Loading...
HomeMy WebLinkAbout20180398E003_Renton_ES_16_2022-12-13_FR_076 Kirkland | Tacoma | Mount Vernon 425-827-7701| www.aesgeo.com Date Mailed: Principal / PM: Bruce Guenzler, L.G., L.E.G. This document is considered a DRAFT until signed or initialed by an AESI Principal or Project Manager Page 1 of 2 v.7.20 FIELD REPORT Date Project Name Project No. Report No. 12/13/2022 Renton Elementary School 16 20180398E003 076 Location Municipality AESI Project Manager AESI Field Rep 1075 Duvall Ave NE Renton Bruce Guenzler, L.E.G. Roberto Piemontese Permit No. Client/Owner Attn Requested By B21004604 Renton School District No. 403 Ed Thomson Contractor Engineer/Architect General Contractor Grading Contractor Weather CPL / Hutteball + Oremus Cornerstone/Kyle Continental Dirt Contractors/ Jerry Jr. Cloudy, 40s THE FOLLOWING WAS NOTED: AESI arrived on site at 12:00pm at the request of the contractor to observe the backfill in the parking lot. When we arrived on site, we met Jerry Jr. with Continental Dirt Contractors. Parking Lot: AESI observed driveway subgrades in areas highlighted in images below. Most of the area appeared firm and unyielding, but localized areas of soft subgrade probed 8 inches or more. We understand paving in this area is not planned for a month or more. We recommended proof rolling this area around a week before paving to allow time to complete remedial preparation in any soft spots that remain at that time. Figure 1: driveway areas observed (see text) 16 Date Project Name Project No. Report No. 12/13/2022 Renton ES 16 20180398E003 076 Page 2 of 2 FIELD REPORT Photo 1: Subgrade observed today, photo facing North. Photo 2: Area with soft spots. T-probe penetrating for about 12 inches. Facing North.