Loading...
HomeMy WebLinkAboutMFP23001712DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Major Franchise Permit: MFP23001712 IVR Number: 23001712 Permit Information Permit Name: Puget Sound Energy - Electric Address/Location:04/03/2023Application Date:0293850040Parcel Number: 5516 NE 13TH PL Permit Type:04/25/2023Issue Date:Franchise Permit Work Class:04/24/2024Expiration Date:Major Utility Job Number: 101154981Franchise Type:Electric Description: Puget Sound Energy Electric CREW TO PARK IN ROW AT V01 (318684 167632). NO HS CUTS. Restoration per City of Renton standards Contacts Name Address PhoneTypeBilling Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031ApplicantX Scott Warlick 1055 S Grady Way Renton, WA 98057 Applicant Test UserContact Puget Sound Energy Inc 10885 NE 4th Street, PSE08-N08 Bellevue, WA 98009 B: (888) 225-5773Emergency Contact GILL DIMPY+RAMINDERPAL 5516 NE 13TH PL RENTON , WA 98059 Owner Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031Specialized Billing General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. DEPARTMENT OF PUBLIC WORKS Page 1 of 3 | Published: 10/27/2021 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN APPLICATION Published: 10/27/2021 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. 1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents. 2. The following items are all required for submittal of the TCP Application: ☐Electronic Copy of the TCP Application ☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall: Include map(s) showing the location of the project and work area. Be legible lettering and clear, contrasting, symbols of viewing or printing. Must indicate street names, and north arrow and scale. Types of plans required: o Work hour plan – show all mobility impacts during construction hours. o Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. o Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. o Pedestrian access/detour plan, if applicable. - Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. 3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].” Project Name: Permit #: Site Address: Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Construction Company: Contact Name: Phone/Cell: _________________________ Business Address: City/State: Zip: Description of Work: Approval By: _________________________________________________ Date:____________________ Transportation Engineering PLEASE SEE ATTACHED POTELCO, INC 6905 S 228TH ST KENT, WA 98032 101154981 5516 NE 13TH PL Stephen Kvamme 253-553-6200 Monday Friday MFP23001712 8:00AM 3:00PM Huy Huynh CED 4/25/2023 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 3 | Published: 10/27/2021 PERMIT HOLDER AGREES TO ALL THE FOLLOWING: Must have approved Traffic Control Plan (TCP) prior to commencing the work. Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the traveled way. Comply with all traffic regulations of the City of Renton and the State of Washington. Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends and holidays) prior to starting any work. Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140 with any questions. Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes. Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. All permit conditions shall be met. NOTES: Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by a traffic control plan layout or reference to WSDOT. Approved Temporary Traffic Control Plan must be at the work site during work hours. Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. MFP23001712 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 3 of 3 | Published: 10/27/2021 In the case of Temporary No Parking Zones, all the following apply in addition to previous: Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). I certify that the information on this application and within the submittal documents are accurate to the best of my knowledge and I acknowledge all the requirements on this application. Applicant’s Signature Date Applicant’s Name (Print) CORRIE RYDBERG MFP23001712 5516 NE 13th Pl Renton WA 98059 USAV011212NE 1 3 T H P L SE 100TH PLSTOP FLAGGER STOP FLAGGERW2 0 - 7AW20-4ONE LANEROADAHEADX'X'X'ROADWORKAHEADW2 0 -1 W20-7A W20-4ONE LANEROADAHEADX'X'X'ROADWORKAHEADW20-1 PLACE SIGNSBOTH SIDES OFWORK AREAFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PAR K FRO M TO TO W A W A Y A R E A PH O N E 8 8 8 - 9 9 9 9 INFR A S O U R C E L L C 0 0 0 0 0 0 0 0 0 0 N O P A R K I N G NO-PARKRESIDENT(S) WILL BE INFORMEDOF POSSIBLE TEMPORARYDRIVEWAY CLOSUREUSE MAXIMUM AVAILABLESPACE FOR SIGNSTEMPORARY TRAFFIC CONTROL PLANNSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040Project Address:PagePSEPUGETSOUNDENERGYDesigner:Job #REVMatlock Highbarger(808) 375-4152Matlock.Highbarger@PSE.com1 OF 15516 NE 13th Pl, Renton, WA0 11899190 03/05/2023Puget Sound EnergyTraffic Control Supervisor:Gregory HarwoodCard No. 012238Card Exp. 09/30/2023gregory.harwood@pse.com(425)424-6425Notes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 10' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.LEGEND28" TRAFFIC CONESIGN LOCATIONTRAFFIC FLOWUG/BOX/VAULTVaultWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYMFP23001712 V01 318684 167632 25kVA 120/240V REPLACE EXST XFMR W/ 37.5kVA 120/240V MOUNT BAKER AVE NESE R E N T O N-I S S A Q U A H R D '5511'148TH AVE SENE 1 3 T H P L NE 13TH ST '5516' '5510' '5504' '1314' '5424' '5505' '1308' '1302' '1307' '1301' NE 13TH ST 148TH AVE SEV01 318684 167632 25kVA 120/240V REPLACE EXST XFMR W/ 37.5kVA 120/240V Potelco, Inc.DESIGNED BY THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG No No No Yes Yes Yes "Flagging Required" "Outages Required" "Locates Required" MAKE NO CHANGES TO THIS JOB WITHOUT PRIOR APPROVAL Notify Customers and Service Area 48 HRS Prior To Planned Outages ORDER#NOTIF#PROJECT PHASE MAINTENENCE O & M SUPERIOR FAILED SILICONE REMOVAL EXPENSE 11899190 101154981 N/A 584049075 N/A For contacts below dial 1-888-CALL PSE (225-5773) Contact Information FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. N/A N/A N/A GENERAL UNDERGROUND NOTES: CONSTRUCTION OF ELECTRICAL SYSTEM MUST COMPLY TO PUGET SOUND ENERGY STANDARDS. OWNER/DEVELOPER RESPONSIBILITIES: PROVIDE ALL TRENCHING, BACKFILL (SELECT BACKFILL AND COMPACTION TO 95% OF ORIGINAL DENSITY IN CROSSINGS) AND RESTORATION WITHIN THIS PROJECT. LOCATE: THE ONE CALL CENTER (1-800-424-5555) MUST BE NOTIFIED 48 HOURS IN ADVANCE OF CONSTRUCTION SO ALL UTILITIES CAN BE LOCATED PRIOR TO ANY DIGGING. INSTALLED BY PSE MUST BE 18 INCHES MINIMUM IN WIDTH & SHALL HAVE A MINIMUM OF 36 INCHES COVER OVER THE TOP OF THE CONDUCTOR OR FROM THE TOP OF THE CONDUIT TO THE POINT OF FINAL GRADE. PROVIDE 3 INCHES OF SAND BEDDING BELOW & 6 INCHES OF SAND BACKFILL. THE REMAINING BACKFILL MAY CONSIST OF NATIVE MATERIALS IF SUITABLE (I.E.; FREE FROM ROCKS, SHARP OBJECTS OR CORROSIVE MATERIALS THAT MAY DAMAGE CABLES OR CONDUITS). IF NATIVE MATERIALS ARE UNSUITABLE, AS DETERMINED BY PSE OR ITS INSPECTOR, SELECT BACKFILL SHALL BE SUPPLIED BY THE CUSTOMER. BACKFILL THE EXCAVATION TO FINISHED GRADE AT 2 INCHES BELOW THE VAULT TOP AS SOON AS PRACTICAL