HomeMy WebLinkAbout20180398E003_Renton_ES_16_2023-02-02_FR_084
Kirkland | Tacoma | Mount Vernon 425-827-7701| www.aesgeo.com
Date Mailed:
Principal / PM: Bruce Guenzler, L.G., L.E.G.
This document is considered a DRAFT until signed or initialed by an AESI Principal or Project Manager
Page 1 of 2
v.7.20
FIELD REPORT
Date Project Name Project No. Report No.
2/2/2023 Renton Elementary School 16 20180398E003 084
Location Municipality AESI Project Manager AESI Field Rep
1075 Duvall Ave NE Renton Bruce Guenzler, L.E.G. Jake Talbot
Permit No. Client/Owner Attn Requested By
B21004604 Renton School District No. 403 Ed Thomson Contractor
Engineer/Architect General Contractor Grading Contractor Weather
CPL / Hutteball + Oremus Cornerstone/Kyle Continental Dirt Contractors/ Jerry Jr. Cloudy 40s
THE FOLLOWING WAS NOTED:
Associated Earth Sciences Inc. (AESI) was on-site today around 11:30am to perform compaction tests over HMA for the parking lot
and to observe driveway subgrade for a nearby residence.
HMA Compaction Tests Parking Lot
Upon our arrival, Olympic Paving continued placing a 3” lift of HMA over the west side of the parking lot. The HMA was compacted
using a mid-sized smooth drum roller and a vibratory plate compactor. AESI performed 6 compaction tests using a nuclear densometer.
All tests met or exceeded the minimum specified compaction of 92% of the RICE value. Compaction test results are shown in Table 1
and their approximate locations on Figure 1 below. AESI left the site by the afternoon and will return upon the contractor’s request.
Table 1: Compaction Test Results
Test No. Location Elevation Below
Final Grade % MA Wet Density RICE
1 See Figure 1 3” lift 94 149.2 158.6
2 See Figure 1 3” lift 94 149.7 158.6
3 See Figure 1 3” lift 93 147.8 158.6
4 See Figure 1 3” lift 96 152.5 158.6
5 See Figure 1 3” lift 95 151.1 158.6
6 See Figure 1 3” lift 92 146.5 158.6
16
Date Project Name Project No. Report No.
2/2/2023 Renton ES 16 20180398E003 084
Page 2 of 2
FIELD REPORT
Figure 1: Approximate extent of HMA observed today outlined in yellow. Approximate compaction test locations. Test numbers
correspond to Table 1.
5 4 3
2
6
1