Loading...
HomeMy WebLinkAbout20180398E003_Renton_ES_16_2022-11-30_FR_073 Kirkland | Tacoma | Mount Vernon 425-827-7701| www.aesgeo.com Date Mailed: Principal / PM: Bruce Guenzler, L.G., L.E.G. This document is considered a DRAFT until signed or initialed by an AESI Principal or Project Manager Page 1 of 2 v.7.20 FIELD REPORT Date Project Name Project No. Report No. 11/30/2022 Renton Elementary School 16 20180398E003 073 Location Municipality AESI Project Manager AESI Field Rep 1075 Duvall Ave NE Renton Bruce Guenzler, L.E.G. Roberto Piemontese Permit No. Client/Owner Attn Requested By B21004604 Renton School District No. 403 Ed Thomson Contractor Engineer/Architect General Contractor Grading Contractor Weather CPL / Hutteball + Oremus Cornerstone/Kyle Continental Dirt Contractors/ Jerry Jr. Cloudy, 30s THE FOLLOWING WAS NOTED: AESI arrived on site at 10:30am at the request of the contractor to perform compaction tests on the electrical trench backfill. When we arrived on site, we met Jason for the trench backfill. Electrical Trench Backfill: Upon arrival, the contractor was working on some patches along the electrical trench that needed to be backfilled. They informed us that the trench will be mostly below a sidewalk. We performed 10 compaction tests. 8 compaction tests met the specification requirement of at least 95% compaction and 2 compaction tests did not meet the specification requirement. The two failing tests were on the southern access road. The contractor informed us that later in the day they compact again the area identified. The results and locations are shown in Table 1 and Figure 1. Test No. Location Depth (ft) Material Proctor DD (pcf) / Opt. W (%) DD (pcf) W (%) Compaction (%) Pass/Fail 1 See Fig1 0 Import 121.7 / 5.4 122.5 15.8 99+ Pass 2 See Fig1 0 Import 121.7 / 5.4 116.7 16.7 96 Pass 3 See Fig1 0 Import 121.7 / 5.4 115.9 16.4 95 Pass 4 See Fig1 0 Import 121.7 / 5.4 119.1 14.5 98 Pass 5 See Fig1 0 Import 121.7 / 5.4 116.9 11.0 96 Pass 6 See Fig1 0 Import 121.7 / 5.4 121.7 10.1 99+ Pass 7 See Fig1 0 Import 121.7 / 5.4 123.5 13.7 99+ Pass 8 See Fig1 0 Import 121.7 / 5.4 110.7 12.1 91 Fail 9 See Fig1 0 Import 121.7 / 5.4 112.5 11.9 92 Fail 10 See Fig1 0 Import 121.7 / 5.4 121.3 11.7 99 Pass Table 1: Compaction test results. Electrical trench backfill. Final elevation as a reference elevation. Figure 1: Approximate backfill for the electrical trench in yellow. Tests in red. 1 2 3 4 5 6 7 8 9 10 16 Date Project Name Project No. Report No. 11/30/2022 Renton ES 16 20180398E003 073 Page 2 of 2 FIELD REPORT Photo 1: Electrical trench backfill progress. Patch to be backfilled. Facing North. Photo 2: Electrical trench backfill. Facing North.