Loading...
HomeMy WebLinkAboutMFP23001715.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP23001715 IVR Number: 23001715 Permit Information Permit Name: Puget Sound Energy - Electric Address/Location:04/03/2023Application Date:7227500180Parcel Number: 2420 NE 9TH PL Permit Type:04/20/2023Issue Date:Franchise Permit Work Class:04/19/2024Expiration Date:Minor Utility Job Number: 101158171Franchise Type:Electric Description: Puget Sound Energy Electric crew will be removing L/E between grid number 318445 166579 & 318453 166579. crew will be replacing pole, adding xfmr at grid # 318453 166579. Crew to run service wire at p02 Contacts Name Address PhoneTypeBilling Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031ApplicantX Vicki Henson Potelco Inc 8001 212th St S Kent, WA 98032 B: (253) 863-0484Contractor Business License Number: 5109Electrical Contractor: POTELI*344O4 Construction Contractor: POTELI*227PL Puget Sound Energy Inc 10885 NE 4th Street, PSE08-N08 Bellevue, WA 98009 B: (888) 225-5773Emergency Contact HOU KARL 177 107TH AVE NE #2403 BELLEVUE , WA 98004 Owner Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031Specialized Billing General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. DEPARTMENT OF PUBLIC WORKS Page 1 of 3 | Published: 10/27/2021 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN APPLICATION Published: 10/27/2021 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. 1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents. 2. The following items are all required for submittal of the TCP Application: ☐Electronic Copy of the TCP Application ☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall: Include map(s) showing the location of the project and work area. Be legible lettering and clear, contrasting, symbols of viewing or printing. Must indicate street names, and north arrow and scale. Types of plans required: o Work hour plan – show all mobility impacts during construction hours. o Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. o Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. o Pedestrian access/detour plan, if applicable. - Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. 3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].” Project Name: Permit #: Site Address: Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Construction Company: Contact Name: Phone/Cell: _________________________ Business Address: City/State: Zip: Description of Work: Approval By: _________________________________________________ Date:____________________ Transportation Engineering PLEASE SEE ATTACHED POTELCO, INC 6905 S 228TH ST KENT, WA 98032 101158171 2420 NE 9th Pl Tony Contrares 253-243-5816 MFP23001715 Monday - Friday 8:00AM - 3:00PM Scott Warlick CED 4/20/2023 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 3 | Published: 10/27/2021 PERMIT HOLDER AGREES TO ALL THE FOLLOWING: Must have approved Traffic Control Plan (TCP) prior to commencing the work. Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the traveled way. Comply with all traffic regulations of the City of Renton and the State of Washington. Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends and holidays) prior to starting any work. Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140 with any questions. Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes. Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. All permit conditions shall be met. NOTES: Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by a traffic control plan layout or reference to WSDOT. Approved Temporary Traffic Control Plan must be at the work site during work hours. Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 3 of 3 | Published: 10/27/2021 In the case of Temporary No Parking Zones, all the following apply in addition to previous: Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). I certify that the information on this application and within the submittal documents are accurate to the best of my knowledge and I acknowledge all the requirements on this application. Applicant’s Signature Date Applicant’s Name (Print) CORRIE RYDBERG 1616 13131616 1212NE 9TH PL ALLEY NE 9TH ST EDMONDS AVE NEEDMONDS AVE NE1212DAYTON AVE NECAMAS AVE NE2420 P02 STOP FLAGGER STOP FLAGGER W20-7A W20-4ONE LANEROADAHEAD100'100'100'ROADWORKAHEADW20-1 RESIDENT(S) WILL BE INFORMED OF TEMPORARY DRIVEWAY CLOSURE PLACE SIGNS ALONG WORK AREAFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARKFLAGGERS SHALL STOP TRAFFIC IN ALL DIRECTIONS (SHORT DURATION: APPROX 10 MINUTES) FOR LINE DROP. P01 W20-7ABEPREPAREDTOSTOPW3-4100'100' 100'ROADWORKAHEADW20-1ROADWORK AHEAD W20-1BEPREPARED TO STOP W3-4100'100'ROADWORKAHEADW20-1BEPREPAREDTOSTOPW3-4100'100'W20-7AROADWORKAHEADW20-1 BEPREPAREDTOSTOPW3-4 100' 100'100' ROAD WORK AHEAD W20-1BEPREPAREDTO STOP W3-4100'100'W20-7AROAD WORK AHEAD W20-1W20-4ONE LANEROADAHEAD100'100'100'1111 1212 Project Address: Page PSE PUGETSOUNDENERGY Designer: Job # REV Ina Ustemchuk 425-398-6063 ina.ustemchuk@pse.com 1 OF 32420 NE 9th Pl, Renton, WA 0 513828961 03/07/2023 Puget Sound EnergyTraffic Control Supervisor: Ina Ustemchuk Card No. 012928 Card Exp.07/31/2025 ina.ustemchuk@pse.com (425)398-6063 TEMPORARY TRAFFIC CONTROL PLAN N SIGN SPACING MPH 60/65 45/55 35/40 30 25 "X" 1000' 500' 350' 200' 100' CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 36" x 36" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 10' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m unless otherwise specified. All work for arterials and major roadways will be from 9 a.m. to 3 p.m. 28" TRAFFIC CONE LEGEND TRAFFIC FLOW SIGN LOCATION FLAGGER STOP POLE WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY11111111STOP FLAGGER STOP FLAGGER FLAGGER FOR DRIVEWAY CONTROL STOP FLAGGER FLAGGERS TO BE PLACED AT EACH DRIVEWAY WITHIN THE WORK AREA WORK AREA MFP23001715 1616 1616 1212NE 9TH PL NE 9TH PLALLEY NE 9TH ST EDMONDS AVE NE1212DAYTON AVE NECAMAS AVE NE2420 P02 M M02 M01 STOP FLAGGER STOP FLAGGER W20-7A W20-4ONE LANEROADAHEAD100'100'100'ROADWORKAHEADW20-1 W20-7A100'ROAD WORKAHEAD W20-1W20-4ONE LANEROADAHEAD100'100'ROADWORKAHEADW20-1 BEPREPAREDTOSTOPW3-4 100'100'ROADWORKAHEADW20-1BEPREPAREDTOSTOPW3-4100'100' RESIDENT(S) WILL BE INFORMED OF TEMPORARY DRIVEWAY CLOSURE PLACE SIGNS ALONG WORK AREAFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PAR K FLAGGERS SHALL STOP TRAFFIC IN ALL DIRECTIONS (SHORT DURATION: APPROX 10 MINUTES) FOR LINE DROP.X'X'PLACE W20-1 SIGNS ON ALL ADJACENT STREETS WITHIN FEET OF WORK AREA ROAD WORKAHEAD W20-1ROADWORKAHEADW20-11111 1212 TEMPORARY TRAFFIC CONTROL PLAN N SIGN SPACING MPH 60/65 45/55 35/40 30 25 "X" 1000' 500' 350' 200' 100' CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 Project Address: Page PSE PUGETSOUNDENERGY Designer: Job # REV Ina Ustemchuk 425-398-6063 ina.ustemchuk@pse.com 2 OF 32420 NE 9th Pl, Renton, WA 0 513828961 03/07/2023 Puget Sound EnergyTraffic Control Supervisor: Ina Ustemchuk Card No. 012928 Card Exp.07/31/2025 ina.ustemchuk@pse.com (425)398-6063 Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 36" x 36" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 10' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m unless otherwise specified. All work for arterials and major roadways will be from 9 a.m. to 3 p.m. 28" TRAFFIC CONE LEGEND TRAFFIC FLOW SIGN LOCATION FLAGGER STOP POLE WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY MFP23001715 1616 1616 1212NE 9TH PL NE 9TH PLALLEY NE 9TH ST EDMONDS AVE NE1212DAYTON