HomeMy WebLinkAboutSEWER REPORT 2rp 7-
01NS'LILL 1'J'10N
SI;RVTFI:*, INC.
Puget Construction
Services
1609 central ave s
Phone: 253-856-2572
Fax: 253-859-5087
Main Inspections
Pipe Run and
Map
PrniPrf name-
M iinlinA Tr\
Street:
HOMEDEPOT JBD
SSMH 1 TO SSMH-2
RENTON
901 S GRADY WAY
04-11-2023
Start date/time:
Direction:
Location code:
4/11/2023 8:03 AM
U
3
Material:
helgnt:
Width:
C
PVC
8 in.
8 in.
cl!� cl!�
G O
C, �
00 44
ff) r s
an 0)
G C
zz
Q} �
t4
Ln
AMH'SSMH 2'
Stopped at 369.0 ft. against flow4 At 389.0 ft.
on 4/1112023 8:28:59 AM — IH - Manhole
Comments: SSh4H 2 REACHED
Started at i10 ft. against Flow +
-on 4111/2023 8:03:45 AM —
AMK'SSMH 1'
4 At 0.0 ft.
AMH - Manhole
Comments: SSMH 1
At 0.0 ft.
MWL - Water Level
4&6 FL
97.3 FL
1.45.9
ft-
194rS ft.
243.1 ft.
291.a ft.
34-0.4 fE
Main Inspections Pipe Run and Map Page 1 of 1