Loading...
HomeMy WebLinkAbout20180398E003_Renton_ES_16_2023-04-19_FR_088 Kirkland | Tacoma | Mount Vernon 425-827-7701| www.aesgeo.com Date Mailed: Principal / PM: Bruce Guenzler, L.G., L.E.G. This document is considered a DRAFT until signed or initialed by an AESI Principal or Project Manager Page 1 of 2 v.7.20 FIELD REPORT Date Project Name Project No. Report No. 04/19/2023 Renton Elementary School 16 20180398E003 088 Location Municipality AESI Project Manager AESI Field Rep 1075 Duvall Ave NE Renton Bruce Guenzler, L.E.G. Alex Ybarra, Sr. Staff Geologist Permit No. Client/Owner Attn Requested By B21004604 Renton School District No. 403 Ed Thomson Contractor Engineer/Architect General Contractor Grading Contractor Weather CPL / Hutteball + Oremus Cornerstone/Kyle Continental Dirt Contractors/ Jerry Jr. Cloudy, 50s THE FOLLOWING WAS NOTED: Associated Earth Sciences Inc. (AESI) was on-site today to observe paving. Upon arrival we met with representatives of Olympic Paving and Cornerstone. Paving: While we were on-site we observed Olympic Paving pace for two driveways (Fig 1). Asphalt was placed and compacted approximately 4” thick. Asphalt consisted of ½” HMA, AESI was provided with a rice value of 158.8 from the asphalt plant. Asphalt was compacted utilizing a large and medium vibratory roller. AESI completed compaction tests on the surface and achieved results which meet or exceed compaction specifications (Table 1). AESI departed the site in the PM and will return upon request. *93% compaction required for passing result Test Locations Wet Density (pcf) Provided Rice Value (pcf) Rice % Pass/Fail* 1 Fig 1 156.2 158.8 98 Pass 2 Fig 1 152.3 158.8 96 Pass Table 1: Values for compaction tests completed. 16 Date Project Name Project No. Report No. 04/19/2023 Renton ES 16 20180398E003 088 Page 2 of 2 FIELD REPORT Figure 1: Blue shaded areas show the approximate location of paving observed. Boxed numbers show the approximate location of compaction tests completed.