMWATER FACILITIES QTY UNIT ITEM TOTAL COST 2 EA.Wetpond 46,500.00$ 2 EA.StormFilter 25,900.00$ Subtotal 72,400.00$ Sales Tax 6,878.00$ Grand Total Stormwater System Improvements 79,278.00$ Per the request of the City of Renton the following information is furnished concerning final costs for improvements installed and turned over to the City for the referenced project. DESCRIPTION (City Staff Use Only) EXHIBIT "B" Contributary Assets City Project Numbers: Southport Lake Washington Blvd Improvements C17-004398 PR14000082 Return Address: City Clerk’s Office City of Renton 1055 South Grady Way Renton, WA 98057 Page 1 of 1