AVE NECAMAS AVE NE2420 P02 M M02 M01 STOP FLAGGER STOP FLAGGER W20-7A W20-4ONE LANEROADAHEAD100'100'100'ROADWORKAHEADW20-1 W20-7A100'ROAD WORKAHEAD W20-1W20-4ONE LANEROADAHEAD100'100'ROADWORKAHEADW20-1 BEPREPAREDTOSTOPW3-4 100'100'ROADWORKAHEADW20-1BEPREPAREDTOSTOPW3-4100'100' RESIDENT(S) WILL BE INFORMED OF TEMPORARY DRIVEWAY CLOSURE PLACE SIGNS ALONG WORK AREAFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARKFLAGGERS SHALL STOP TRAFFIC IN ALL DIRECTIONS (SHORT DURATION: APPROX 10 MINUTES) FOR LINE DROP.X'X'PLACE W20-1 SIGNS ON ALL ADJACENT STREETS WITHIN FEET OF WORK AREA ROAD WORK AHEAD W20-1ROADWORKAHEADW20-11111 1212 Project Address: Page PSE PUGETSOUNDENERGY Designer: Job # REV Ina Ustemchuk 425-398-6063 ina.ustemchuk@pse.com 3 OF 32420 NE 9th Pl, Renton, WA 0 513828961 03/07/2023 Puget Sound EnergyTraffic Control Supervisor: Ina Ustemchuk Card No. 012928 Card Exp.07/31/2025 ina.ustemchuk@pse.com (425)398-6063 TEMPORARY TRAFFIC CONTROL PLAN N SIGN SPACING MPH 60/65 45/55 35/40 30 25 "X" 1000' 500' 350' 200' 100' CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 36" x 36" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 10' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m unless otherwise specified. All work for arterials and major roadways will be from 9 a.m. to 3 p.m. 28" TRAFFIC CONE LEGEND TRAFFIC FLOW SIGN LOCATION FLAGGER STOP POLE WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY MFP23001715 24082404 2326 2316 2320 2312 2321231723132309 2401 2419 2423 2400 2320 2316 2308 2312 933 929 925 919 915 909 903 2408 2412 2416 2420 2424 2428 NE 9TH PL NE 9TH ST 50 ROW DWY #6 CUBHIG13318445-166579 25 kVA 120/240V (B) SLAH5127 318470-166578 SLAH5128318471-166555 25 kVA 120/240V (B)318472-166528 25 kVA 120/240V (B) 318453-166579 37.5 kVA 120/240V (A) SITE PLAN POWER GENERAL NOTES - RESIDENTIAL PROJECT N Vicinity Map 47.4979, -122.1860 Owner / Developer Contact Info officeATTN: SEATOWN ELECTRIC, PLUMBING, HEATING, AIR 4200 78TH ST SW MUKILTEO, WA 98275 PENNY CHRISTIANSON 425-510-6480 OVERHEAD CIRCUIT MAP SCALE: 6" = 1 MILE ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. CIRCUIT LOADING TABLE AS OF EXIST. PEAK LOAD EST. NEW LOAD TOTAL CIRCUIT: A PHASE B PHASE C PHASE HIG-13 10/22 262.00 251.00 269.00 0.00 1.89 0.00 262.00 252.89 269.00 HP Svc/MSA Distribution Removal Replacement OH Misc Superior ORDER#NOTIF# PWR PROJECT PHASE 593249818513871935 593249817 108144364 101158172 593249816 CABLE TV PHONE GAS FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. 10. 7. 6. 5. 4. 3. 2. 1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. Roads shall be paved or have a compacted , crushed rock base in place. CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them. All work is to be done in accordance with local municipal and county permit requirements as applicable. Inclement weather conditions may cause delays in construction times and dates. EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. 8. 9. Installed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER INSTALLATION Company ID#: Primary phase connected to: Tested Secondary Voltage Material ID#: P02 318453-166579 37.5kVA 6211300 SCALE: 1" = 50'101158171THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) Service Stubs 101158171513828961 PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required" UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP T. CONTRERAS 206-637-3648 2/28/23 H. DAY 253-243-5816 2/28/23 H. DAY 253-243-5816 2/28/23 RW-129291 RENTON HOU RESIDENCE B/O POLE, INSTALL TRF & MODIFIED SERVICE TO NEW METER 2420 NE 9TH PL RENTON, WA 98056 N/A N/A N/A 101158171 AS SHOWN 1 OF 1 KING N/A N/A CSPSKEPM NE 8-A2N-305 N/A N/A 2305E029 2305E040 2305E029 HIG-13 