HomeMy WebLinkAboutPre-app Mtg Summary - 23-000088.pdf1
PRE-APPLICATION MEETING FOR
Taxiway A Reconstruction/Rehabilitation and
Associated Improvements
PRE23-000088
CITY OF RENTON
Department of Community & Economic Development
Planning Division
April 13, 2023
Contact Information:
Planner: Alex Morganroth, 425-430-7219, amorganroth@rentonwa.gov
Public Works Plan Reviewer: Michael Sippo, 425-430-7298, msippo@rentonwa.gov
Fire Prevention Reviewer: Corey Thomas, 425-276-9582, cthomas@rentonrfa.org
Building Official: Rob Shuey, 425-430-7290, rshuey@rentonwa.gov
Please retain this packet throughout the course of your project as a reference. Consider
giving copies of it to any engineers, architects, and contractors who work on the
project. You will need to submit a copy of this packet when you apply for land use
and/or environmental permits.
Pre-screening: When you have the project application ready for submittal, call and
schedule an appointment with the project manager to have it pre-screened before
making all of the required copies.
The pre-application meeting is informal and non-binding. The comments provided on
the proposal are based on the codes and policies in effect at the time of review. The
applicant is cautioned that the development regulations are regularly amended and the
proposal will be formally reviewed under the regulations in effect at the time of project
submittal. The information contained in this summary is subject to modification and/or
concurrence by official decision-makers (e.g., Hearing Examiner, Planning Director,
Development Services Director, Department of Community & Economic Development
Administrator, Public Works Administrator and City Council).
2
Renton Regional
Fire Authority
M E M O R A N D U M
DATE: April 3, 2023
TO: Alex Morganroth, Senior Planner
FROM: Corey Thomas, Lead Plans Review Inspector
SUBJECT: Renton Airport Taxiway A Replacement
1. Existing water main and fire hydrants in Taxiway A is a private water system and shall be
maintained or replaced. If it is replaced with another private water main system, then separate
plans and permits will be required by the fire department. If it is replaced with a public water
system, then the plans and permits are subject to review and approval of the Renton public
utilities department.
3
DEPARTMENT OF COMMUNITY
& ECONOMIC DEVELOPMENT
M E M O R A N D U M
DATE: April 7, 2023
TO: Alex Morganroth, Senior Planner
FROM: Michael Sippo, Civil Engineer III
SUBJECT: Utility and Transportation Comments for Taxiway A
Reconstruction/Rehabilitation and Associated Improvements
APN PID 0723059007
PRE23-000088
NOTE: The applicant is cautioned that information contained in this summary is preliminary and non-binding and
may be subject to modification and/or concurrence by official City decision-makers. Review comments may also
need to be revised based on site planning and other design changes required by City staff or made by the applicant.
I have reviewed the application for Taxiway A Reconstruction/Rehabilitation and Associated Improvements at
APN 0723059007 and have the following comments:
WATER
1. Water service is provided by City of Renton in the Kennydale 308-hydraulic pressure zone.
2. There is an existing 16-inch City water main that bisects the project area and runway just north of 622 W
Perimeter Road building (see City water project plan no. W-0799). The maximum capacity of the 16-inch
water main is 4,500 gallons per minute (gpm). The static water pressure is approximately 119 psi at a ground
elevation of 25 feet.
3. The proposed project area is serviced from an existing privately-owned 12-inch-high pressure water main
that provides the required fire protection for Taxiway A and the Runway.
4. Based on the review of project information submitted for the pre-application meeting, Renton Regional Fire
Authority has determined that the preliminary fire flow demand will remain unchanged for the site,
including the use of an automatic fire sprinkler system.
5. The project proposes to remove and replace the existing water main. All improvements shall be coordinated
with the owner of this high-pressure water main. Applicant shall submit water main relocation plans to
owner of high-pressure water main for review and approval. Approved plans shall be submitted to the
City of Renton prior to Civil Permit issuance.
SEWER
1. Wastewater service is provided by the City of Renton.
2. There is an existing a public 8” sewer main that service the buildings on the south portion of W perimeter
Road (Reference COR Project File(s) S-1688). An existing 6-inch sewer main maintained by the Airport that
services the buildings on the north portion of W perimeter Road. Currently there are no sewer mains that
provide service to the project area.
3. There is an existing 24” King County sewer main in a 40” casing that bisects the project area and runway
north of 860 W Perimeter Road building. City information on drawing S-0708 shows that the line is about
4
25’ deep, however, since King County is the owner applicant should coordinate depth and proposal with
the owner to determine if any additional requirements are warranted.
