FIELD REPORT
Date Project Name Project No. Report No.
12/09/2022 Renton Elementary School 16 20180398E003 075
Location Municipality AESI Project Manager AESI Field Rep
1075 Duvall Ave NE Renton Bruce Guenzler, L.E.G. Roberto Piemontese
Permit No. Client/Owner Attn Requested By
B21004604 Renton School District No. 403 Ed Thomson Contractor
Engineer/Architect General Contractor Grading Contractor Weather
CPL / Hutteball + Oremus Cornerstone/Kyle Continental Dirt Contractors/ Jerry Jr. Cloudy, 40s
THE FOLLOWING WAS NOTED:
AESI arrived on site at 11:00am at the request of the contractor to observe the curb&gutter and sidewalk subgrade. When
we arrived on site, we met Jerry with Continental Dirt Contractors.
Curb&Gutter and Sidewalk Subgrade:
Upon arrival, the contractor was grading the sidewalk on site. We observed sidewalk subgrade visually and with a ½
inch diameter steel T-probe. Hand probe penetration averaged approximately 2 inches and appeared firm and
unyielding. In our opinion the subgrade is suitable for placing concrete. The contractor should remove any future
significant standing water or disturbed surface soils if observed, before the pour.
Figure 1: In yellow the approximate location of the backfill observed today.
16
Date Project Name Project No. Report No.
12/09/2022 Renton ES 16 20180398E003 075
Page 2 of 2
FIELD REPORT
Photo 1: Curb&Gutter subgrade observed on the South-West corner. Facing South.
Photo 2: Portion of the sidewalk subgrade observed. Facing East.