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A E-Mail: Cell Phone: Project Manager Contact Information: Manager:TONY CONTRERAS 206-637-3648 TONY.CONTRERAS@PSE.COMJOB SITE JOB SITE CIRCUIT FEET ADDED: -160' LRC: % V. Drop: % Flicker: Sq. Footage: Panel Size: Heat Type: Est. Demand: 1850 SQ. FT. 200 AMPS ELECTRIC 12.9 KW 80A 2.6% 2.9% 00 1"2" 00 50'100' UTILITY POLE EROSION CONTROL DETAIL TOP VIEW FLOWING DITCH or BODY OF WATER SLOPE Secure bottom of fence with gravel bags Place straw mulch on disturbed areaExcavated or Augered Hole Pole SLOPE Not to scale Adjacent to flowing ditches or bodies of water Install silt fence around pole excavation SECONDARY CABLE REMOVAL TABLE Work Location Wire Size Quantity Length (per conductor) Remarks From To P01 P02 SEC 1/0 UG TPX 4 160' POLE RETIREMENT TABLE TEMP TRANSFERS ST. LIGHT TRANSFERS Wk Loc Pole Data Pole TEL TV FIBER TRAN RMVD ID NUMBER Grid #Length Class Year TOPPED RMVD P02 318453-166579 40'UNK 1966 POLE TABLE (NEW) Work Location Pole Data Grid #Height Class Year Remarks / Location Ref. P02 318453-166579 45'CL-3 SITE SPECIFIC NOTES AT P01: 318445-166579 -EXISTING 45' CL3 2017 DISTRIBUTION POLE TO REMAIN AT P02: 318453-166579 -B/O EXISTING 40', 1966 CL-UNK POLE -INSTALL (1) 45' CL-3 DISTRIBUTION POLE W/GROUNDS AS STAKED PER STD 6010.1000 (PD453) -INSTALL 1Ø POLE TOP PIN PER STD 6031.1010 (TAN115) -INSTALL (1) 37.5 KVA OH TRF 120/240V W/ LB C/O (FUSE @ 15T) PER STD 6025.1000 (TRFPXF) -INSTALL GRID# AT M01: METER BASE -REMOVE EXISTING OH METER AT M02: METER BASE -INSTALL NEW 200A OH METER SPAN SPECIFIC NOTES: -SEE SITE PLAN, ONE-LINE DRAWING AND TABLES FOR NEW INSTALLS SERVICE LINE(UTILITY OWNED) SERVICE MASTCONNECTION POINT 26' 18' 12'13' STATE HIGHWAYS STREETS, ALLEYS, COUNTY ROADS, DRIVEWAYS, AND PARKING AREAS RESIDENTIAL PROPERTY OVERHEAD SERVICE CLEARANCE DETAIL SCALE: NONE CUSTOMER DEVELOPMENT NOTES: A PRE CONSTRUCTION MEETING IS REQUIRED WITH YOUR PROJECT MANAGER PRIOR TO STARTING ANY SITE WORK. CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGET SOUND ENERGY STANDARDS & LOCAL MUNICIPALITY. **DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL** CUSTOMER IS RESPONSIBLE FOR THE FOLLOWING: JOB SITE READINESS. -JOB SITE NEEDS TO BE 100% READY FOR INSPECTION 5 BUSINESS DAYS PRIOR TO CONSTRUCTION DATE. -ALL WORK IN RIGHT OF WAY MUST BE COORDINATED WITH PROJECT MANAGER AND LOCAL MUNICIPALITY. -ALL LOCAL ELECTRICAL MUNICIPALITIES AKA "L&I, CITY", INSPECTIONS MUST BE COMPLETED 5 BUSINESS DAYS PRIOR TO SCHEDULED CONSTRUCTION DATE. -REQUIRED TO OPERATE AND PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS, VAULTS & TRENCH AT ALL TIMES. -IF A SECOND INSPECTION IS REQUIRED, ADDITIONAL FEE'S WILL BE APPLIED. -IF A PRE-CON IS REQUIRED BY THE CITY, COUNTY OR W.S. DOT A PSE PROJECT MANAGER WILL SET-UP AND SCHEDULE A MEETING WITH THE MUNICIPALITY BEFORE ANY EXCAVATION OR INSTALLATION BEGINS. SERVICE BRACKET SERVICE DROP NO. 6 COPPERWELD, AIRCRAFT CABLEOR EQUIVALENT 3/4" RIGID GALVANIZED 45˚MIN 18" MIN SEEDETAIL 1 FLASHING STRUCTURAL FRAMING AND FINISH MATERIALS 5/16" U-BOLT 2" X 4" BACKING BLOCKING BETWEENMAST AND BUILDING RIGID STEEL CONDUIT STRUCTURALFRAMING AND FINISH MATERIALS GROUND GROUND 5/16" U-BOLT 2" X 4" BACKING RIGID STEELCONDUIT CONDUIT OR EQUIVALENT ENDSFLATTENED AND DRILLED SHARP BEND; NO RADIUS(SEE DETAIL 2)45˚ MIN COLLARS, CYCLONEFENCE CLAMP OR EQUIVALENTWITH 3/8" MIN BOLT SIZE WEATHERHEAD DETAIL 1 DETAIL 2 GALVANIZEDTHIMBLE AND CABLE CLAMP FLASHING OR MASTIC METHOD OF GUYING ATTACHMENT SEE DETAIL 1 GALVANIZED BOLT;EYE-BOLT OPTIONAL PULL 60˚ - 90˚ GUY WIRES 60˚ - 90˚ APART PULL COLLARS, CYCLONE FENCECLAMP OR EQUAL WITH 3/8" MIN BOLT SIZE GUYED SERVICE MAST DETAIL SCALE: NONE OH Misc Service MFP23001715RESTORATION PER CITY OF RENTON STANDARDS