Loading...
HomeMy WebLinkAboutJ_Supplemental Modification re refuse, recycling, and bicycle parking 4.13.23 1 SOUNDERS FC AT LONGACRES Modification Request: Refuse/Recycling and Bicycle Parking April 12, 2023 Background: On January 12, 2023, the City of Renton Hearing Examiner approved a site plan, conditional use permit, and street modification for the Seattle Sounders FC and associated teams into the Longacres Office Park at 1901 Oakesdale Ave. SW, Renton, WA 98057 (the “Final Decision”). The Final Decision included 12 conditions. On April 6, 2023, the City of Renton approved a minor modification to the Final Decision’s approved site plan (LUA23-000103, MOD). The minor modification includes the Final Decision’s conditions identified in the Hearing Examiner decision. Sounders FC and Unico Properties are preparing and submitting permit applications consistent with the Final Decision. Submitted permit applications include a grade/fill permit for g round improvements and a building permit for tenant improvements at Building 25-20. Forthcoming applications will include a fence variance and building permit and a maintenance shed building permit. In addition to this work, Unico Properties continues to prepare a Master Plan for the broader Longacres Campus. The Final Decision identified this master planning effort as an appropriate basis for modifying/deferring certain code requirements.1 Pursuant to RMC 4-9-250, this modification application addresses (1) refuse/recycling and (2) bicycling parking that responds to the 15 items identified in the City of Renton’s modification checklist. 1. Waiver Form. This applicatfon tracks the City of Renton’s Modificatfon Submittal Requirements form. 2. Land Use Permit Application Form. Please see the attached applicatfon form. 3. Fees. The applicant will pay the fee via credit card. Please phone Julia Reeve at 206.552.4381 for payment. 4. Project Narrative. The project narratfve remains unchanged from the initfal applicatfon, associated Final Decision, and the site plan minor modificatfon. This modificatfon addresses recycling / refuse and bicycle parking : a. Refuse/Recycling. Final Decision Condition #4 requires “632 SF of recycling and 1,264 SF of refuse deposit areas, or a modification from these requirements …” Sounders FC and Unico Properties propose to modify the refuse/recycling standards to be consistent with the existing refuse/recycling area in existing Building 25-20. The modified refuse/recycling area is identified in Exhibit A. For trash collection, recycling/refuse is moved to the loading area located to the east of Building 25-20 accessed via the southernmost Oakesdale curb cut fronting the 1 Final Decision, p. 22, condition 11. 2 structure. This modification request responds to Responding to RMC 4-4-090 and Final Decision Condition #4. b. Bicycle Parking. Defer the provision of 16 bicycle parking spaces untfl the completfon of the broader Longacres Master Plan. This modificatfon request responds to Responding to RMC 4-4-080F.11.a and Final Decision Conditfon 5. 5. Justification for the Modification Request. The City of Renton Code authorizes the director to approve modificatfon requests if there are practfcal difficultfes in carrying out the provisions of the City’s zoning code. To approve the modificatfon request, the Director must find that (1) the strict letter of the code is impractfcal, (2) that the intent and purpose of the governing land use designatfon of the comprehensive plan is met, and (3) that modificatfon is in conformity with the intent and purpose of the code. The City must also find that the modificatfon satfsfies criteria a-e in the RMC 4-9-250D.2. The City’s handout for modificatfons adds a sixth criterion. Impractical a. Refuse/Recycling. Compliance to today’s standards would require new and costly improvements to an existfng structure. Building 25-20 is a legal nonconforming structure that has had the same recycling/refuse area since it was constructed.2 The existfng recycling/refuse area has adequately served a fully tenanted building for decades. It is impractfcal to expand the existfng refuse/recycling area when there is no demonstrated need to expand this area. b. Bicycle Parking. The proposal is to defer the bicycle parking during the ongoing Longacres master planning process. This deferral will allow Unico Propertfes and the City to thoughtiully locate bicycle parking so that its locatfon does not work at cross-purposes with the master planning efforts and vision. Intent of the Comprehensive Plan a. and b. Refuse/Recycling/Bicycle Parking. The property’s comprehensive plan land use designation is Employment Area. As identified in the City’s Staff Report to the Hearing Examiner: “Employment Areas provide a significant economic development and employment base for the City.”3 The modification supports a proposal to re-tenant an abandoned Boeing Headquarters, consistent intent of the intent of the Employment Area comprehensive plan land use designation. 2 Alternatively, the City could determine that Building 25-20 is a legal nonconforming structure and compliance with today’s recycling/refuse standards are inapplicable under Ch. 4-10 RMC. Unico Properties does not waive any legal nonconforming rights associated with Building 25-20 through the submittal of this modification. 3 Staff Report, p. 6 of 33, item 17. 3 Intent of the Code a. Refuse/Recycling. The intent of the code is to have adequate refuse/recycling facilitfes for commercial structures. As described above, the existfng refuse/recycling area has adequately served a fully tenanted Building 25-20 for decades. b. Bicycle Parking. The intent of the code is to provide bicycling parking. Code-compliant bicycle parking will be provided, but the provision of bicycle parking will be deferred to align with broader Longacres master planning efforts that are currently underway. RMC 4-9-250D.2 Approval Criteria a. Substantially implements the policy direction of the policies a nd objectives of the Comprehensive Plan Land Use Element and the Community Design Element and the proposed modification is the minimum adjustment necessary to implement these policies and objectives; Response: The project remains the same. The Final Decision found that the proposal is consistent with the City’s comprehensive plan, development regulations, and design standards.4 Testimony before the Hearing Examiner and the Final Decision specifically contemplated a modification to allow existing recycling/refuse areas to satisfy the City’s applicable standards. The quantity of bicycle parking is not modified, only the timing for the provision of bicycle parking. b. Will meet the objectives and safety, function, appearance, environmental protection and maintainability intended by the Code requirements, based upon sound engineering judgment; Response: No engineering judgment is necessary. As described above, the existing refuse/recycling areas are adequate. Bicycle parking will be provided, although the provision of the bicycling parking will be deferred to align with the ongoing master planning efforts. c. Will not create substantial adverse impacts to other property(ies) in the vicinity; Response: As shown in the previously submitted site map, the proposal’s location is relatively isolated, bordered by Oakesdale and other Unico Properties holdings. The refuse/recycling area has proven to be sufficient for decades. The bicycle parking will be deferred, which will have no impact to other properties in the vicinity. d. Conforms to the intent and purpose of the Code; Response: See intent/purpose of the code analysis above. 4 Final Decision at p. 16-17. 4 e. Can be shown to be justified and required for the use and situation intended ; Response: See analysis re “impractical” above. f. Will not create adverse impacts to other property(ies) in the vicinity. Response: The proposal was analyzed under SEPA. The City used its code and SEPA authority to mitigate any impacts. Maintaining Building 25-20’s existing refuse/recycling will have no adverse impact on other property in the vicinity. Similarly, the deferral of bicycle parking will not create an adverse impact to other property in the vicinity. 6. Neighborhood Detail Map. No change. Included in initfal submittal. 7. Site Plan. No change. Modified site plan included in LUA23-000103, MOD. 8. Architectural Elevations. No change. Included in initfal submittal. 9. [No #9 in checklist] 10. Biological Assessment / Critical Areas Study. No change. Included in initfal submittal. 11. Utilities Plan. No change. To be addressed with grade/fill permit. 12. Geotechnical Report. No change. Included with grade/fill permit. 13. Wetland Assessment. No change. Included in initfal submittal. 14. Standard Stream or Lake Study. No change. 15. Flood Hazard Data. No change. Included in initfal submittal.