Date Project Name Project No. Report No.
12/01/2022 Renton Elementary School 16 20180398E003 074
Location Municipality AESI Project Manager AESI Field Rep
1075 Duvall Ave NE Renton Bruce Guenzler, L.E.G. Roberto Piemontese
Permit No. Client/Owner Attn Requested By
B21004604 Renton School District No. 403 Ed Thomson Contractor
Engineer/Architect General Contractor Grading Contractor Weather
CPL / Hutteball + Oremus Cornerstone/Kyle Continental Dirt Contractors/ Jerry Jr. Cloudy, 30s
THE FOLLOWING WAS NOTED:
AESI arrived on site at 9:30am at the request of the contractor to perform compaction tests on the electrical trench backfill.
When we arrived on site, we met Jason for the trench backfill.
Electrical Trench Backfill:
The material was covered by 1 inch of light/fluffy snow. We have been informed by the contractor that failing tests from
field report 73 have not yet been addressed. We performed 5 compaction tests. All tests met the specification
requirement of at least 95% compaction. The contractor has been informed of the results. The results and locations are
shown in Table 1 and Figure 1.
The contractor told us that we will be needed on site in 1 month. During that visit, we will test the southern entrance again.
Test
No. Location Depth (ft) Material Proctor
DD (pcf) / Opt. W (%) DD (pcf) W (%) Compaction (%) Pass/Fail
1 See Fig1 0 Import 121.7 / 5.4 124.7 10.1 99+ Pass
2 See Fig1 0 Import 121.7 / 5.4 117.1 9.3 96 Pass
3 See Fig1 0 Import 121.7 / 5.4 120.4 8.0 99 Pass
4 See Fig1 0 Import 121.7 / 5.4 126.1 9.5 99+ Pass
5 See Fig1 0 Import 121.7 / 5.4 120.5 9.5 99 Pass
Table 1: Compaction test results. Electrical trench backfill. Final elevation as a reference elevation.
Figure 1: Approximate backfill for the electrical trench in yellow. Tests in red. Southern entrance in green.
2 3 4 51
16
Date Project Name Project No. Report No.
12/01/2022 Renton ES 16 20180398E003 074
Page 2 of 2
FIELD REPORT
Photo 1: Electrical trench backfill progress. Southern entrance. Facing North.