Loading...
HomeMy WebLinkAboutCarpenter Short Plat TIR Utility I CommentsMarkup Summary Subject: Text Box Page: Page 6 Lock: Unlocked Status: Checkmark: Unchecked Author: IFitz-James Date: 9/15/2016 8:34:05 AM Color: Depth: REVISE PLAN AS NECESSARY. Subject: Cloud Page: Page 6 Lock: Unlocked Status: Checkmark: Unchecked Author: IFitz-James Date: 9/15/2016 8:34:11 AM Color: Depth: Subject: Text Box Page: Page 36 Lock: Unlocked Status: Checkmark: Unchecked Author: IFitz-James Date: 9/15/2016 8:34:46 AM Color: Depth: PROVIDE A BASIN MAP SHOWING TDA 1 AND 2 Subject: Cloud Page: Page 36 Lock: Unlocked Status: Checkmark: Unchecked Author: IFitz-James Date: 9/15/2016 8:34:51 AM Color: Depth: Subject: Text Box Page: Page 40 Lock: Unlocked Status: Checkmark: Unchecked Author: IFitz-James Date: 9/15/2016 8:40:14 AM Color: Depth: PROVIDE A DEVELOPED BASIN MAP SHOWING PERVIOUS SURFACES, IMPERVIOUS SURFACES , AND POLLUTION GENERATING IMPERVIOUS SURFACES. REVISE PLAN ASNECESSARY. PROVIDE A BASIN MAP SHOWING TDA 1 AND 2 PROVIDE A DEVELOPED BASIN MAPSHOWING PERVIOUS SURFACES,IMPERVIOUS SURFACES , AND POLLUTIONGENERATING IMPERVIOUS SURFACES. Subject: Cloud Page: Page 40 Lock: Unlocked Status: Checkmark: Unchecked Author: IFitz-James Date: 9/15/2016 8:40:14 AM Color: Depth: Subject: Cloud Page: Page 40 Lock: Unlocked Status: Checkmark: Unchecked Author: IFitz-James Date: 9/15/2016 8:35:33 AM Color: Depth: Subject: Callout Page: Page 40 Lock: Unlocked Status: Checkmark: Unchecked Author: IFitz-James Date: 9/15/2016 8:38:06 AM Color: Depth: EXPLAIN HOW FLOW CONTROL FOR THE DRIVEWAY DRAINAGE IS BEING PROVIDED. Subject: Callout Page: Page 40 Lock: Unlocked Status: Checkmark: Unchecked Author: IFitz-James Date: 9/15/2016 8:41:02 AM Color: Depth: UPDATE FLOW CONTROL CALCULATIONS TO ACCOUNT FOR A FULLY PAVED 16' DRIVE AISLE FOR THE EXTENTS OF THE PROJECT. YOU MIGHT WANT TO CONSIDER THE USE OF PERVIOUS PAVEMENT FOR THE DRIVE AISLE. Subject: Cloud Page: Page 46 Lock: Unlocked Status: Checkmark: Unchecked Author: IFitz-James Date: 9/15/2016 9:13:20 AM Color: Depth: Subject: Callout Page: Page 46 Lock: Unlocked Status: Checkmark: Unchecked Author: IFitz-James Date: 9/15/2016 9:15:27 AM Color: Depth: THE GEOTECHNICAL REPORT STATES THAT AN OVERFLOW SYSTEM SHALL BE INCLUDED IN THE DESIGN. REVISE DESIGN OR PROVIDE GEOTECHNICAL SUPPORT FOR A DESIGN WITHOUT AN OVERFLOW SYSTEM. EXPLAIN HOW FLOWCONTROL FOR THEDRIVEWAY DRAINAGE ISBEING PROVIDED. UPDATE FLOW CONTROL CALCULATIONSTO ACCOUNT FOR A FULLY PAVED 16'DRIVE AISLE FOR THE EXTENTS OF THEPROJECT. YOU