Loading...
HomeMy WebLinkAbout20180398E003_Renton_ES_16_2022-12-01_FR_074 Kirkland | Tacoma | Mount Vernon 425-827-7701| www.aesgeo.com Date Mailed: Principal / PM: Bruce Guenzler, L.G., L.E.G. This document is considered a DRAFT until signed or initialed by an AESI Principal or Project Manager Page 1 of 2 v.7.20 FIELD REPORT Date Project Name Project No. Report No. 12/01/2022 Renton Elementary School 16 20180398E003 074 Location Municipality AESI Project Manager AESI Field Rep 1075 Duvall Ave NE Renton Bruce Guenzler, L.E.G. Roberto Piemontese Permit No. Client/Owner Attn Requested By B21004604 Renton School District No. 403 Ed Thomson Contractor Engineer/Architect General Contractor Grading Contractor Weather CPL / Hutteball + Oremus Cornerstone/Kyle Continental Dirt Contractors/ Jerry Jr. Cloudy, 30s THE FOLLOWING WAS NOTED: AESI arrived on site at 9:30am at the request of the contractor to perform compaction tests on the electrical trench backfill. When we arrived on site, we met Jason for the trench backfill. Electrical Trench Backfill: The material was covered by 1 inch of light/fluffy snow. We have been informed by the contractor that failing tests from field report 73 have not yet been addressed. We performed 5 compaction tests. All tests met the specification requirement of at least 95% compaction. The contractor has been informed of the results. The results and locations are shown in Table 1 and Figure 1. The contractor told us that we will be needed on site in 1 month. During that visit, we will test the southern entrance again. Test No. Location Depth (ft) Material Proctor DD (pcf) / Opt. W (%) DD (pcf) W (%) Compaction (%) Pass/Fail 1 See Fig1 0 Import 121.7 / 5.4 124.7 10.1 99+ Pass 2 See Fig1 0 Import 121.7 / 5.4 117.1 9.3 96 Pass 3 See Fig1 0 Import 121.7 / 5.4 120.4 8.0 99 Pass 4 See Fig1 0 Import 121.7 / 5.4 126.1 9.5 99+ Pass 5 See Fig1 0 Import 121.7 / 5.4 120.5 9.5 99 Pass Table 1: Compaction test results. Electrical trench backfill. Final elevation as a reference elevation. Figure 1: Approximate backfill for the electrical trench in yellow. Tests in red. Southern entrance in green. 2 3 4 51 16 Date Project Name Project No. Report No. 12/01/2022 Renton ES 16 20180398E003 074 Page 2 of 2 FIELD REPORT Photo 1: Electrical trench backfill progress. Southern entrance. Facing North.