HomeMy WebLinkAboutCarpenter Short Plat TIR Utility I CommentsMarkup Summary
Subject: Text Box
Page: Page 6
Lock: Unlocked
Status:
Checkmark: Unchecked
Author: IFitz-James
Date: 9/15/2016 8:34:05 AM
Color:
Depth:
REVISE PLAN AS NECESSARY.
Subject: Cloud
Page: Page 6
Lock: Unlocked
Status:
Checkmark: Unchecked
Author: IFitz-James
Date: 9/15/2016 8:34:11 AM
Color:
Depth:
Subject: Text Box
Page: Page 36
Lock: Unlocked
Status:
Checkmark: Unchecked
Author: IFitz-James
Date: 9/15/2016 8:34:46 AM
Color:
Depth:
PROVIDE A BASIN MAP SHOWING TDA 1 AND
2
Subject: Cloud
Page: Page 36
Lock: Unlocked
Status:
Checkmark: Unchecked
Author: IFitz-James
Date: 9/15/2016 8:34:51 AM
Color:
Depth:
Subject: Text Box
Page: Page 40
Lock: Unlocked
Status:
Checkmark: Unchecked
Author: IFitz-James
Date: 9/15/2016 8:40:14 AM
Color:
Depth:
PROVIDE A DEVELOPED BASIN MAP
SHOWING PERVIOUS SURFACES,
IMPERVIOUS SURFACES , AND POLLUTION
GENERATING IMPERVIOUS SURFACES.
REVISE PLAN ASNECESSARY.
PROVIDE A BASIN MAP
SHOWING TDA 1 AND 2
PROVIDE A DEVELOPED BASIN MAPSHOWING PERVIOUS SURFACES,IMPERVIOUS SURFACES , AND POLLUTIONGENERATING IMPERVIOUS SURFACES.
Subject: Cloud
Page: Page 40
Lock: Unlocked
Status:
Checkmark: Unchecked
Author: IFitz-James
Date: 9/15/2016 8:40:14 AM
Color:
Depth:
Subject: Cloud
Page: Page 40
Lock: Unlocked
Status:
Checkmark: Unchecked
Author: IFitz-James
Date: 9/15/2016 8:35:33 AM
Color:
Depth:
Subject: Callout
Page: Page 40
Lock: Unlocked
Status:
Checkmark: Unchecked
Author: IFitz-James
Date: 9/15/2016 8:38:06 AM
Color:
Depth:
EXPLAIN HOW FLOW CONTROL FOR THE
DRIVEWAY DRAINAGE IS BEING PROVIDED.
Subject: Callout
Page: Page 40
Lock: Unlocked
Status:
Checkmark: Unchecked
Author: IFitz-James
Date: 9/15/2016 8:41:02 AM
Color:
Depth:
UPDATE FLOW CONTROL CALCULATIONS TO
ACCOUNT FOR A FULLY PAVED 16' DRIVE
AISLE FOR THE EXTENTS OF THE PROJECT.
YOU MIGHT WANT TO CONSIDER THE USE OF
PERVIOUS PAVEMENT FOR THE DRIVE AISLE.
Subject: Cloud
Page: Page 46
Lock: Unlocked
Status:
Checkmark: Unchecked
Author: IFitz-James
Date: 9/15/2016 9:13:20 AM
Color:
Depth:
Subject: Callout
Page: Page 46
Lock: Unlocked
Status:
Checkmark: Unchecked
Author: IFitz-James
Date: 9/15/2016 9:15:27 AM
Color:
Depth:
THE GEOTECHNICAL REPORT STATES THAT
AN OVERFLOW SYSTEM SHALL BE INCLUDED
IN THE DESIGN. REVISE DESIGN OR PROVIDE
GEOTECHNICAL SUPPORT FOR A DESIGN
WITHOUT AN OVERFLOW SYSTEM.
EXPLAIN HOW FLOWCONTROL FOR THEDRIVEWAY DRAINAGE ISBEING PROVIDED.
UPDATE FLOW CONTROL CALCULATIONSTO ACCOUNT FOR A FULLY PAVED 16'DRIVE AISLE FOR THE EXTENTS OF THEPROJECT. YOU MIGHT WANT TOCONSIDER THE USE OF PERVIOUSPAVEMENT FOR THE DRIVE AISLE.
