Loading...
HomeMy WebLinkAbout20180398E003_Renton_ES_16_2022-12-09_FR_075 Kirkland | Tacoma | Mount Vernon 425-827-7701| www.aesgeo.com Date Mailed: Principal / PM: Bruce Guenzler, L.G., L.E.G. This document is considered a DRAFT until signed or initialed by an AESI Principal or Project Manager Page 1 of 2 v.7.20 FIELD REPORT Date Project Name Project No. Report No. 12/09/2022 Renton Elementary School 16 20180398E003 075 Location Municipality AESI Project Manager AESI Field Rep 1075 Duvall Ave NE Renton Bruce Guenzler, L.E.G. Roberto Piemontese Permit No. Client/Owner Attn Requested By B21004604 Renton School District No. 403 Ed Thomson Contractor Engineer/Architect General Contractor Grading Contractor Weather CPL / Hutteball + Oremus Cornerstone/Kyle Continental Dirt Contractors/ Jerry Jr. Cloudy, 40s THE FOLLOWING WAS NOTED: AESI arrived on site at 11:00am at the request of the contractor to observe the curb&gutter and sidewalk subgrade. When we arrived on site, we met Jerry with Continental Dirt Contractors. Curb&Gutter and Sidewalk Subgrade: Upon arrival, the contractor was grading the sidewalk on site. We observed sidewalk subgrade visually and with a ½ inch diameter steel T-probe. Hand probe penetration averaged approximately 2 inches and appeared firm and unyielding. In our opinion the subgrade is suitable for placing concrete. The contractor should remove any future significant standing water or disturbed surface soils if observed, before the pour. Figure 1: In yellow the approximate location of the backfill observed today. 16 Date Project Name Project No. Report No. 12/09/2022 Renton ES 16 20180398E003 075 Page 2 of 2 FIELD REPORT Photo 1: Curb&Gutter subgrade observed on the South-West corner. Facing South. Photo 2: Portion of the sidewalk subgrade observed. Facing East.