4. The project currently does not propose a connection to the City of Renton system. If this changes, additional
requirements will be warranted.
5. Any dewatering activity that is proposed to be discharged to the sewer system, must receive approval from
the City and King County Industrial Waste Program before discharge.
SURFACE WATER
1. There is an existing private conveyance system that provides drainage to the project that is maintained by
the Airport.
2. The site falls within Zone 2 of the City’s Aquifer Protection Area (APA). In this zone facility lines may be
required on surface water systems and facilities per RSWDM.
3. Refer to Figure 1.1.2.A – Flow Chart in the 2022 RSWDM to determine what type of drainage review is
required for this site. A drainage study complying with the 2022 City of Renton Surface Water Design
Manual (RSWDM) will be required. Based on the City’s flow control map, this site falls within the Flow
Control Standard (Existing Peak Conditions. The site is in the West Lake Washington – Seattle Drainage
basin. The flowpath from the project site discharge point is less than a half mile to the 100-year floodplain
of Lake Washington, therefore, the project may qualify for the direct discharge exemption in accordance
with Section 1.2.3.1 of the 2022 RSWDM if the project adheres to all requirements thereof. Drainage report
and drainage plans based on RSWDM are required to be provided. A preliminary drainage plan and drainage
report, including the application of flow control BMPs, shall be included with the land use application. The
final drainage plan and drainage report should be submitted with the civil construction permit application.
4. If the new plus replaced pollution generating impervious surface exceeds 5,000 SF, the applicant will be
required to provide enhanced basic water quality treatment. Any proposed detention and/or water quality
vault shall be designed in accordance with the RSWDM that is current at the time of civil construction permit
application. Separate structural plans will be required to be submitted for review and approval under a
separate building permit for the detention and/or water quality vault.
5. Any proposed detention and/or water quality vault shall be designed in accordance with the RSWDM that
is current at the time of civil construction permit application. Separate structural plans will be required to
be submitted for review and approval under a separate building permit for the detention and/or water
quality vault. Special inspection from the building department is required.
6. On-site BMPs satisfying Core Requirement #9 will be required for the site to the maximum extent feasible.
On-site BMPs as described in Section C.1.3 of the 2022 RSWDM. A preliminary drainage plan, including the
application of flow control BMPs, shall be included with the land use application, as applicable to the
project. The final drainage plan and drainage report must be submitted with the utility construction permit
application.
7. Any new storm conveyance installed on or off-site shall be designed and sized in accordance with standards
found in Chapter 4 of the 2022 RSWDM. New storm drains should be sized to accommodate future runoff
of all upstream tributary area.
8. A geotechnical report for the site is required and shall be submitted with the land use application.
Information concerning the soils, geology, drainage patterns, vegetation present, water table and soil
permeability, with recommendations of appropriate on-site BMP options with typical designs for the site
from the geotechnical engineer, shall be submitted with the application. The geotechnical report should
include an on-site infiltration test to clearly show if the site is suitable or unsuitable for infiltration. The
geotechnical report should discuss critical areas in the site and if there any wet season construction
restrictions.
9. All work proposed outside of the applicant’s property will require a permanent drainage easement to be
provided to the City and a temporary construction easement prior to any permits being issued.
10. A Construction Stormwater General Permit from Department of Ecology will be required if land disturbance
of the site exceeds one acre. A Stormwater Pollution Prevention Plan (SWPPP) is required for this site.
11. Erosion control measures to meet the City requirements shall be provided.
5
12. The current City of Renton Surface Water Standard Plans that shall be used in all drainage submittals are
available online at the City of Renton website.
13. The development is subject to stormwater system development charge (SDC) fee. The 2023 stormwater
SDC fee is $0.920 per square foot of new impervious surface, but no less than $2,300.00. This is payable
prior to issuance of the construction permit. The SDC fee that is current at the time of issuance of the
construction permit will be applicable.
TRANSPORTATION
1. The proposed project is interior to the property. W Perimeter Road is along the west property line(s) and
E Perimeter Road is along the east property line(s). Both roadways are private roads.
2. It is not anticipated that the proposed project would create any additional vehicle trips. However, if the
project proposal changes and results in additional vehicle trips, a traffic impact analysis is required when
the estimated vehicular traffic generated from a proposed development exceeds 20 vehicles per hour in
either the AM (6:00 – 9:00) or PM (3:00 – 6:00) peak periods. The analysis must include a discussion on
traffic circulation to and from the site and onsite traffic circulation. The study shall include trip generation
and trip distribution for the project for both AM and PM peak hours.