MIGHT WANT TOCONSIDER THE USE OF PERVIOUSPAVEMENT FOR THE DRIVE AISLE. THE GEOTECHNICAL REPORTSTATES THAT AN OVERFLOWSYSTEM SHALL BE INCLUDEDIN THE DESIGN. REVISEDESIGN OR PROVIDEGEOTECHNICAL SUPPORT FORA DESIGN WITHOUT ANOVERFLOW SYSTEM. Subject: Text Box Page: Page 85 Lock: Unlocked Status: Checkmark: Unchecked Author: IFitz-James Date: 9/15/2016 9:24:17 AM Color: Depth: PROVIDE A COPY OF THE UPDATED EROSION CONTROL PLAN IN REPORT. Subject: Cloud Page: Page 85 Lock: Unlocked Status: Checkmark: Unchecked Author: IFitz-James Date: 9/15/2016 9:24:21 AM Color: Depth: Subject: Text Box Page: Page 86 Lock: Unlocked Status: Checkmark: Unchecked Author: IFitz-James Date: 9/15/2016 9:28:49 AM Color: Depth: PROVIDE A COMPLETED BOND QUANTITY WORKSHEET IN THE REPORT. THE CITY IS USING A NEW BOND QUANTITY WORKSHEET. IT HAS BEEN INCLUDED WITH YOUR COMMENTS. Subject: Cloud Page: Page 86 Lock: Unlocked Status: Checkmark: Unchecked Author: IFitz-James Date: 9/15/2016 9:28:52 AM Color: Depth: Subject: Text Box Page: Page 88 Lock: Unlocked Status: Checkmark: Unchecked Author: IFitz-James Date: 9/15/2016 10:41:44 AM Color: Depth: INCLUDE MAINTENANCE REQUIREMENTS FOR CATCH BASINS FROM APPENDIX A OF THE 2009 KCSWDM. Subject: Cloud Page: Page 88 Lock: Unlocked Status: Checkmark: Unchecked Author: IFitz-James Date: 9/15/2016 10:41:28 AM Color: Depth: PROVIDE A COPY OF THE UPDATEDEROSION CONTROL PLAN IN REPORT. PROVIDE A COMPLETED BOND QUANTITYWORKSHEET IN THE REPORT. THE CITY IS USING ANEW BOND QUANTITY WORKSHEET. IT HAS BEENINCLUDED WITH YOUR COMMENTS. INCLUDE MAINTENANCE REQUIREMENTSFOR CATCH BASINS FROM APPENDIX AOF THE 2009 KCSWDM. REVISE PLAN AS NECESSARY. PROVIDE A BASIN MAP SHOWING TDA 1 AND 2 PROVIDE A DEVELOPED BASIN MAP SHOWING PERVIOUS SURFACES, IMPERVIOUS SURFACES , AND POLLUTION GENERATING IMPERVIOUS SURFACES. EXPLAIN HOW FLOW CONTROL FOR THE DRIVEWAY DRAINAGE IS BEING PROVIDED. UPDATE FLOW CONTROL CALCULATIONS TO ACCOUNT FOR A FULLY PAVED 16' DRIVE AISLE FOR THE EXTENTS OF THE PROJECT. YOU MIGHT WANT TO CONSIDER THE USE OF PERVIOUS PAVEMENT FOR THE DRIVE AISLE. THE GEOTECHNICAL REPORT STATES THAT AN OVERFLOW SYSTEM SHALL BE INCLUDED IN THE DESIGN. REVISE DESIGN OR PROVIDE GEOTECHNICAL SUPPORT FOR A DESIGN WITHOUT AN OVERFLOW SYSTEM. PROVIDE A COPY OF THE UPDATED EROSION CONTROL PLAN IN REPORT. PROVIDE A COMPLETED BOND QUANTITY WORKSHEET IN THE REPORT. THE CITY IS USING A NEW BOND QUANTITY WORKSHEET. IT HAS BEEN INCLUDED WITH YOUR COMMENTS. INCLUDE MAINTENANCE REQUIREMENTS FOR CATCH BASINS FROM APPENDIX A OF THE 2009 KCSWDM.