AFTER FACILITIES ARE PLACED AND INSPECTED.THE SPOILS PILE MUST BE LOCATED A MINIMUM OF 24 INCHES FROM THE OPEN TRENCH.THE TRENCH SHALL PROVIDE ADDITIONAL WIDTH AS NEEDED TO MAINTAIN A 12 INCH MINIMUM HORIZONTAL SEPARATION BETWEEN POWER CONDUITS OR CABLE & ADJACENT UTILITY SERVICES. TRENCHING-SERVICE: THE CUSTOMER'S SERVICE TRENCH MUST MEET STATE & LOCAL REGULATORY REQUIREMENTS. SECONDARY TRENCHES SHALL HAVE A MINIMUM OF 24 INCHES COVER. PROVIDE 3 INCHES OF SAND BEDDING BELOW & 6 INCHES OF SAND BACKFILL. A 48 SQUARE INCH WORK PIT MUST BE PROVIDED AT THE METER BASE. THE TRENCH SHALL PROVIDE ADDITIONAL WIDTH AS NEEDED TO MAINTAIN A 12 INCH MINIMUM HORIZONTAL SEPARATION BETWEEN CONDUITS OR CABLE & ADGACENT UTILITY SERVICES. THE SPOILS PILE MUST BE LOCATED A MINIMUM OF 24 INCHES FROM THE OPEN TRENCH. VAULT EXCAVATION: SIX INCHES (6") OF CRUSHED ROCK IS TO BE USED AS THE VAULT BASE. BACKFILL AROUND VAULTS SHOULD CONSIST OF GOOD COMPACTIBLE MATERIAL SUCH AS CLEAN EARTH FILL, CRUSHED ROCK, OR SAND. NO VOIDS SHOULD REMAIN BETWEEN THE VAULT WALLS & THE SIDES OF THE EXCAVATION. STAKING: PRIOR TO CONSTRUCTION, LOT LINE AND GRADE STAKES WILL BE PROVIDED BY THE CUSTOMER/DEVELOPER. SITE PREPARATION: PRIOR TO CONSTRUCTION, THE WORK AREA WILL BE AT OR NEAR FINISHED GRADE AND CLEAR OF ANY SPOILS OR CONSTRUCTION MATERIALS WHICH WOULD RESTRICT CONSTRUCTION ACCESS. TRENCHING-PRIMARY: TRENCHES SUPPLIED FOR PRIMARY SYSTEMS OWNED & EQUIPMENT ACCESS: ADEQUATE SPACE IS TO BE MAINTAINED AROUND PSE'S FACILITIES, UNIMPEDED BY FENCES, ROCKERIES, WALLS, STRUCTURES, ETC. Vault & Equipment Table Site Grid Number Vault Size & Cover Type & Size Equipment In Vault Primary Bushings Electric Construction Notes LB DC V01 318684 167632 EXST 36X42X38 Minipad HH Matid: 7662010 NEW PM XFMR 37.5kVA, 120/240V Matid: 6247050 1 1 SITE PLAN SCALE: 1:50 Removed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER REMOVAL Company ID#: Primary phase connected to: Tested Secondary Voltage V01 318684-167632 25kVA Installed at site: Grid Number: kVA Rating: TRANSFORMER INSTALLATION (PM) Company ID#: Primary phase connected to: Tested Secondary Voltage Material ID#: Foreman to redline the following information 37.5kVA 120/240v 6247050 V01 318684-167632 XFMR SELECTION Existing XMFR Design Criteria Proposed XMFR Location Nameplate Rating (kVA) Current XMFR Peak Demand Peak Demand Percent of Nameplate (%) Residence Heating Type (%)Max. Allowable Peak Demand Percent of Nameplace (%) (Sec. 6315.0032)kW kVA Resistance/Gas Air Conditioning / Heat Pump Nameplate Rating (kVA) Peak Demand Percent of Nameplate (%) V01 25 41 43.16 172.63 0 100 130 37.5 115.09 EXISTING UG MAP: 2305E012 SCALE: 1:100 101154981 VICINITY MAP UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP R. Trombley 360-399-8923 12/16/22 C. Buher 425-457-9536 12/16/22 N/A N/A N/A A. Altayyar 206-765-0987 12/16/22 N/A CITY OF RENTON MAP-16 TRANSFORMER REPLACEMENT REPLACE/UPGRADE ONE UG TRANSFORMER 5516 NE 13TH PL, RENTON, WA 98059 N/A N/A 101154981 AS NOTED 1 OF 1 KING N/A N/A QCSOKE S03-T23N-R05E N/A N/A 2305E012 2305E040 2305E012 MAP-16 N/A N/A N/A N/A N/A N/A N/A N/A N/A S. Kvamme 253-553-6200 12/16/22 JOB SITE JOB SITE SITE SPECIFIC NOTES V01 - (318684-167632) -REMOVE EXISTING 25kVA 120/240V XFMR (MID: 6247000) -INSTALL NEW 37.5kVA 120/240V XFMR (MID: 6247050)ON EXISTING VAULT -INST 1 NEW 1/0 PRI ELBOW (6041.1000 ELB10J) -INST 1 NEW DUST CAP (MID: 7630600) -RECONNECT EXIST SEC SVCS (2-45X) (2-57) 1/31/2023425.559.5712 MFP23001712 Restoration per City of Renton standards Pothole all existing utilities