Loading...
HomeMy WebLinkAbout20180398E003_Renton_ES_16_2022-11-22_FR_072 Kirkland | Tacoma | Mount Vernon 425-827-7701| www.aesgeo.com Date Mailed: Principal / PM: Bruce Guenzler, L.G., L.E.G. This document is considered a DRAFT until signed or initialed by an AESI Principal or Project Manager Page 1 of 2 v.7.20 FIELD REPORT Date Project Name Project No. Report No. 11/22/2022 Renton Elementary School 16 20180398E003 072 Location Municipality AESI Project Manager AESI Field Rep 1075 Duvall Ave NE Renton Bruce Guenzler, L.E.G. Roberto Piemontese Permit No. Client/Owner Attn Requested By B21004604 Renton School District No. 403 Ed Thomson Contractor Engineer/Architect General Contractor Grading Contractor Weather CPL / Hutteball + Oremus Cornerstone/Kyle Continental Dirt Contractors/ Jerry Jr. Rain, 40s THE FOLLOWING WAS NOTED: AESI arrived on site at 11:300am at the request of the contractor to perform compaction tests on the electrical trench backfill. When we arrived on site, we met with representatives with Cornerstone. We could not find the sub-contractor for the trench backfill. Electrical Trench Backfill: Upon arrival, the northern portion of the trench was already backfilled, meanwhile the southern one was only excavated 2 feet deep below ground level and. Due to rain, the open trench was collecting water and being filled with it. We performed 3 tests and collected a sample to run a Modified Proctor. All compaction tests met the specification requirements of at least 95% compaction. The test results and locations are shown in Table 1 and Figure 1. Test No. Location Depth (ft) Material Proctor DD (pcf) / Opt. W (%) DD (pcf) W (%) Compaction (%) Pass/Fail 1 See Fig1 0 Import 121.7 / 5.4 119.1 12.1 98 Pass 2 See Fig1 0 Import 121.7 / 5.4 116.7 11.9 96 Pass 3 See Fig1 0 Import 121.7 / 5.4 118.3 11.7 97 Pass Table 1: Compaction test results. Electrical trench backfill. Final elevation as a reference elevation. Figure 1: Approximate backfill for the electrical trench in yellow. Tests in red. 3 2 1 16 Date Project Name Project No. Report No. 11/22/2022 Renton ES 16 20180398E003 072 Page 2 of 2 FIELD REPORT Photo 1: Electrical trench backfill progress. Facing South. Photo 2: Electrical trench excavation. Left picture facing South and right picture facing North.