Loading...
HomeMy WebLinkAbout20180398E003_Renton_ES_16_2023-02-01_FR_083 Kirkland | Tacoma | Mount Vernon 425-827-7701| www.aesgeo.com Date Mailed: Principal / PM: Bruce Guenzler, L.G., L.E.G. This document is considered a DRAFT until signed or initialed by an AESI Principal or Project Manager Page 1 of 3 v.7.20 FIELD REPORT Date Project Name Project No. Report No. 2/1/2023 Renton Elementary School 16 20180398E003 083 Location Municipality AESI Project Manager AESI Field Rep 1075 Duvall Ave NE Renton Bruce Guenzler, L.E.G. Jake Talbot Permit No. Client/Owner Attn Requested By B21004604 Renton School District No. 403 Ed Thomson Contractor Engineer/Architect General Contractor Grading Contractor Weather CPL / Hutteball + Oremus Cornerstone/Kyle Continental Dirt Contractors/ Jerry Jr. P/C 40s THE FOLLOWING WAS NOTED: Associated Earth Sciences Inc. (AESI) was on-site today around 11am to perform compaction tests over HMA for the parking lot and to observe driveway subgrade for a nearby residence. HMA Compaction Tests Parking Lot Upon our arrival, Olympic Paving was placing HMA starting from the south end of the parking lot located at the south side of the site (Photo 1). A single 3-inch lift of HMA was being placed and compacted using a mid-sized smooth drum roller and a vibratory plate compactor. AESI performed 5 compaction tests today using a nuclear densometer. All tests met or exceeded the minimum specified compaction of the RICE value. While we were onsite, Olympic Paving informed us that the plant ran out of natural gas and will not be placing anymore HMA for the rest of the day. Compaction test results are shown in Table 1 and their approximate locations on Figure 1 below. Neighbor’s Driveway Subgrade While onsite, AESI observed the subgrade for the neighbor’s driveway located at the southwest corner of the site (Photo 2). We observed the subgrade to be firm and unyielding probing no more than 1 to 2 inches using a ½” diameter steel t-probe. Continental informed us that they plan on place 11/4” minus crushed rock sometime in the future. AESI left the site in the afternoon and will return upon the contractor’s request. Table 1: Compaction Test Results Test No. Location Elevation Below Final Grade % MA Wet Density RICE 1 See Figure 1 3” lift 96 152.4 158.6 2 See Figure 1 3” lift 94 149.2 158.6 3 See Figure 1 3” lift 93 147.8 158.6 4 See Figure 1 3” lift 93 148.1 158.6 5 See Figure 1 3” lift 95 150.8 158.6 16 Date Project Name Project No. Report No. 2/1/2023 Renton ES 16 20180398E003 083 Page 2 of 3 FIELD REPORT Figure 1: Approximate extent of HMA observed today shown in yellow. Location of the neighbor’s driveway subgrade observed today shown in red. Approximate compaction test locations. Test numbers correspond to Table 1. 5 4 3 2 1 16 Date Project Name Project No. Report No. 2/1/2023 Renton ES 16 20180398E003 083 Page 3 of 3 FIELD REPORT Photo 1: South end of parking lot facing east. Photo 2: South end of driveway subgrade facing north.