3. Paving and trench restoration shall comply with the City’s Trench Restoration and Overlay Requirements or
Federal Aviation Administration (FAA) standards, whichever is greater.
4. The transportation impact fee is based on the type of land use. Please see the City’s Fee Schedule:
https://edocs.rentonwa.gov/Documents/Browse.aspx?id=8217302&dbid=1&repo=CityofRenton.
Transportation impact fees are subject to change based on the year the permit is issued.
GENERAL COMMENTS
1. All existing and proposed utility lines (i.e. electrical, phone, and cable services, etc.) along property frontage
or within the site must be underground. The construction of these franchise utilities must be inspected and
approved by a City of Renton inspector.
2. Adequate separation between utilities as well as other features shall be provided in accordance with code
requirements:
a. 7-ft minimum horizontal and 1-ft vertical separation between storm and other utilities is required
except for water lines which require 10-ft horizontal and 1.5-ft vertical.
b. The stormwater line should be minimum 5 feet away from any other structure or wall or building.
c. Trench of any utility should not be in the zone of influence of the retaining wall or of the building.
3. All civil construction permits for utility and street improvements will require separate plan submittals. All
utility plans shall confirm to the Renton Drafting Standards. A licensed Civil Engineer shall prepare the civil
plans. Please visit the Development Engineering Forms page for the most up-to-date plan submittal
requirements:
https://www.rentonwa.gov/cms/one.aspx?portalId=7922741&pageId=9687014
4. A landscaping plan and tree retention shall be included with the civil plan submittal. Each plan shall be on
separate sheets.
5. Additional Building Permit Applications will be required for the following:
a. Any retaining walls that exceed 4 feet in height, as defined by RMC 4-4-040.
b. Detention vaults for storm water flow control.
c. Demo of any existing structures on the project site(s).
6. Fees quoted in this document reflect the fees applicable in the year 2020 only and will be assessed based
on the fee that is current at the time of the permit application or issuance, as applicable to the permit type.
Please visit www.rentonwa.gov for the current development fee schedule.
6
DEPARTMENT OF COMMUNITY
& ECONOMIC DEVELOPMENT
M E M O R A N D U M
DATE: April 13, 2023
TO: Pre-Application File No. 23-000088
FROM: Alex Morganroth, Senior Planner
SUBJECT: Taxiway A Reconstruction/Rehabilitation and Associated
Improvements
616 W Perimeter Rd (APN 0723059007) - Renton Municipal Airport
General: We have completed a preliminary review of the pre-application for the above-referenced development
proposal. The following comments on development and permitting issues are based on the pre-application
submittals made to the City of Renton by the applicant and the codes in effect on the date of review. The applicant
is cautioned that information contained in this summary may be subject to modification and/or concurrence by
official decision-makers (e.g., Hearing Examiner, Community & Economic Development Administrator, Public Works
Administrator, Planning Director, and City Council). Review comments may also need to be revised based on site
planning and other design changes required by City staff or made by the applicant. The applicant is encouraged to
review all applicable sections of the Renton Municipal Code. The Development Regulations are available online at
www.rentonwa.gov.
Project Proposal: The applicant, the City of Renton, is proposing a variety of maintenance and improvement
projects on the Renton Municipal Airport site. The airport site totals 152.5 acres in area and is located within the
Medium Industrial (IM) zone. The site is within the Comprehensive Plan Employment Area land use designation.
The proposed work is primarily located within the taxiway and infield areas on the western portion of the site and
would include airfield pavement rehabilitation, service road rehabilitation, drainage improvements, lighting
upgrades, signage upgrades, and a water line upgrade. According to the applicant, the proposed grading would
result in approximately 40,000 cubic yards of excavation within existing paved and in-field areas. Work is proposed
within 100 feet of the Lake Washington ordinary high water mark, but no in-water work is proposed. A high seismic
hazard area, sensitive and protected slopes, a Special Flood Hazard Area, and Wellhead Protection Area Zone 2 are
mapped on the site according to COR Maps. In addition, the proposed improvements are located within Reach J of
Lake Washington with an Environmental Designation of Shoreline High Intensity. Lake Washington is classified as a
Shoreline of the State.
Current Use: A municipal airport and supporting uses are located on the site.
