Loading...
HomeMy WebLinkAboutLetter 2-16-17 DETAILS COMMENTS – SHEET 9 1. No comments on this sheet. DETAILS COMMENTS – SHEET 10 1. No comments on this sheet. TESC PLAN COMMENTS – SHEET 11 1. Show additional silt fence as redlined. Done. 2. Show which trees are being retained on this plan sheet. Adjust clearing limits to account for trees that are being removed. Done. 3. Two of the catch basins that are labeled to have inlet protection appear to have solid locking lids. Fixed. 4. Linework for some of the disturbance limits appears to be backwards. It can be hard to tell which area is in the clearing limits. It seems right to me, the line represents bushes. 5. Provide a legend for the silt fence and disturbance limits linework. Done. 6. Add Note 17 – All ESC measures must be removed after construction activity is complete. Done. 7. Update construction sequence as redlined. Done. TESC DETAILS COMMENTS – SHEET 12 1. No comments on this sheet. LANDSCAPE PLANS COMMENTS – SHEETS 13-14 1. Use City of Renton title block for landscape plans. 2. Per the preliminary short plat decision, the applicant was proposing to retain a total of 12 significant trees, which exceeded the tree retention requirement of 8 trees. The current proposal to retain 4 trees is significantly less than the original proposal to retain 12 trees. Please submit a revised tree retention plan showing the retention of 8 trees (as approved under the preliminary short plat decision) or submit an arborist report detailing why additional trees cannot be retained. Eight trees are now shown to be retained. The landscape architect will revise the landscape plan when the newly proposed stormwater vault and proposed retained trees are accepted. 3. Please add the following tree protection measures to the Tree Retention Plan: Done. The following notes were added to the tree retention plan, along with a tree protection fence detail.