THE GEOTECHNICAL REPORTSTATES THAT AN OVERFLOWSYSTEM SHALL BE INCLUDEDIN THE DESIGN. REVISEDESIGN OR PROVIDEGEOTECHNICAL SUPPORT FORA DESIGN WITHOUT ANOVERFLOW SYSTEM.
Subject: Text Box
Page: Page 85
Lock: Unlocked
Status:
Checkmark: Unchecked
Author: IFitz-James
Date: 9/15/2016 9:24:17 AM
Color:
Depth:
PROVIDE A COPY OF THE UPDATED EROSION
CONTROL PLAN IN REPORT.
Subject: Cloud
Page: Page 85
Lock: Unlocked
Status:
Checkmark: Unchecked
Author: IFitz-James
Date: 9/15/2016 9:24:21 AM
Color:
Depth:
Subject: Text Box
Page: Page 86
Lock: Unlocked
Status:
Checkmark: Unchecked
Author: IFitz-James
Date: 9/15/2016 9:28:49 AM
Color:
Depth:
PROVIDE A COMPLETED BOND QUANTITY
WORKSHEET IN THE REPORT. THE CITY IS
USING A NEW BOND QUANTITY WORKSHEET.
IT HAS BEEN INCLUDED WITH YOUR
COMMENTS.
Subject: Cloud
Page: Page 86
Lock: Unlocked
Status:
Checkmark: Unchecked
Author: IFitz-James
Date: 9/15/2016 9:28:52 AM
Color:
Depth:
Subject: Text Box
Page: Page 88
Lock: Unlocked
Status:
Checkmark: Unchecked
Author: IFitz-James
Date: 9/15/2016 10:41:44 AM
Color:
Depth:
INCLUDE MAINTENANCE REQUIREMENTS
FOR CATCH BASINS FROM APPENDIX A OF
THE 2009 KCSWDM.
Subject: Cloud
Page: Page 88
Lock: Unlocked
Status:
Checkmark: Unchecked
Author: IFitz-James
Date: 9/15/2016 10:41:28 AM
Color:
Depth:
PROVIDE A COPY OF THE UPDATEDEROSION CONTROL PLAN IN REPORT.
PROVIDE A COMPLETED BOND QUANTITYWORKSHEET IN THE REPORT. THE CITY IS USING ANEW BOND QUANTITY WORKSHEET. IT HAS BEENINCLUDED WITH YOUR COMMENTS.
INCLUDE MAINTENANCE REQUIREMENTSFOR CATCH BASINS FROM APPENDIX AOF THE 2009 KCSWDM.
REVISE PLAN AS
NECESSARY.
PROVIDE A BASIN MAP
SHOWING TDA 1 AND 2
PROVIDE A DEVELOPED BASIN MAP
SHOWING PERVIOUS SURFACES,
IMPERVIOUS SURFACES , AND POLLUTION
GENERATING IMPERVIOUS SURFACES.
EXPLAIN HOW FLOW
CONTROL FOR THE
DRIVEWAY DRAINAGE IS
BEING PROVIDED.
UPDATE FLOW CONTROL CALCULATIONS
TO ACCOUNT FOR A FULLY PAVED 16'
DRIVE AISLE FOR THE EXTENTS OF THE
PROJECT. YOU MIGHT WANT TO
CONSIDER THE USE OF PERVIOUS
PAVEMENT FOR THE DRIVE AISLE.
THE GEOTECHNICAL REPORT
STATES THAT AN OVERFLOW
SYSTEM SHALL BE INCLUDED
IN THE DESIGN. REVISE
DESIGN OR PROVIDE
GEOTECHNICAL SUPPORT FOR
A DESIGN WITHOUT AN
OVERFLOW SYSTEM.
PROVIDE A COPY OF THE UPDATED
EROSION CONTROL PLAN IN REPORT.
PROVIDE A COMPLETED BOND QUANTITY
WORKSHEET IN THE REPORT. THE CITY IS USING A
NEW BOND QUANTITY WORKSHEET. IT HAS BEEN
INCLUDED WITH YOUR COMMENTS.
INCLUDE MAINTENANCE REQUIREMENTS
FOR CATCH BASINS FROM APPENDIX A
OF THE 2009 KCSWDM.