Zoning: The Renton Municipal Airport site is located in Medium, Industrial (IM) zoning designation and Employment
Area Comprehensive Plan Land Use Designation. A Municipal Airport is a permitted use in the IM zone.
Development Standards: The project would be subject to RMC 4-2-130A, “Development Standards for Industrial
Zoning Designations” Due to the nature of the subject project, which does include the construction or alteration of
any structures and primarily consists of maintenance work, certain standards as density, setbacks, and lot size are
not applicable. As such, the following report addresses only those development standards that appear to be
applicable at this time.
Critical Areas: The subject project is located is adjacent to Lake Washington and the Cedar River, both Shorelines
of the State. As such, the project is required to comply with the City of Renton’s Shoreline Master Program (SMP).
Based on the site plan submitted by the applicant, the work proposed would be located within the Shoreline High
7
Intensity designation, Reach J of Lake Washington. No work appears to be located within the Cedar River shoreline
jurisdiction. The subject project may result in impacts to Lake Washington, as such a lake study and a mitigation
plan identifying “no net loss” would be required with the project application.
COR maps indicates the site is located in a high seismic hazard area with the potential for sensitive or steep slopes.
The seismic hazard is related to potential liquefaction of soils during an earthquake event. A geotechnical analysis
for the site is required. The analysis needs to assess soil conditions, stability, and detail construction measures to
assure stability.
The site is located within the Wellhead Protection Area Zone 2. A fill source statement will be required for any
offsite soils brought to the site.
According to City of Renton (COR) Maps the airport site is mapped with a Special Flood Hazard Area (100 year flood)
FEMA Zone –AE. Development proposals and other alterations shall not reduce the effective base flood storage
volume of the floodplain. If grading or other activity will reduce the effective storage volume, compensatory storage
shall be created on the site or off the site if legal arrangements can be made to assure that the effective
compensatory storage volume will be preserved over time. Future improvements would be required to comply
with Flood Hazard Area standards related to flood proofing, compensatory storage, and construction techniques
capable of resisting hydrostatic and hydrodynamic loads. In addition, work may be proposed in the identified
floodway (separate from Special Flood Hazard Area). If work is proposed in the floodway or floodplain, a Floodplain
Biological Assessment shall be provided with the land use application. All new construction and substantial
improvements shall be anchored to prevent flotation, collapse, or lateral movement of the structure resulting from
hydrodynamic and hydrostatic loads including the effects of buoyancy.
Based on the applicant’s submittal, no work is proposed within the flood hazard area.
It is the applicant’s responsibility to ascertain if any other critical areas or environmental concerns are present on
the site during site development or building construction.
Shoreline Regulations (RMC 4-3-090): The objective of the High Intensity Overlay is to provide opportunities for
large-scale office and commercial employment centers as well as multi-family residential use and public services.
This district provides opportunities for water-dependent and water-oriented uses while protecting existing
ecological functions and restoring ecological functions in areas that have been previously degraded. Development
may also provide for public use and/or community use, especially access to and along the water's edge.
Roads are a permitted use in the Shoreline High Intensity overlay, the following standards apply to new roads within
the Shoreline Jurisdiction:
General Standards: New and expanded transportation facilities shall be designed to achieve no net loss of ecological
functions within the shoreline. To the maximum extent feasible the following standards shall be applied to all
transportation projects and facilities:
i. Facilities shall be located outside of the shoreline jurisdiction and as far from the land/water interface as
possible. Expansion of existing transportation facilities shall include analysis of system options that assess
the potential for alternative routes outside shoreline jurisdiction or set back further from the land/water
interface.
ii. Facilities shall be located and designed to avoid significant natural, historical, archaeological, or cultural
sites, and mitigate unavoidable impacts.
iii. Facilities shall be designed and maintained to prevent soil erosion, to permit natural movement of
groundwater, and not adversely affect water quality or aquatic plants and animals over the life of the
facility.
iv. All debris and other waste materials from construction shall be disposed of in such a way as to prevent
their entry by erosion into any water body and shall be specified in submittal materials.
v. Facilities shall avoid the need for shoreline protection.
8
vi. Facilities shall allow passage of flood waters, fish passage, and wildlife movement by using bridges with
the longest span feasible or when bridges are not feasible, culverts and other features that provide for these
functions.
vii. Facilities shall be designed to accommodate as many compatible uses as feasible, including, but not
limited to: utilities, viewpoint, public access, or trails.
Aviation (for taxiways and in-field areas):
i. Prohibited Near Natural or Urban Conservancy Areas: Aviation facilities are prohibited within two hundred
feet (200') of a Natural or Urban Conservancy Shoreline Overlay District.
ii. Airports:
(a) A new airport shall not be allowed to locate within the shoreline; however, an airport already
located within a shoreline shall be permitted.
(b) Upgrades of facilities to meet FAA requirements or improvements in technology shall be
permitted.
(c) Facilities to serve seaplanes may be included as an accessory use in any existing airport.
(d) Helipads may be included as an accessory use in any existing airport.
(e) Aviation-related manufacturing shall be permitted in an airport.
(f) New or upgraded airport facilities shall be designed and operated such that:
(1) All facilities that are non-water-dependent shall be located outside of shoreline
jurisdiction, if feasible. When sited within shoreline jurisdiction, uses and/or developments
such as parking, hangars, service buildings or areas, access roads, utilities, signs, and
storage of materials shall be located as far from the land/water interface as feasible. The
minimum setback shall be twenty feet (20') from the OHWM of the shoreline and shall be
designed and spaced to allow viewing of airport activities from the area along the water’s
edge.
(2) New or upgraded airport facilities shall minimize impacts on shoreline ecological
functions, including control of pollutant discharge. The standards for water quality and
criteria for application shall be those in current stormwater control regulations.
(3) New facilities dispensing fuel or facilities associated with use of hazardous materials
shall require a Shoreline Conditional Use Permit.
iii. Seaplanes:
(a) Private:
(1) Operation of a single private seaplane on waters where FAA has designated a seaplane
landing area is not regulated by the Shoreline Master Program.
(2) Moorage of a seaplane is addressed in subsection E7 of this Section, Piers and Docks.
(b) Commercial: New commercial seaplane facilities, including docks and storage area bases, may
be allowed in industrial areas provided such bases are not contiguous to residential areas and
provided they meet standards in subsection E7 of this Section, Piers and Docks.
Roads (for perimeter access road improvements):
i. New public or private roads and driveways shall be located inland from the land/water interface,
preferably out of the shoreline, unless:
(a) Perpendicular water crossings are required for access to authorized uses consistent with the
Shoreline Master Program; or
9
(b) Facilities are primarily oriented to pedestrian and nonmotorized use and provide an opportunity for
a substantial number of people to enjoy shoreline areas, and are consistent with policies and
regulations for ecological protection.
ii. Road locations shall be planned to fit the topography, where possible, in order that minimum alteration
of existing natural conditions will be necessary.
iii. RCW 36.87.130 prohibits vacation of any right-of-way that abuts freshwater except for port, recreational,
educational or industrial purposes. Therefore, development, abandonment, or alteration of undeveloped
road ends within Shoreline Master Program jurisdiction is prohibited unless an alternate use is approved in
accordance with the Shoreline Master Program.
Utilities (for water line upgrade and drainage conveyance system upgrades): Underground Utilities, including
stormwater outfalls and conveyance pipes, are an exempt activity from buffers and setbacks. Utilities must be
constructed and maintained in a manner than minimizes adverse impacts on shoreline ecological functions.
Environmental Review: The proposal exceeds the City’s adopted categorical exemption thresholds (RMC 4-9-070G)
and is subject to State Environmental Policy Act (SEPA) Review in accordance with WAC 197-11-800. An
Environmental Checklist must be submitted with the proposal and the City’s Environmental Review Committee is
required to issue a Threshold Determination prior to any issuance for permits on the site.
Permit Requirements: The proposal would require Environmental (SEPA) Review and a Shoreline Exemption. The
applications would be reviewed concurrently in an estimated time frame of eight (8) weeks following acceptance
of a complete application. The 2023 Environmental Review fee is $1,800.00. There is no fee for a Shoreline
Exemption application. Any modification requests to code standards are $290.00 per modification. A 5% technology
fee would also be assessed at the time of land use application. All fees are subject to change.
Detailed information regarding the land use application submittal can be found on the City’s permitting webpage
and other informational applications and handouts can be found on the City’s Digital Records Library. The City
requires electronic plan submittal for all applications. Please refer to the City’s Electronic File Standards.
In addition to the required land use permits, separate construction and building permits may be required.
Next Steps: When the formal application materials are complete, the applicant shall have the materials pre-
screened virtually prior to submitting the complete application package. Please contact Alex Morganroth, Senior
Planner at 425-430-7219 or amorganroth@rentonwa.gov to schedule a virtual prescreen appointment.
Expiration: Shoreline exemptions do not expire. Environmental (SEPA) Review determinations do not expire.